Home / Browse projects / Bengaluru Urban, Karnataka / IN THAT QUIET EARTH TOWER 8

Registration approved Litigation declared Residential/Group Housing project

IN THAT QUIET EARTH TOWER 8

By Total Environment Constructions Private Limited

RG-KA-14137 · RERA PRM/KA/RERA/1251/446/PR/310125/007467 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 8 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2032Possession promisedno revision filed
0 of 19Construction stages donefurthest along: Earth work and other leveling..., 0%
120 of 120Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 142 documents Report an error

IN THAT QUIET EARTH TOWER 8 is a Residential/Group Housing project by Total Environment Constructions Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/310125/007467 on 31 Jan 2025. Possession is promised by 31 Dec 2032. 0 of the 120 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete.

At a glance

Project

  • NameIN THAT QUIET EARTH TOWER 8
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 562149
  • Pincode562149
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/310125/007467
  • ReraGenie IDRG-KA-14137

Builder

  • NameTotal Environment Constructions Private Limited
  • Entity typeCompany
  • CINU45202KA1985PTC007026
  • GSTIN29AACCT0477D1ZE
  • Authorized SignatorySuresh Chandra Bhandari
  • MdMr. Kamal Sagar
  • DirectorsMr. Veeresh Hiremath, Abraar Ahmed
  • Project HeadKarthick Dhanasekaran
  • Other registrations5 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2025PromisedDec 2032

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Jan 2025
  • Promised completion31 Dec 2032
  • Revised completionNone
  • Buildings1 building record
  • Documents filed142 files

Current status

0%0 of 120 units booked
18.4%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 8---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work0%
Foundation footing work0%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,420 sq m
Named landowners3
LandownerVillageDistrict
Kanakamma--
Total Environment Constructions Pvt.Ltd--
Kanakamma--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 380.15 cr
Cost incurredRs 70.15 cr
Spent of the estimate18.45%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 203.64 crRs 17.38 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 105.58 crRs 27.75 cr
Administrative CostsRs 26.99 cr-
On-site expenditure-Consultants FeesRs 14.26 crRs 25.02 cr
Sales and MarketingRs 13.49 cr-
Property ManagementRs 10.80 cr-
UtilitiesRs 5.40 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVarun Biltoria
EngineerVISHNU KUMAR
Chartered AccountantAnkush Jain

Litigation declared8

CaseCourtStatus
OS No 443/2022/2022III Additional Senior Civil Judge, Bangalore Rural-
OS No 1085/2022/2022IV Additional Senior Civil Judge, Bangalore Rural-
WP No 4484/2021 and 10542/2020/2020High Court of Karnataka-
WP 2333/2021/2021High Court of Karnataka-
OS 1253/2015/2015City Civil court, Bangalore Rural-
TMP/230917/4235RERA Court-
01467/2023/2023RERA Court-
00027/2024/2024RERA Court-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed142

As listed on the registration, under the names the promoter filed them with; the newest 80 of 142 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/310125/007467 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 IN THAT QUIET EARTH TOWER-8 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 IN THAT QUIET EARTH TOWER-8 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 IN THAT QUIET EARTH TOWER-8 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 ITQE T8 Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 ITQE T8 Q1 26-27.PDF15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 ITQE T8 Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 ITQE TOWER 8.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 ITQE TOWER 8.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q4 25-26 ITQE TOWER 8.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA certificates Q3-25-26 pdf.pdf27 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Tower-8.pdf27 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Tower - 8.pdf27 Jan 2026
Signed Demarcation DrawingFile: 1 Signed Demarcation Drawing.pdf24 Jan 2025
Source of funds with supporting docsFile: 2 Source of funds with supporting docs.pdf24 Jan 2025
EC 60_1 (1-04-2004 to 13-12-2024)File: 1 EC 60_1 (1-04-2004 to 13-12-2024).pdf24 Jan 2025
MR 59_1File: 2 MR 59_1.pdf24 Jan 2025
MR 59_5File: 3 MR 59_5.pdf24 Jan 2025
MR 60_1File: 4 MR 60_1.pdf24 Jan 2025
Old Supporting MR copiesFile: 5 Old Supporting MR copies.pdf24 Jan 2025
STP Drawings signed by EngineerFile: 1 STP Drawings signed by Engineer.PDF24 Jan 2025
Clarification on Latest BWSSB and BESCOM NOCFile: 2 Clarification on Latest BWSSB and BESCOM NOC.pdf24 Jan 2025
Land Cost CalculationFile: 3 Land Cost Calculation.PDF24 Jan 2025
Proforma Agreement for Sale-ITQE T8File: 4 Proforma Agreement for Sale-ITQE T8.pdf24 Jan 2025
ITQE - 8 Construction Cost BreakupFile: 5 ITQE - 8 Construction Cost Breakup.pdf24 Jan 2025
Notarized Affidavit for 3(1) violationFile: 6 Notarized Affidavit for 3(1) violation.pdf24 Jan 2025
Proforma Allotment Letter ITQE T8File: 7 Proforma Allotment Letter ITQE T8.pdf24 Jan 2025
NOC BESCOMFile: 8 NOC BESCOM.pdf24 Jan 2025
BWSSB NOC with fee paid receiptFile: 9 BWSSB NOC with fee paid receipt.pdf24 Jan 2025
Source of waterFile: 10 Source of water.PDF24 Jan 2025
RTC, survey 59/1-
Mutation, survey 59/1-
Encumbrance Certificate, survey 59/1-
Conversion/Alienation Order, survey 59/1-
JDA, survey 59/1-
Khatha, survey 59/1-
RTC, survey 59/5-
Mutation, survey 59/5-
Encumbrance Certificate, survey 59/5-
Conversion/Alienation Order, survey 59/5-
Sale/Title/Gift Deed, survey 59/5-
Khatha, survey 59/5-
RTC, survey 60/1-
Mutation, survey 60/1-
Encumbrance Certificate, survey 60/1-
Conversion/Alienation Order, survey 60/1-
JDA, survey 60/1-
Khatha, survey 60/1-
Registration CertificateFile: Certificate Of Incorportation TEC.pdf-
Memorandum of AssociationFile: TE Constructions - MOA.pdf-
Article of AssociationFile: Amended AOA.pdf-
GST CertificateFile: ITQE GST.pdf-
Organization StructureFile: Organisation Structure_10-12-2024.pdf-
Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form 2 AR Certificate.PDF-
Certificate issued by Engineer Form 3File: Form-3 In That Quiet Earth Tower - 8.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for Non-Litigation Details.pdf-
Balance Sheet 2023 - 2024File: TEC Final Accounts 31-03-2024 Signed.pdf-
Balance Sheet 2022 - 2023File: TEC Final Accounts 31-03-2023 Signed.pdf-
Balance Sheet 2021 - 2022File: TEC Final Accounts 31-03-2022 Signed.pdf-
Audited Profit and Loss Statement 2023 - 2024File: TEC Final Accounts 31-03-2024 Signed.pdf-
Audited Profit and Loss Statement 2022 - 2023File: TEC Final Accounts 31-03-2023 Signed.pdf-
Audited Profit and Loss Statement 2021 - 2022File: TEC Final Accounts 31-03-2022 Signed.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: TEC Final Accounts 31-03-2024 Signed.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: TEC Final Accounts 31-03-2023 Signed.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: TEC Final Accounts 31-03-2022 Signed.pdf-
Director's Report 2023 - 2024File: TEC Final Accounts 31-03-2024 Signed.pdf-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationStatusPromisedDelivered
IN THAT QUIET EARTH PHASE 2CKHATHA NO 110, SY NO. 60/2, 60/3, 61/1, 61/2, 61/3 OF BILESHIVALE VILLAGE BIDARAHALLI HOBLI, WARD NO. 54, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 562149OngoingMar 2031Not due yet
IN THAT QUIET EARTH PHASE 2BSy Nos 68, 69/1, 69/2, 69/2(p), 75/1, 75/2, 75/3, 75/10, Bileshivale Village, Bidarahalli Hobli , Bengaluru East Taluk, Ward No. 54, Mahadevapura Zone , BILESHIVALE VILLAGE , Bengaluru East , Bengaluru Urban, Karnataka - 560077OngoingMay 2028Not due yet
IN THAT QUIET EARTH PHASE-2AProperty Katha No. 28 , 46, 110,111 situated at Bileshivale Village, Bidarahalli Hobli, Bengaluru East Taluk, BengaluruOngoingDec 2025Not delivered

How this compares with Bengaluru Urban

0%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep IN THAT QUIET EARTH TOWER 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmIN THAT QUIET EARTH TOWEOther 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Total Environment Constructions Private Limited

Total Environment Constructions Private Limited has 6 registrations on RERA Karnataka, including A Few Honest Words and IN THAT QUIET EARTH PHASE 2C. Its filings declare 5 earlier projects, 1 of them declared completed. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if IN THAT QUIET EARTH TOWER 8 is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of IN THAT QUIET EARTH TOWER 8?

The registered promoter entity is Total Environment Constructions Private Limited, a company as per the filing. Its CIN U45202KA1985PTC007026 and GSTIN 29AACCT0477D1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in IN THAT QUIET EARTH TOWER 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at IN THAT QUIET EARTH TOWER 8?

The professionals named in the filing: Architect: Varun Biltoria; Engineer: VISHNU KUMAR; Chartered Accountant: Ankush Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IN THAT QUIET EARTH TOWER 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IN THAT QUIET EARTH TOWER 8. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IN THAT QUIET EARTH TOWER 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.