ReraGenieLog inGet a buyer report

Home / Browse projects / Kolhapur, Maharashtra / HIRA MOTI GOLDEN SQUARE PLAZA

Registered No litigation declared Others project

HIRA MOTI GOLDEN SQUARE PLAZA

By HIRA MOTI GOLDEN SQUARE DEVELOPERS LLP

RG-MH-74641 · RERA P53000054807 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
26 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

HIRA MOTI GOLDEN SQUARE PLAZA is a Others project by HIRA MOTI GOLDEN SQUARE DEVELOPERS LLP in Kolhapur, Maharashtra, registered with MahaRERA as P53000054807 on 12 Feb 2024. Possession is promised by 31 Dec 2026. 0 of the 26 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameHIRA MOTI GOLDEN SQUARE PLAZA
  • TypeOthers
  • Location
    • Sangli Kolhapur road
    • Jaysingpur
    • Jaysingpur (M Cl)
    • Shirol
    • Kolhapur
    • 416101
  • Pincode416101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000054807
  • ReraGenie IDRG-MH-74641

Builder

  • NameHIRA MOTI GOLDEN SQUARE DEVELOPERS LLP
  • Entity typeOthers
  • PartnerPraveenkumar Meghraj Baldawa
  • Named personsPraveenkumar Meghraj Baldawa, Golden Square Properties Pvt.Ltd.

Key dates

this monthRegisteredFeb 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

0%0 of 26 units booked
63.1%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hira Moti Golden Square PlazaNA7602626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Hira Moti Golden Square Plaza: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area599 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Praveenkumar Meghraj BaldawaJaysingpur (M Cl)Kolhapur
Golden Square Properties Pvt.Ltd.Kolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityJaysingpur Municipal Council
Permissible FSI2292.82
Proposed, not sanctioned2,293 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 7 Vasant plaza Gandhi Road Jaysingpur Kolhapur416101
Estimated costRs 6.21 cr
Cost incurredRs 3.92 cr
Work done63.07%
BuildingWingEstimatedIncurred
Hira Moti Golden Square PlazaNARs 5.61 crRs 3.77 cr
-NARs 60.00 lakhRs 14.23 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Shirale & Associates
EngineerSachin Shirale & Associates
Chartered AccountantSanjay Vhanbatte & Company
PartnerRole in project
HIRA MOTI GOLDEN SQUARE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect certificate.pdf13 May 2026
Form 2File: Engineer certificate.pdf13 May 2026
Form 3File: self certification.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf13 May 2026
Form 1File: Architect certificate.pdf13 May 2026
Form 2File: Engineer certificate.pdf13 May 2026
Form 3File: Self certification.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory .pdf13 May 2026
Form 1File: Architect certificate .pdf13 May 2026
Form 2File: Engineer certificate.pdf13 May 2026
Form 3File: Self certification .pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory .pdf13 May 2026
Form 1File: Architect certificate.pdf13 May 2026
Form 2File: Engineer certificate.pdf13 May 2026
Form 3File: self certification.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf13 May 2026
Form 1File: Architect certificate.pdf13 May 2026
Form 2File: Engineer certificate.pdf13 May 2026
Form 3File: Self certification.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory .pdf13 May 2026
Form 1File: Architect certificate .pdf13 May 2026
Form 2File: Engineer certificate.pdf13 May 2026
Form 3File: Self certification .pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory .pdf13 May 2026
Form 1File: Architect Certificate .pdf13 May 2026
Form 2File: Engineer Certificate .pdf13 May 2026
Form 3File: Self certifications .pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory .pdf13 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1- HMGS.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CERTIFICATION - HMGS.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-HMGS.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -HMGS.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A -HMGS.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HMGS ARCH CERT SEPT24.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HMGS ARCH CERT DEC24.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HMGS SELF DECL SEPT24.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HMGS SELD DECLARE DEC24.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HMGS ENGG CERT SEPT24.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HMGS ENGG CERT DEC24.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: HMGS SOLD UNSOLD INV SEPT24.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: HMGS SOLD UNSOLD INV DEC24.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold invenory.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold invenory.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration.pdf23 Jul 2024
Other - TechnicalFile: Mail .pdf3 Feb 2024
Other - TechnicalFile: Plan.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf11 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf10 Jan 2024
Building plan approvalFile: Plan.pdf9 Jan 2024
Layout approvalFile: MOJANI NAKASHA.pdf9 Jan 2024
PAN CardFile: e-Pan.pdf9 Jan 2024
Copy of the legal title reportFile: legal title report_11zon (3).pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Finance.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Legal.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Finance.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Legal.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: MOJANI NAKASHA.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Jan 2024
Declaration about Commencement CertificateFile: Format D.pdf9 Jan 2024
Declaration in FORM BFile: Form B promoter.pdf9 Jan 2024
CERSAI detailsFile: Declaaration.pdf9 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf9 Jan 2024
Proforma of Agreement for saleFile: Building Agreement to Sell as per RERA Act 1.pdf9 Jan 2024
Proforma of Allotment letterFile: Allottment Letter - New.pdf9 Jan 2024
Deviation Report with respect to Allotment letterFile: Allotement Letter.pdf9 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Agreement to Sell.pdf9 Jan 2024

How this compares with Kolhapur

0%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep HIRA MOTI GOLDEN SQUARE PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jaysingpur880+ in Kolhapur

Builder: HIRA MOTI GOLDEN SQUARE DEVELOPERS LLP

HIRA MOTI GOLDEN SQUARE DEVELOPERS LLP has 1 registration on MahaRERA, including HIRA MOTI GOLDEN SQUARE PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if HIRA MOTI GOLDEN SQUARE PLAZA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIRA MOTI GOLDEN SQUARE PLAZA?

The registered promoter entity is HIRA MOTI GOLDEN SQUARE DEVELOPERS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIRA MOTI GOLDEN SQUARE PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HIRA MOTI GOLDEN SQUARE PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIRA MOTI GOLDEN SQUARE PLAZA?

The professionals named in the filing: Architect: Sachin Shirale & Associates; Engineer: Sachin Shirale & Associates; Chartered Accountant: Sanjay Vhanbatte & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIRA MOTI GOLDEN SQUARE PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIRA MOTI GOLDEN SQUARE PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIRA MOTI GOLDEN SQUARE PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.