Home / Browse projects / Raigarh, Maharashtra / HRISHIKESH - I

Completed No litigation declared Residential / Group Housing project

HRISHIKESH - I

By SHREE KRISHNA DEVELOPERS

RG-MH-94007 · RERA P52000018397 · Last updated on MahaRERA portal: 7 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

HRISHIKESH - I is a Residential / Group Housing project by SHREE KRISHNA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000018397 on 30 Oct 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHRISHIKESH - I
  • TypeResidential / Group Housing
  • Location
    • SECTOR 22
    • NAVI MUMBAI
    • Kamothe
    • Panvel
    • Raigarh
    • 410209
  • Pincode410209
  • RERA no.P52000018397
  • ReraGenie IDRG-MH-94007

Builder

  • NameSHREE KRISHNA DEVELOPERS
  • Entity typePartnership
  • PartnersNARESH NARSINH PARMAR, SUNIL VALLABHBHAI MAVANI, KAUSHIK NARSINH PARMAR, ROSHAN NARSINHBHAI RAGHWANI
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Oct 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HRISHIKESH - INA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

HRISHIKESH - I: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area649 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1296.11
Proposed, not sanctioned1,296 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCIDCO ADMINISTRATION BUILDING SANPADA EAST NAVI MUMBAI 400 705

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerB S SUKTHANKAR
Chartered AccountantJIGAR GADA & ASSOCIATES
Chartered AccountantRutuja Narsingh
PartnerRole in project
SHREE KRISHNA DEVELOPERS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502073Himmatrav Dattatraya ChavanSHREE KRISHNA DEVELOPERS25/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Oct 2022

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (2).pdf7 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 13 Sept 2022.pdf30 Dec 2022
Certificates of CA (Form 3)File: Form 3- Hrishikesh I as on 13 Sept 2022.pdf30 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OC Hri 1 Kamothe.pdf21 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: 68A-22-KAMOTHE FORM 4_compressed (1).pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 226.pdf30 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 30 June 2022 (1).pdf12 Jul 2022
Certificates of CA (Form 3)File: Form 3 of Hrishikesh I - 30-06-2022.pdf12 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 31 December 2021.pdf7 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hrishikesh 1 Form 2- 31 March 2022 (1).pdf7 Jun 2022
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31th Dec 2021_compressed.pdf7 Jun 2022
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31st March 2022_compressed.pdf7 Jun 2022
Declaration about Commencement CertificateFile: Cc Declaration(1).pdf31 Jan 2022
Disclosure of sold/ booked inventoryFile: Inventary.pdf31 Jan 2022
CERSAI detailsFile: Hrishikesh 1.pdf31 Jan 2022
Building plan approvalFile: Hrishikesh 1 new cc plan-1_11zon.pdf4 Jan 2022
Building plan approvalFile: Hrishikesh 1 new cc plan-2_11zon.pdf4 Jan 2022
Building plan approvalFile: Hrishikesh 1 new cc plan-4_11zon.pdf4 Jan 2022
Building plan approvalFile: Hrishikesh 1 new cc plan-3_11zon.pdf4 Jan 2022
Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-1_11zon.pdf4 Jan 2022
Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-2_11zon.pdf4 Jan 2022
Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-3_11zon.pdf4 Jan 2022
Building Plan Approval (IOD)File: Hrishikesh 1 new cc plan-4_11zon.pdf4 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Hri 1 New Cc.pdf4 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrishikesh 1 Sept 2021.pdf10 Nov 2021
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 30th Sept 2021.pdf10 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate 150- Hrishikesh.pdf9 Oct 2021
Declaration about Commencement CertificateFile: Cc Declaration (1).pdf21 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-3.pdf21 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrshikesh -1 30th June 2021_compressed.pdf21 Sep 2021
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf21 Sep 2021
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 30th June 2021.pdf21 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 HRISHIKESH MARCH 2021.pdf8 Jul 2021
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31st Mar 2021.pdf8 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 HRISHIKESH -I SEPT 2020_compressed.pdf3 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 HRISHIKESH -I DEC 2020_compressed.pdf3 Feb 2021
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 30th Sept 2020.pdf3 Feb 2021
Certificates of CA (Form 3)File: Form 3 Hrishikesh -1 31st Dec 2020.pdf3 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Hrishikesh-1 FY 19-20.pdf13 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrishikesh-1.pdf23 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 March 2020 Shree krishna.pdf23 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 June 2020 Shree Krishna_compressed.pdf23 Sep 2020
Certificates of CA (Form 3)File: Form 3 Hrishikesh 1 Jan compressed.pdf23 Sep 2020
Certificates of CA (Form 3)File: Form 3 Hrishikesh 1 31st Mar 2020 compressed.pdf23 Sep 2020
Certificates of CA (Form 3)File: Form 3 Hrishikesh 1 30th June2020 compressed.pdf23 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Hrishikesh-1(2).pdf21 Oct 2019
Certificates of CA (Form 3)File: Form 3 Hrishikesh-1-min.pdf21 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Form 5 hrishikesh-1.pdf21 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA(1).pdf17 Jul 2019
Proforma of Allotment letterFile: Hrishikesh Agreement - 3rd June 2019.pdf17 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Hrishikesh-1.pdf19 Jun 2019
Certificates of CA (Form 3)File: Form 3 - Hrishikesh(1)-min.pdf19 Jun 2019
Proforma of Allotment letterFile: Allotment Letter - 30th April 2019.pdf30 Apr 2019
Proforma of Allotment letterFile: Agreement - 30th APril 2019.pdf30 Apr 2019
Proforma of Allotment letterFile: final allotment letter Hrishikesh .pdf13 Apr 2019
Copy of the legal title reportFile: LEGAL TITLE REPORT - SHREE KRISHNA DEVELOPERS.pdf19 Oct 2018
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale - SHREE KRISHNA DEVELOPERS.pdf19 Oct 2018
Certificates of CA (Form 3)File: CA CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf17 Oct 2018
Building plan approvalFile: COMMENCEMENT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf15 Oct 2018
Building Plan Approval (IOD)File: COMMENCEMENT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - SHREE KRISHNA DEVELOPERS.pdf15 Oct 2018
Layout approvalFile: LAYOUT PLAN - SHREE KRISHNA DEVELOPERS.pdf11 Oct 2018
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - SHREE KRISHNA DEVELOPERS.pdf11 Oct 2018
Declaration in FORM BFile: FORM B - SHREE KRISHNA DEVELOPERS.pdf11 Oct 2018
PAN CardFile: PAN CARD - SHREE KRISHNA DEVELOPERS.pdf10 Oct 2018
Details of encumbrancesFile: LETTER OF ENCUMBRANCES - SHREE KRISHNA DEVELOPERS.pdf10 Oct 2018

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HRISHIKESH - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI5,900+ in Raigarh

Builder: SHREE KRISHNA DEVELOPERS

SHREE KRISHNA DEVELOPERS has 12 registrations on MahaRERA, including SHREE KRISHNA HEIGHTS and SUNFLOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if HRISHIKESH - I is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HRISHIKESH - I?

The registered promoter entity is SHREE KRISHNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HRISHIKESH - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HRISHIKESH - I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HRISHIKESH - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HRISHIKESH - I?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: B S SUKTHANKAR; Chartered Accountant: JIGAR GADA & ASSOCIATES; Chartered Accountant: Rutuja Narsingh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HRISHIKESH - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HRISHIKESH - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HRISHIKESH - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.