Home / Browse projects / Raigarh, Maharashtra / HRISHIKESH - I
HRISHIKESH - I
RG-MH-94007 · RERA P52000018397 · Last updated on MahaRERA portal: 7 Apr 2023
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HRISHIKESH - I is a Residential / Group Housing project by SHREE KRISHNA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000018397 on 30 Oct 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.
At a glance
Project
- NameHRISHIKESH - I
- TypeResidential / Group Housing
- Location
- SECTOR 22
- NAVI MUMBAI
- Kamothe
- Panvel
- Raigarh
- 410209
- Pincode410209
- RERA no.P52000018397
- ReraGenie IDRG-MH-94007
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Oct 2018
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HRISHIKESH - I | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
HRISHIKESH - I: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL ARCHITECTS |
| Engineer | B S SUKTHANKAR |
| Chartered Accountant | JIGAR GADA & ASSOCIATES |
| Chartered Accountant | Rutuja Narsingh |
| Partner | Role in project |
|---|---|
| SHREE KRISHNA DEVELOPERS | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502073 | Himmatrav Dattatraya Chavan | SHREE KRISHNA DEVELOPERS | 25/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Oct 2022
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (2).pdf | 7 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 13 Sept 2022.pdf | 30 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3- Hrishikesh I as on 13 Sept 2022.pdf | 30 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OC Hri 1 Kamothe.pdf | 21 Oct 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: 68A-22-KAMOTHE FORM 4_compressed (1).pdf | 21 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 226.pdf | 30 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 30 June 2022 (1).pdf | 12 Jul 2022 |
| Certificates of CA (Form 3)File: Form 3 of Hrishikesh I - 30-06-2022.pdf | 12 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 31 December 2021.pdf | 7 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 31 March 2022 (1).pdf | 7 Jun 2022 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31th Dec 2021_compressed.pdf | 7 Jun 2022 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31st March 2022_compressed.pdf | 7 Jun 2022 |
| Declaration about Commencement CertificateFile: Cc Declaration(1).pdf | 31 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Inventary.pdf | 31 Jan 2022 |
| CERSAI detailsFile: Hrishikesh 1.pdf | 31 Jan 2022 |
| Building plan approvalFile: Hrishikesh 1 new cc plan-1_11zon.pdf | 4 Jan 2022 |
| Building plan approvalFile: Hrishikesh 1 new cc plan-2_11zon.pdf | 4 Jan 2022 |
| Building plan approvalFile: Hrishikesh 1 new cc plan-4_11zon.pdf | 4 Jan 2022 |
| Building plan approvalFile: Hrishikesh 1 new cc plan-3_11zon.pdf | 4 Jan 2022 |
| Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-1_11zon.pdf | 4 Jan 2022 |
| Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-2_11zon.pdf | 4 Jan 2022 |
| Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-3_11zon.pdf | 4 Jan 2022 |
| Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-4_11zon.pdf | 4 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Hri 1 New Cc.pdf | 4 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrishikesh 1 Sept 2021.pdf | 10 Nov 2021 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 30th Sept 2021.pdf | 10 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate 150- Hrishikesh.pdf | 9 Oct 2021 |
| Declaration about Commencement CertificateFile: Cc Declaration (1).pdf | 21 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-3.pdf | 21 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrshikesh -1 30th June 2021_compressed.pdf | 21 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf | 21 Sep 2021 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 30th June 2021.pdf | 21 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 HRISHIKESH MARCH 2021.pdf | 8 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31st Mar 2021.pdf | 8 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 HRISHIKESH -I SEPT 2020_compressed.pdf | 3 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 HRISHIKESH -I DEC 2020_compressed.pdf | 3 Feb 2021 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 30th Sept 2020.pdf | 3 Feb 2021 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31st Dec 2020.pdf | 3 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Hrishikesh-1 FY 19-20.pdf | 13 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrishikesh-1.pdf | 23 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 March 2020 Shree krishna.pdf | 23 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 June 2020 Shree Krishna_compressed.pdf | 23 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh 1 Jan compressed.pdf | 23 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh 1 31st Mar 2020 compressed.pdf | 23 Sep 2020 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh 1 30th June2020 compressed.pdf | 23 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Hrishikesh-1(2).pdf | 21 Oct 2019 |
| Certificates of CA (Form 3)File: Form 3 Hrishikesh-1-min.pdf | 21 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Form 5 hrishikesh-1.pdf | 21 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA(1).pdf | 17 Jul 2019 |
| Proforma of Allotment letterFile: Hrishikesh Agreement - 3rd June 2019.pdf | 17 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrishikesh-1.pdf | 19 Jun 2019 |
| Certificates of CA (Form 3)File: Form 3 - Hrishikesh(1)-min.pdf | 19 Jun 2019 |
| Proforma of Allotment letterFile: Allotment Letter - 30th April 2019.pdf | 30 Apr 2019 |
| Proforma of Allotment letterFile: Agreement - 30th APril 2019.pdf | 30 Apr 2019 |
| Proforma of Allotment letterFile: final allotment letter Hrishikesh .pdf | 13 Apr 2019 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT - SHREE KRISHNA DEVELOPERS.pdf | 19 Oct 2018 |
| Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale - SHREE KRISHNA DEVELOPERS.pdf | 19 Oct 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf | 17 Oct 2018 |
| Building plan approvalFile: COMMENCEMENT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf | 15 Oct 2018 |
| Building Plan Approval (IOD)File: COMMENCEMENT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf | 15 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf | 15 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf | 15 Oct 2018 |
| Layout approvalFile: LAYOUT PLAN - SHREE KRISHNA DEVELOPERS.pdf | 11 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - SHREE KRISHNA DEVELOPERS.pdf | 11 Oct 2018 |
| Declaration in FORM BFile: FORM B - SHREE KRISHNA DEVELOPERS.pdf | 11 Oct 2018 |
| PAN CardFile: PAN CARD - SHREE KRISHNA DEVELOPERS.pdf | 10 Oct 2018 |
| Details of encumbrancesFile: LETTER OF ENCUMBRANCES - SHREE KRISHNA DEVELOPERS.pdf | 10 Oct 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep HRISHIKESH - I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NAVI MUMBAI5,900+ in Raigarh
Plot No -1 Sector - 28 Khandeshwar Railway Sta
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -2,Sector-39,Mansarovar Railway Statio
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
FLORENCE
VILLA REALCON LLP
One Millennium
MILLENNIUM INFRA
LK VIVANTA
LK DIWANI INFRA
BHAVESHWAR VISTA
BHAVESHWAR INFRA
See every Raigarh project, with the district possession charts
Builder: SHREE KRISHNA DEVELOPERS
SHREE KRISHNA DEVELOPERS has 12 registrations on MahaRERA, including SHREE KRISHNA HEIGHTS and SUNFLOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if HRISHIKESH - I is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HRISHIKESH - I?
The registered promoter entity is SHREE KRISHNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HRISHIKESH - I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HRISHIKESH - I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HRISHIKESH - I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HRISHIKESH - I?
The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: B S SUKTHANKAR; Chartered Accountant: JIGAR GADA & ASSOCIATES; Chartered Accountant: Rutuja Narsingh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HRISHIKESH - I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback