Home / Browse projects / Amravati, Maharashtra / INDRAKSHI RESIDENCY
INDRAKSHI RESIDENCY
RG-MH-82980 · RERA P50300051825 · Last updated on MahaRERA portal: 25 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INDRAKSHI RESIDENCY is a Residential / Group Housing project by PRAVIN SAHEBRAO MAHALLE in Amravati, Maharashtra, registered with MahaRERA as P50300051825 on 7 Jul 2023. Possession is promised by 15 Aug 2028. 8 of the 20 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameINDRAKSHI RESIDENCY
- TypeResidential / Group Housing
- Location
- MAIN ROAD SAMBHAJI NAGAR NEAR GARDEN
- SAMBHAJI NAGAR (RATHINAGAR) VMV ROAD
- AMRAVATI (M.CORP)
- Amravati (M Corp.)
- Amravati
- 444603
- Pincode444603
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50300051825
- ReraGenie IDRG-MH-82980
Builder
- NamePRAVIN SAHEBRAO MAHALLE
- Entity typeIndividual
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Jul 2023
- Promised completion15 Aug 2028
- Revised completionNone
- Buildings1 building record
- Documents filed67 files
Current status
Figures as on 25 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| INDRAKSHI RESIDENCY | NA | 6 | 6 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
INDRAKSHI RESIDENCY: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed38
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHRADDHA SAGANE devenra sagane |
| Engineer | ANKITA BHOMBE |
| Engineer | MAYURI DEVIDAS ASOLE |
| Chartered Accountant | MANOJ VINDO GUPTA & COMPANY |
| Partner | Role in project |
|---|---|
| PRAVIN SAHEBRAO MAHALLE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Aug 2028
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indrakshi Residency CA_compressed (2).pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: IR CA.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR III Qtr.pdf | 5 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer Certificate IR III Qtr.pdf | 5 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold Inventory IR III Qtr.pdf | 5 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: IR Form 5.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate IR qtr 2.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate MC qtr 2.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate MC qtr 2.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold Inventory MC qtr 2.pdf | 15 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance MC qtr 2.pdf | 15 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAFY23-24.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory IR July 1233.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate IR july.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate IR.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory IR.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate IR N.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate IR.pdf | 18 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance IR.pdf | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory IR.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca3 indrakshi qtr3_11zon.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate IR.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate for Quality Assurance IR.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Information of sold inventory IR .pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca3 indrakshi new_11zon.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect indrakshi 3oct.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indrakshi engineer (1)_11zon.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance indrakshi 3oct.pdf | 9 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold indrakshi 6oct.pdf | 9 Oct 2023 |
| Home Buyer /Allottee Grievance Redressal CellFile: grievances indrakshi.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Not apply indrakshi.pdf | 7 Oct 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: dod indrakshi.pdf | 7 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES FINANCE AND LEGAL.pdf | 24 May 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES FINANCE AND LEGAL.pdf | 24 May 2023 |
| Building plan approvalFile: Indrakshi residancy plan.pdf | 12 May 2023 |
| Layout approvalFile: layout plan indrakshi.pdf | 12 May 2023 |
| PAN CardFile: psm pan.pdf | 12 May 2023 |
| Copy of the legal title reportFile: legel title indrakshi.pdf | 12 May 2023 |
| Details of encumbrances concerned to FinanceFile: financial encumbrance.pdf | 12 May 2023 |
| Details of encumbrances concerned to LegalFile: financial encumbrance.pdf | 12 May 2023 |
| Copy of Layout Approval (in case of layout)File: layout plan indrakshi.pdf | 12 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Indrakshi residancy plan.pdf | 12 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: indrakshi permit (1).pdf | 12 May 2023 |
| Declaration about Commencement CertificateFile: declaration ab comm certi.pdf | 12 May 2023 |
| Declaration in FORM BFile: affidavit indrakshi.pdf | 12 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indrakshi engineer certificate.pdf | 12 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 12 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: indrakshi ca certificate 1.pdf | 12 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTEREST.pdf | 12 May 2023 |
| Proforma of Allotment letterFile: MODEL FORM ALLOTMENT LETTER.pdf | 12 May 2023 |
| Proforma of Agreement for saleFile: Agreement to sale.pdf | 12 May 2023 |
| Proforma of Agreement for saleFile: MODEL DRAFT AGREEMENT TO SALE.pdf | 12 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank ac declaration.pdf | 12 May 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ALLOT N AGREE.pdf | 12 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT ALLOT N AGREE.pdf | 12 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep INDRAKSHI RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAMBHAJI NAGAR (RATHINAGAR) VMV ROAD, AMRAVATI (M.CORP)450+ in Amravati
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
VIJAYSHREE PARK
PANKAJKUMAR RAMESHRAO DESHMUKH
SHIVRAY COMMERCIAL
SHIVRAY BUILDER
VISTA IMPERIA
DEEPRAJAM INFRASPACE LLP
ARJUN EMPIRE MEERA
SHANKAR ARJUNDAS BHATEJA
BHUMI ENCLAVE
BHUMI BUILDERS AND DEVELOPERS
Bluebells Arcade
Mayank Ramesh Dundale
See every Amravati project, with the district possession charts
Builder: PRAVIN SAHEBRAO MAHALLE
PRAVIN SAHEBRAO MAHALLE has 2 registrations on MahaRERA, including INDRAKSHI RESIDENCY and GANESH PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if INDRAKSHI RESIDENCY is delayed beyond 15 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INDRAKSHI RESIDENCY?
The registered promoter entity is PRAVIN SAHEBRAO MAHALLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INDRAKSHI RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INDRAKSHI RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INDRAKSHI RESIDENCY?
The professionals named in the filing: Architect: SHRADDHA SAGANE devenra sagane; Engineer: ANKITA BHOMBE; Engineer: MAYURI DEVIDAS ASOLE; Chartered Accountant: MANOJ VINDO GUPTA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INDRAKSHI RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback