ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / HILLS VIEW

Registration lapsed No litigation declared Residential / Group Housing project

HILLS VIEW

By SHASHI BUILDERS & DEVELOPERS

RG-MH-70967 · RERA P52100016368 · Last updated on MahaRERA portal: 27 Jun 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Completion date moved by 51 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 20%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

HILLS VIEW is a Residential / Group Housing project by SHASHI BUILDERS & DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100016368 on 8 May 2018. Possession was promised by 31 Mar 2025 and is now 19 months past that date. The completion date has moved by 51 months from the original filing.

At a glance

Project

  • NameHILLS VIEW
  • TypeResidential / Group Housing
  • Location
    • MUMBAI PUNE ROAD
    • KAMSHET
    • Khadakale (CT)
    • Mawal
    • Pune
    • 410405
  • Pincode410405
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016368
  • ReraGenie IDRG-MH-70967

Builder

  • NameSHASHI BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnerAKSHAY RAJENDRA PATHANIA

Key dates

19 months past promisethis monthRegisteredMay 2018First promiseDec 2020Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 May 2018
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 30 Dec 2020)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HILLS VIEWNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 20%.

HILLS VIEW: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed119

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots119
Closed/Covered23
Open Space96

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GANESH DEVELOPERSPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI1872.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN RAMTIRTHA
EngineerSTRUCTURE VISION
PartnerRole in project
SHASHI BUILDERS & DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012093Dec 2020 → Dec 2023

Reason as filed by the promoterDUE TO COVID PANDAMIC , LOCKDOWN EFFECT ON ECONOMY , LABOUR SHORTAGE ,CUSOMER BOOKING SHORT AND FINACIAL PROBLEAM,THIS REASON FOR PROJECT NOT COMPLETED IN TIME .WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENTION FOR 6 MONTH.

EXT52100019185Dec 2020 → Mar 2025

Reason as filed by the promoterWe are unable to compete within time limit because we have no booking & some finance issue there for we are not complete .

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FORM B.pdf27 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC 2018-19.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC 2019-20.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC 2020-21.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1-2021.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2-2021.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3-2021.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4-2022.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1-2022.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2-2022.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3-2022.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4-2023.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1-2023.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2-2023.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3-2023.pdf14 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4-2024.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2018-19.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2019-20.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2020-21.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2021-22 Q1.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2021-22 Q2.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2021-22 Q3.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2021-22 Q4.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2022-23 Q1.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2022-23 Q2.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2022-23 Q3.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2022-23 Q4.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2023-24 Q1.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2023-24 Q2.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2023-24 Q3.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 2023-24 Q4.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QULLITY ASSURANCE Form 2A 23-24.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FY 2022-23.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FY 2023-24.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA 019-20.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA 2020-21.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q1_compressed (1).pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q2_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q3_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q4_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q1 2022_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q2 2022_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q3 2022_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q4 2023_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q1 2023_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q2 2023_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q3 2023_compressed.pdf14 Jun 2024
Certificates of CA (Form 3)File: CA CERTIFICATE Q4 2024_compressed.pdf14 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: from 2A FY 2021-22.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: from 2A FY 2022-23.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: Shashi Builder sold unsold.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FROM 5 21-22.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FROM-5 22-23.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FROM 5 21-22.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QULLITY ASSURANCE Form 2A 19-20.pdf21 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QULLITY ASSURANCE Form 2A 20-21.pdf21 Jul 2022
Disclosure of sold/ booked inventoryFile: sold unsold inventory Shashi builder.pdf21 Jul 2022
Details of encumbrancesFile: ENCUMBRANCE.pdf17 Jul 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE.pdf17 Jul 2022
Declaration about Commencement CertificateFile: Shashi builders Declaration.pdf17 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: annual report Shashi builders fy 2019-20.pdf17 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: annual report Shashi builders fy 2020-21.pdf17 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate.pdf17 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf17 Jul 2022
CERSAI detailsFile: CERSAI.pdf17 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual report Shashi builders 2018-19.pdf17 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: annual report Shashi builders fy 2019-20.pdf17 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: annual report Shashi builders fy 2020-21.pdf17 Jul 2022
PAN CardFile: PAN SHASHI BUILDERS AND DEV.pdf27 Apr 2018
Certificates of CA (Form 3)File: C A CERTIFICATE phase 1.PDF27 Apr 2018
Proforma of Allotment letterFile: RERA DRAFT AGREEMENT new.pdf27 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD).PDF27 Feb 2018
Layout approvalFile: scan plan-ilovepdf-compressed.pdf27 Feb 2018
Copy of the legal title reportFile: Copy of the legal title report NEW111.pdf27 Feb 2018
Details of encumbrancesFile: F B.pdf27 Feb 2018
Copy of Layout Approval (in case of layout)File: scan plan-ilovepdf-compressed.pdf27 Feb 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD).PDF27 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates-ilovepdf-compressed.pdf27 Feb 2018
Declaration in FORM BFile: F B.pdf27 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE-ilovepdf-compressed.pdf27 Feb 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 51 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HILLS VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMSHET13,700+ in Pune

2 kmHILLS VIEWCompleted 168Lapsed / revoked 135Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 430 registered projects within 2 km.

Builder: SHASHI BUILDERS & DEVELOPERS

SHASHI BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including HILLS VIEW. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that HILLS VIEW shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HILLS VIEW is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HILLS VIEW?

The registered promoter entity is SHASHI BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HILLS VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HILLS VIEW?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HILLS VIEW?

The professionals named in the filing: Architect: KIRAN RAMTIRTHA; Engineer: STRUCTURE VISION. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HILLS VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HILLS VIEW. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HILLS VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.