ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / INDRAYANI RIVERVIEW RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

INDRAYANI RIVERVIEW RESIDENCY

By SHREENATH DEVELOPERS

RG-MH-79386 · RERA P52100051634 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 97%
7 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

INDRAYANI RIVERVIEW RESIDENCY is a Residential / Group Housing project by SHREENATH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100051634 on 27 Jun 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 18 months from the original filing. 3 of the 10 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameINDRAYANI RIVERVIEW RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051634
  • ReraGenie IDRG-MH-79386

Builder

  • NameSHREENATH DEVELOPERS
  • Entity typePartnership
  • PartnersRUPESH KANTILAL MUTHA, DAGDU MAHADU MHASKE, VASANT MANIKCHAND CHORDIYA, NITIN SHIVRAM LOKHANDE
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

4 months past promisethis monthRegisteredJun 2023First promiseDec 2024Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jun 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed81 files

Current status

30%3 of 10 units booked
97.0%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INDRAYANI RIVERVIEW RESIDENCYNA1110010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

INDRAYANI RIVERVIEW RESIDENCY: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Open Space17

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,183 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jul 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI628.45
Proposed, not sanctioned628 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT ALANDI DEVACHI
Estimated costRs 1.28 cr
Cost incurredRs 1.24 cr
Work done97.0%
BuildingWingEstimatedIncurred
INDRAYANI RIVERVIEW RESIDENCYNARs 1.28 crRs 1.24 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREE SAMARTH ASSOCIATES
EngineerSATISH M GHANEKAR
EngineerSHREE SAMARTH KRUPA ASSOCIATES
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
SHREENATH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23072502168Dec 2024 → Jun 2026

Reason as filed by the promoterThe delay happened mainly because: We hereby submit our request for extension of the above-referenced project registration. The delay in project completion has primarily occurred due to unforeseen funding constraints, which have resulted in deferred payments to contractors and, consequently, slower execution of on-site work. No consent of existing member is required however we have introduced 1 flat on 1st & 1 on 4th floor so consent of existing members are attached herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Form 1File: FORM 1.pdf24 Feb 2026
Form 2File: Form 2.pdf24 Feb 2026
Form 3File: Form 3 Final.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 Final.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 Final.pdf24 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A.pdf7 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf7 Nov 2025
Form 1File: FORM 1-1.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 1File: FORM 1-2.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 1File: FORM 1-3.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 1File: FORM 1-4.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 1File: FORM 1-5.pdf19 Aug 2025
Form 2File: Forms-2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 1File: FORM 1-6.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 1File: FORM 1-7.pdf19 Aug 2025
Form 2File: Form 2.pdf19 Aug 2025
Form 3File: Form 3 Final.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf19 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 FINAL.pdf19 Aug 2025
Form 5 (FY 2024-2025)File: FORM 5 FINAL.pdf19 Aug 2025
Other - TechnicalFile: scan20230614_18501851_0210.pdf15 Jun 2023
Other - TechnicalFile: occupancy.pdf5 Jun 2023
Other - TechnicalFile: declaration.pdf25 May 2023
Layout approvalFile: scan0211_1_highlighted_11zon NEW.pdf2 May 2023
Copy of Layout Approval (in case of layout)File: scan0211_1_highlighted_11zon NEW.pdf2 May 2023
Building plan approvalFile: scan0212_2.pdf24 Apr 2023
Building plan approvalFile: scan_3.pdf24 Apr 2023
Building plan approvalFile: scan0209_4.pdf24 Apr 2023
Building plan approvalFile: scan0210_5.pdf24 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0212_2.pdf24 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: scan_3.pdf24 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0209_4.pdf24 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0210_5.pdf24 Apr 2023
Declaration about Commencement CertificateFile: Circular 32.pdf24 Apr 2023
Copy of the legal title reportFile: Legal Title Report.pdf12 Apr 2023
Proforma of Agreement for saleFile: Agreement to sale draft.pdf12 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200264696956_For_Asset_Based_Search_28_03_2023_18_34_16_128.pdf29 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank details Updated.pdf29 Mar 2023
PAN CardFile: Shreenath Developers (PAN).pdf16 Mar 2023
Details of encumbrances concerned to FinanceFile: financial encrumbances.pdf16 Mar 2023
Details of encumbrances concerned to LegalFile: financial encrumbances.pdf16 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf16 Mar 2023
Declaration in FORM BFile: Form B.pdf16 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Pramoters declaration.pdf16 Mar 2023
Proforma of Allotment letterFile: Allotment letter.pdf16 Mar 2023
Deviation Report with respect to Allotment letterFile: Allotment declaration.pdf16 Mar 2023

How this compares with Pune

30%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INDRAYANI RIVERVIEW RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmINDRAYANI RIVERVIEW RESICompleted 84Lapsed / revoked 49Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 223 registered projects within 2 km.

Builder: SHREENATH DEVELOPERS

Shreenath developers has 6 registrations on MahaRERA, including SHREE NATH RESIDENCY and ROYAL CASTLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that INDRAYANI RIVERVIEW RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if INDRAYANI RIVERVIEW RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRAYANI RIVERVIEW RESIDENCY?

The registered promoter entity is SHREENATH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRAYANI RIVERVIEW RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRAYANI RIVERVIEW RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRAYANI RIVERVIEW RESIDENCY?

The professionals named in the filing: Architect: SHREE SAMARTH ASSOCIATES; Engineer: SATISH M GHANEKAR; Engineer: SHREE SAMARTH KRUPA ASSOCIATES; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRAYANI RIVERVIEW RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRAYANI RIVERVIEW RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRAYANI RIVERVIEW RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.