Home / Browse projects / Pune, Maharashtra / INDRAPRASTHA ENCLAVE

Registered No litigation declared Residential / Group Housing project

INDRAPRASTHA ENCLAVE

By Vijay Hanumantrao Dhawan

RG-MH-47380 · RERA P52100055130 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2032Possession promisedmoved 36 months from the original
12 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 90%
13 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

INDRAPRASTHA ENCLAVE is a Residential / Group Housing project by Vijay Hanumantrao Dhawan in Pune, Maharashtra, registered with MahaRERA as P52100055130 on 4 Mar 2024. Possession is promised by 31 Oct 2032. The completion date has moved by 36 months from the original filing. 5 of the 18 units on this registration are recorded sold or booked, and 12 of 55 construction stages are filed complete.

At a glance

Project

  • NameINDRAPRASTHA ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • Nira Road
    • Plot no 17 & 18
    • Gat No 126/1
    • Baramati
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • RERA no.P52100055130
  • ReraGenie IDRG-MH-47380

Builder

  • NameVijay Hanumantrao Dhawan
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2024First promiseOct 2029Revised toOct 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2024
  • Promised completion31 Oct 2032
  • Revised completionRevised to 31 Oct 2032 (originally 31 Oct 2029)
  • Buildings5 building records
  • Documents filed111 files

Current status

28%5 of 18 units booked
42.1%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row Houses B1 To B10NA2210010
Row House A1 And A2NA22202
Row House A3 And A4NA22202
Row House C1 And C2NA22202
Row House C3 And C4NA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 90%.

Row Houses B1 To B1035%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House A1 And A248%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House A3 And A435%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House C1 And C230%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House C3 And C413%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)30%
Plinth0%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Open Space18
BuildingOpen SpaceTotal
Row Houses B1 To B101010
Row House A1 And A222
Row House A3 And A422
Row House C1 And C222
Row House C3 And C422

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,325 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 May 2026

Approvals and building plan

Sanctioning authorityBaramati Muncipal Corporation
Permissible FSI1800.92
Proposed, not sanctioned1,801 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGala No 1, CTS No 612, Satav Complex, DA, Silver Jubilee Hospital Road, Opposite to Naigaonkar Hospi
Estimated costRs 2.71 cr
Cost incurredRs 1.14 cr
Work done42.1%
BuildingWingEstimatedIncurred
Row Houses B1 To B10NARs 1.19 crRs 33.00 lakh
Row House A1 And A2NARs 37.92 lakhRs 35.50 lakh
Row House A3 And A4NARs 37.92 lakhRs 33.00 lakh
Row House C1 And C2NARs 37.92 lakhRs 8.50 lakh
Row House C3 And C4NARs 37.92 lakhRs 4.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanket kalange and Associates
EngineerSanket Kalange and Associates
Chartered AccountantPratik Doshi and Associates
Chartered AccountantParesh Mokashi
PartnerRole in project
Vijay Hanumantrao Dhawan-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027239Oct 2029 → Oct 2032

Reason as filed by the promoterThere is Change in Sanction plan & also till date only 1 booking has been received, hence applied for extension with the consent of the 1 allotte i.e. 100% consent has been obtained

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2032

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2026
Form 2A (FY 2025-2026)File: form 2 A .pdf6 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf27 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Vijay Dhawan.pdf14 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf13 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf19 Oct 2025
Form 1File: Form 1.pdf26 Jul 2025
Form 2File: Form 2.pdf26 Jul 2025
Form 3File: Form No 3 24-25 Q4.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosuure Of Sold book Inventory.pdf26 Jul 2025
Form 1File: Architect Certificate 1.pdf26 Jul 2025
Form 2File: Engineer's Certificate 1.pdf26 Jul 2025
Form 3File: Form No 3 24-25 Q3.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosuer of Sold Boook Enventory.pdf26 Jul 2025
Form 1File: Form 1 24-25 Q2.pdf26 Jul 2025
Form 2File: Form 2 24-25 Q2.pdf26 Jul 2025
Form 3File: Form 3 24-25 Q2.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosuer of Sold Boook Enventory.pdf26 Jul 2025
Form 1File: Form 1 Q1 24-25.pdf26 Jul 2025
Form 2File: Form 2 Q1 24-25.pdf26 Jul 2025
Form 3File: Form 3 CA Q1 24-25.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosuer of Sold Boook Enventory.pdf26 Jul 2025
Form 1File: Arcticture Certificate March 2024.pdf26 Jul 2025
Form 2File: Engineer Certificate March 24.pdf26 Jul 2025
Form 3File: form 3 Ca Qtr 4.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold inventory.pdf26 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf26 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf26 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf26 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf25 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf25 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf25 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf25 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf25 Jul 2025
Other - TechnicalFile: ER certificate for quality assurance ( 31-3-2025).pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ER certificate for quality assurance ( 31-3-2025).pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 24-25 Q4.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosuure Of Sold book Inventory.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 1.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 24-25 Q3.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosuer of Sold Boook Enventory.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Dhawan Patil FY 23 24.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q1.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q2.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Q1.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Q2.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Q1.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q1.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q2.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosuer of Sold Boook Enventory.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA.pdf20 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decl Sep Bank Ac Format A.pdf20 Jun 2024
Deviation Report with respect to Allotment letterFile: Decl Sep Bank Ac Format A.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf14 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFCATE FROM 2.pdf14 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance 2023-24.pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold inventory.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcticture Certificate March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate March 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Ca Qtr 4.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Ca Qtr 4.pdf20 Apr 2024
Other - TechnicalFile: Annexure A Undertaking.pdf17 Feb 2024

How this compares with Pune

28%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INDRAPRASTHA ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Plot no 17 & 18, Gat No 126/1, Baramati13,700+ in Pune

Builder: Vijay Hanumantrao Dhawan

Vijay Hanumantrao Dhawan has 1 registration on MahaRERA, including INDRAPRASTHA ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if INDRAPRASTHA ENCLAVE is delayed beyond 31 Oct 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRAPRASTHA ENCLAVE?

The registered promoter entity is Vijay Hanumantrao Dhawan, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRAPRASTHA ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRAPRASTHA ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRAPRASTHA ENCLAVE?

The professionals named in the filing: Architect: Sanket kalange and Associates; Engineer: Sanket Kalange and Associates; Chartered Accountant: Pratik Doshi and Associates; Chartered Accountant: Paresh Mokashi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRAPRASTHA ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRAPRASTHA ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRAPRASTHA ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.