Home / Browse projects / Pune, Maharashtra / HEXA TOWERS WING B AND C
HEXA TOWERS WING B AND C
RG-MH-68712 · RERA P52100053535 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HEXA TOWERS WING B AND C is a Residential / Group Housing project by DML ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100053535 on 10 Nov 2023. Possession is promised by 1 Dec 2027. 122 of the 189 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.
At a glance
Project
- NameHEXA TOWERS WING B AND C
- TypeResidential / Group Housing
- Location
- GAT NO 219
- 221 P
- DUDUALGAON
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053535
- ReraGenie IDRG-MH-68712
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Nov 2023
- Promised completion1 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed102 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING C | NA | 15 | 13 | 154 | 0 | 154 |
| WING B | NA | 8 | 5 | 35 | 0 | 35 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 45% |
| Storm Water Drains | Yes | 40% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 55% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed402
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING C | 68 | 207 | 275 |
| WING B | 28 | 99 | 127 |
Land and ownership55
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DNYANESHWAR SHAMRAO VAHILE | CHARHOLI | Pune |
| SACHIN DAGADU GAIKWAD | - | Pune |
| VIJAY DAGDU GAIKWAD | - | Pune |
| BABAN DAGADU VAHILE | - | Pune |
| KISAN NARAYAN VAHILE | - | Pune |
| DAGADU BABURAO GAIKWAD | CHARHOLI | Pune |
| NARAYAN DAGADU VAHILE | CHARHOLI | Pune |
| SHIVAJI JADHAV | Moshi | Pune |
| YUVRAJ HALADKAR | Moshi | Pune |
| TRYAMBAK BANDEWAD | Bhosari | Pune |
| MANISHA MORE | Moshi | Pune |
| VITTHAL KATAKAR | Bhosari | Pune |
| ASHA AAMRIT | Bhosari | Pune |
| PANJABRAO JOGDAND | Bhosari | Pune |
| ANJANA JADHAV | Moshi | Pune |
| VIJAY PAWAR | Pimpri Chinchawad (M Corp.) | Pune |
| BALESHWAR THOMBARE | Sangavi | Pune |
| ASHOK GHULE | Bhosari | Pune |
| SURESH CHAVAN | Moshi | Pune |
| TULSHIRAM NIKAM | - | Indore |
| SANDEEP JADHAV | Ravet | Pune |
| BIBHISHAN SITARAM PAWAR | Bhosari | Pune |
| VAIJANATH LADAG | Bhosari | Pune |
| SHARAD KARANJKAR | Bhosari | Pune |
| ASHA ARGDE | Bhosari | Pune |
| ROHIT GAIKWAD | Bhosari | Pune |
| SWATI THORAT | Sangavi | Pune |
| VIAJY THOIRAT | Bhosari | Pune |
| SONALI VIAJY THORAT | Moshi | Pune |
| VINOD MORE | Moshi | Pune |
| PANDURAN LAGAD | Bhosari | Pune |
| PANDIT SHITOLE | Bhosari | Pune |
| SANDEEP SURVE | Bhosari | Pune |
| VIJAYA PAI | VIMANNAGAR | Pune |
| BHAVARLAL AAHIR | Bhosari | Pune |
| YOGESH BORASE | Chakan (CT) | Pune |
| VAISHALI VAHILE | Moshi | Pune |
| GAJANAN MESHRAM | CHARHOLI | Pune |
| GOVIND RATHOD | Kawalguda Bk. | Nanded |
| VINOD GIRI | Aakharwai | Latur |
| BALASAHEB KAWALE | Bhosari | Pune |
| SANJAY AWASARE | Rajgurunagar (CT) | Pune |
| NAMDEV BAINALE | Varale | Pune |
| SUREKH / CHAYA KISAN VAHILE | - | Pune |
| MANGESH BHONDAVE | Bhosari | Pune |
| RUPALI HOLE | Bhosari | Pune |
| PRASAD MOHGAONKAR | Moshi | Pune |
| VIKAS GAIKWAD | Rajgurunagar (CT) | Pune |
| SATISH THORAT | Sangavi | Pune |
| SHIVAJI KHEDKAR | Waki BK | Pune |
| RAVINDRA PAWAR | Pimpri Chinchawad (M Corp.) | Pune |
| GANESH MODHAVE | AMBEGAON Bk | Pune |
| SANJAY PAWALE | CHARHOLI | Pune |
| MAHENDRA DHUMAL | Alandi Rural | Pune |
| MACHINDRA ADHALRAO | Bhosari | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING C | NA | Rs 33.41 cr | Rs 33.41 cr |
| WING B | NA | Rs 29.05 cr | Rs 27.33 cr |
| - | NA | Rs 3.76 cr | Rs 3.66 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Precision Architects and Planner |
| Engineer | GAURAV PATEL |
| Engineer | NILESH DIGHE AND ASSOCIATES |
| Chartered Accountant | BANKIM PATEL ABD ASSOCIATES |
| Chartered Accountant | NITISH VAIDYA |
| Partner | Role in project |
|---|---|
| DML ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2027
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Q3 25-26.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Q3 25-26.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Q3 25-26.pdf | 19 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf | 28 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Q2 25-26.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Q2 25-26.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Q2 25-26.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Q1 2025-26.pdf | 12 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Q1 2025-26.pdf | 12 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 2025-26.pdf | 12 Oct 2025 |
| Form 1File: FORM 1 Q4 2024-25.pdf | 19 Jul 2025 |
| Form 2File: FORM 2 - Q4 2024-25 FINAL.pdf | 19 Jul 2025 |
| Form 3File: Form 3.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD OR BOOKED INVENTORY.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 2024-25.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Q4 2024-25 fINAL.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD OR BOOKED INVENTORY.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 2024-25.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 2024-25.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 2024-25.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: sold circular Q3 2024-25.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 wing B and C.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 final scanned.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 2324.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final upload.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2425 (2).pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold circular Q3 2324.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Q4 2324.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Q1 2425.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Q2 2425.pdf | 6 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A (2023-24).pdf | 6 Dec 2024 |
| Layout approvalFile: Highlighted Layout-.pdf | 13 Nov 2024 |
| Building plan approvalFile: 05-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 06-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 07-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 07-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 08-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 09-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 10-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 11-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 12-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building plan approvalFile: 13-22 C WING-compressed.pdf | 13 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Highlighted Layout-.pdf | 13 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 05-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 09-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 08-22 C WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 07-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 07-22 B WING-compressed.pdf | 13 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06-22 B WING-compressed.pdf | 13 Nov 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank details.pdf | 19 Oct 2023 |
| Other - FinanceFile: landowners declaration for units.pdf | 19 Oct 2023 |
| Other - TechnicalFile: RERA No - REA52100147882.pdf | 13 Oct 2023 |
| Copy of the legal title reportFile: Legal title report HIGHLIGHTED_11zon.pdf | 12 Oct 2023 |
| Layout approvalFile: Layout plan 2.pdf | 11 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout plan 2.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf | 11 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: No deviation with respect to allotment letter.pdf | 11 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: No deviation model copy of agreement.pdf | 11 Oct 2023 |
| Building plan approvalFile: IMG_0003.pdf | 10 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IMG_0003.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FINAL FORM 1.pdf | 6 Oct 2023 |
| Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf | 6 Oct 2023 |
| Building plan approvalFile: IMG_0004.pdf | 3 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HEXA TOWERS WING B AND C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DUDUALGAON13,700+ in Pune
Filed coordinates, straight-line distance. 74 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: DML ASSOCIATES
DML ASSOCIATES has 3 registrations on MahaRERA, including HEXA TOWERS WING D and HEXA TOWERS WING B AND C. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if HEXA TOWERS WING B AND C is delayed beyond 1 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HEXA TOWERS WING B AND C?
The registered promoter entity is DML ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HEXA TOWERS WING B AND C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HEXA TOWERS WING B AND C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HEXA TOWERS WING B AND C?
The professionals named in the filing: Architect: Precision Architects and Planner; Engineer: GAURAV PATEL; Engineer: NILESH DIGHE AND ASSOCIATES; Chartered Accountant: BANKIM PATEL ABD ASSOCIATES; Chartered Accountant: NITISH VAIDYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HEXA TOWERS WING B AND C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.