ReraGenieLog inGet a buyer report

Home / Browse projects / Amravati, Maharashtra / INDRAKSHI RESIDENCY

Registered No litigation declared Residential / Group Housing project

INDRAKSHI RESIDENCY

By PRAVIN SAHEBRAO MAHALLE

RG-MH-82980 · RERA P50300051825 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
11 of 11Construction stages doneevery applicable stage filed complete
12 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

INDRAKSHI RESIDENCY is a Residential / Group Housing project by PRAVIN SAHEBRAO MAHALLE in Amravati, Maharashtra, registered with MahaRERA as P50300051825 on 7 Jul 2023. Possession is promised by 15 Aug 2028. 8 of the 20 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameINDRAKSHI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • MAIN ROAD SAMBHAJI NAGAR NEAR GARDEN
    • SAMBHAJI NAGAR (RATHINAGAR) VMV ROAD
    • AMRAVATI (M.CORP)
    • Amravati (M Corp.)
    • Amravati
    • 444603
  • Pincode444603
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300051825
  • ReraGenie IDRG-MH-82980

Builder

  • NamePRAVIN SAHEBRAO MAHALLE
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2023PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion15 Aug 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

40%8 of 20 units booked

Figures as on 25 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INDRAKSHI RESIDENCYNA6620020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

INDRAKSHI RESIDENCY: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Open Space38

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area534 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Aug 2025

Approvals and building plan

Sanctioning authorityamravati muncipal corporation amaravati
Permissible FSI1699.35
Proposed, not sanctioned1,699 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAISTAMBH SQUARE, AMRAVATI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRADDHA SAGANE devenra sagane
EngineerANKITA BHOMBE
EngineerMAYURI DEVIDAS ASOLE
Chartered AccountantMANOJ VINDO GUPTA & COMPANY
PartnerRole in project
PRAVIN SAHEBRAO MAHALLE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Aug 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indrakshi Residency CA_compressed (2).pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: IR CA.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR III Qtr.pdf5 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer Certificate IR III Qtr.pdf5 Jan 2025
Disclosure of sold/ booked inventoryFile: sold Inventory IR III Qtr.pdf5 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: IR Form 5.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate IR qtr 2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate MC qtr 2.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate MC qtr 2.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: sold Inventory MC qtr 2.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance MC qtr 2.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAFY23-24.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory IR July 1233.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate IR july.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate IR.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory IR.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate IR N.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate IR.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance IR.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory IR.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca3 indrakshi qtr3_11zon.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IR.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate IR.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate for Quality Assurance IR.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Information of sold inventory IR .pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca3 indrakshi new_11zon.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect indrakshi 3oct.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indrakshi engineer (1)_11zon.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance indrakshi 3oct.pdf9 Oct 2023
Disclosure of sold/ booked inventoryFile: sold unsold indrakshi 6oct.pdf9 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: grievances indrakshi.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Not apply indrakshi.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Not apply indrakshi.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Not apply indrakshi.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Not apply indrakshi.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Not apply indrakshi.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Not apply indrakshi.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Not apply indrakshi.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Not apply indrakshi.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Not apply indrakshi.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Not apply indrakshi.pdf7 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: dod indrakshi.pdf7 Oct 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES FINANCE AND LEGAL.pdf24 May 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES FINANCE AND LEGAL.pdf24 May 2023
Building plan approvalFile: Indrakshi residancy plan.pdf12 May 2023
Layout approvalFile: layout plan indrakshi.pdf12 May 2023
PAN CardFile: psm pan.pdf12 May 2023
Copy of the legal title reportFile: legel title indrakshi.pdf12 May 2023
Details of encumbrances concerned to FinanceFile: financial encumbrance.pdf12 May 2023
Details of encumbrances concerned to LegalFile: financial encumbrance.pdf12 May 2023
Copy of Layout Approval (in case of layout)File: layout plan indrakshi.pdf12 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Indrakshi residancy plan.pdf12 May 2023
Commencement Certificates / NA Order for plotted developmentFile: indrakshi permit (1).pdf12 May 2023
Declaration about Commencement CertificateFile: declaration ab comm certi.pdf12 May 2023
Declaration in FORM BFile: affidavit indrakshi.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indrakshi engineer certificate.pdf12 May 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: indrakshi ca certificate 1.pdf12 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTEREST.pdf12 May 2023
Proforma of Allotment letterFile: MODEL FORM ALLOTMENT LETTER.pdf12 May 2023
Proforma of Agreement for saleFile: Agreement to sale.pdf12 May 2023
Proforma of Agreement for saleFile: MODEL DRAFT AGREEMENT TO SALE.pdf12 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank ac declaration.pdf12 May 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ALLOT N AGREE.pdf12 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT ALLOT N AGREE.pdf12 May 2023

How this compares with Amravati

40%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep INDRAKSHI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAMBHAJI NAGAR (RATHINAGAR) VMV ROAD, AMRAVATI (M.CORP)450+ in Amravati

2 kmINDRAKSHI RESIDENCYCompleted 18Lapsed / revoked 11Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: PRAVIN SAHEBRAO MAHALLE

PRAVIN SAHEBRAO MAHALLE has 2 registrations on MahaRERA, including INDRAKSHI RESIDENCY and GANESH PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if INDRAKSHI RESIDENCY is delayed beyond 15 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRAKSHI RESIDENCY?

The registered promoter entity is PRAVIN SAHEBRAO MAHALLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRAKSHI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRAKSHI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRAKSHI RESIDENCY?

The professionals named in the filing: Architect: SHRADDHA SAGANE devenra sagane; Engineer: ANKITA BHOMBE; Engineer: MAYURI DEVIDAS ASOLE; Chartered Accountant: MANOJ VINDO GUPTA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRAKSHI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRAKSHI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRAKSHI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.