ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / INDU GANESH HEIGHTS

Completed No litigation declared Residential / Group Housing project

INDU GANESH HEIGHTS

By TIGON REALITY PRIVATE LIMITED

RG-MH-48804 · RERA P51800007655 · Last updated on MahaRERA portal: 12 Oct 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 21 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
0 of 11Construction stages donefurthest along: Excavation, 90%
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

INDU GANESH HEIGHTS is a Residential / Group Housing project by TIGON REALITY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007655 on 17 Aug 2017. The registration is recorded completed; possession was promised by 22 Dec 2020. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NameINDU GANESH HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007655
  • ReraGenie IDRG-MH-48804

Builder

  • NameTIGON REALITY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102MH2012PTC235296
  • GSTIN27AAECT3788P1ZF
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSUMAN KUMAR MEMANI, SUSHANT SONI
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredAug 2017First promiseMar 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion22 Dec 2020
  • Revised completionRevised to 22 Dec 2020 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INDU GANESH HEIGHTSNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

INDU GANESH HEIGHTS: 42% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 12 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered27
Open Space11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area911 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2632.0
Proposed, not sanctioned2,145 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR AMBEDKAR ROAD, SION

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASHTRAPAL JADHAV MS PAARTH ARCHITECTURAL CONSULTANTS
EngineerBHUSHAN SHANGHAVI
PartnerRole in project
TIGON REALITY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012709Mar 2019 → Dec 2020

Reason as filed by the promoterThe building was completely ready for occupation for the members. However, application and receipt of OC was delayed due to procedural issues and thereafter COVID. Detailed explanation is submitted on earlier request for window opening for extension till OC date.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Mar 2021

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration.pdf12 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: INDU GANESH FORM 4_0001.pdf8 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2259115_OC_signed (1).pdf28 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: full cc copy.pdf12 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate compressed.pdf12 Apr 2018
OtherFile: Society Registration Certificate.pdf12 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Nov 2017
Layout approvalFile: IOD.pdf31 Jul 2017
Building plan approvalFile: IOD.pdf31 Jul 2017
PAN CardFile: PAN Card.pdf31 Jul 2017
Copy of the legal title reportFile: Title Clearance.pdf31 Jul 2017
Details of encumbrancesFile: No Encumbrance Certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 Jul 2017
Declaration in FORM BFile: Affidavit 2.pdf31 Jul 2017
Declaration in FORM BFile: Affidavit1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Profroma allotment letter.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement to sale 1.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement to sale 2.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement to sale 3.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement to sale 4.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement to sale 5.pdf31 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement to sale 6.pdf31 Jul 2017
OtherFile: DA1.pdf31 Jul 2017
OtherFile: DA2.pdf31 Jul 2017
OtherFile: DA3.pdf31 Jul 2017
OtherFile: DA5.pdf31 Jul 2017
OtherFile: DA6.pdf31 Jul 2017
OtherFile: DA7.pdf31 Jul 2017
OtherFile: Power of Attorney (2).pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 21 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INDU GANESH HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmINDU GANESH HEIGHTSCompleted 25Lapsed / revoked 9Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 72 registered projects within 2 km.

Builder: TIGON REALITY PRIVATE LIMITED

TIGON REALITY PRIVATE LIMITED has 3 registrations on MahaRERA, including INDU GANESH HEIGHTS and TIGON ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if INDU GANESH HEIGHTS is delayed beyond 22 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDU GANESH HEIGHTS?

The registered promoter entity is TIGON REALITY PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2012PTC235296 and GSTIN 27AAECT3788P1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDU GANESH HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDU GANESH HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDU GANESH HEIGHTS?

The professionals named in the filing: Architect: RASHTRAPAL JADHAV MS PAARTH ARCHITECTURAL CONSULTANTS; Engineer: BHUSHAN SHANGHAVI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDU GANESH HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDU GANESH HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDU GANESH HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.