Completed No litigation declared Residential / Group Housing project

HEXA TOWERS

By DML ASSOCITES

RG-MH-22008 · RERA P52100029931 · Last updated on MahaRERA portal: 9 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

HEXA TOWERS is a Residential / Group Housing project by DML ASSOCITES in Pune, Maharashtra, registered with MahaRERA as P52100029931 on 15 Jul 2021. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameHEXA TOWERS
  • TypeResidential / Group Housing
  • Location
    • GAT NO 219 AND 221
    • OPP MEDAS THUCH HOTEL
    • ALINDI-MOSHI ROAD
    • DUDULGAON.
    • DUDULGAON
    • MOSHI
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029931
  • ReraGenie IDRG-MH-22008

Builder

  • NameDML ASSOCITES
  • Entity typePartnership
  • PartnersVIKAS KALURAM DANGE, SUDHIR RATANSHIBHAI VELANI

Key dates

this monthRegisteredJul 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2021
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ENA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

WING E: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes55%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership53

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,054 sq m
Land owned byThe promoter, with other names on the file
Named landowners53
LandownerVillageDistrict
SHIVAJI JADHAVMoshiPune
YUVRAJ HALADKARMoshiPune
TRYAMBAK BANDEWADBhosariPune
MANISHA MOREMoshiPune
VITTHAL KATAKARBhosariPune
ASHA AAMRITBhosariPune
PANJABRAO JOGDANDBhosariPune
ANJANA JADHAVMoshiPune
VIJAYPimpri Chinchawad (M Corp.)Pune
BALESHWAR THOMBARESangaviPune
ASHOK GHULEBhosariPune
SURESHMoshiPune
TULSHIRAM-Indore
SANDEEPRavetPune
BIBHISHAN SITARAM PAWARBhosariPune
VAIJANATHBhosariPune
SHARADBhosariPune
ASHABhosariPune
ROHITBhosariPune
SWATISangaviPune
VIAJYBhosariPune
SONALI VIAJY THORAMoshiPune
VINOD MOREMoshiPune
PANDURANBhosariPune
PANDITBhosariPune
SANDEEPBhosariPune
VIJAYA PAIVIMANNAGARPune
BABAN DAGADU VAHILEMoshiPune
BHAVARLAL AAHIRBhosariPune
YOGESH BORASEChakan (CT)Pune
DYANESHWAR VAHILE-Pune
VAISHALI VAHILEMoshiPune
GAJANAN MESHRAMCHARHOLIPune
GOVIND RATHODKawalguda kh.Nanded
VINOD GIRIAakharwaiLatur
BALASAHEB KAWALEBhosariPune
SANJAY AWASARERajgurunagar (CT)Pune
NAMDEV BAINALEVaralePune
KISAN VAHILEMoshiPune
SUREKH / CHAYA KISAN VAHILE-Pune
MANGESH BHONDAVEBhosariPune
RUPALI HOLEBhosariPune
PRASAD MOHGAONKARMoshiPune
VIKAS GAIKWADRajgurunagar (CT)Pune
SATISH THORATSangaviPune
SHIVAJI KHEDKARWaki BKPune
RAVINDRA PAWARPimpri Chinchawad (M Corp.)Pune
GANESH MODHAVEAMBEGAON BkPune
VIJAY GAIKWAD-Pune
SACHIN GAIKWAD-Pune
SANJAY PAWALECHARHOLIPune
MAHENDRA DHUMALAlandi RuralPune
MACHINDRA ADHALRAOBhosariPune

Approvals and building plan

Permissible FSI55752.39
Proposed, not sanctioned9,322 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch71/1a/2, Madur Engineering Telco Road, MIDC Bhosari Pune- 411026

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNITIN R PATEL
EngineerAADHAR ENGINEERING
Chartered AccountantPATEL AND PATEL ASSOCIATES
PartnerRole in project
DML ASSOCITES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Dec 2024

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: E AND D WING OCCUPANCY CERTIFICATE.pdf9 Oct 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 E wing.pdf14 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: E AND D WING OCCUPANCY CERTIFICATE.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5 E 21-22_11zon.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: E Wing Form5 2022-23.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: E Wing Form5 2022-23.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 E 23-24_11zon.pdf14 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Eupload.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 E-bldg upload.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2425 Q2.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2425 Q1.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2324 Q4.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 E-bldg.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 E Q2.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2223 Q4.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 E-bldg.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2223 Q2.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 E.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 upload.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 E Q1 upload.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dml Associates Q2.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2425 Q1.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2324 Q4 upload.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2324 Q3 upload.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2324 Q2 upload.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2324 Q1 upload.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 E Q4.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dml Associates Q3.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 E Q4.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dml Associates Q3.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dml Associates Q2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q1.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 E Q4.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 E Q3.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 E Q2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 02 Q3.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02 Q1.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02 Q3.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 02 Q4.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02 Q2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02 Q4.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Form2 E Q2.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circulat.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circulat.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: SOld circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: SOld circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: SOld circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold circular.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Circulars E.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A E Wing 21-22_11zon.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A E Wing 22-23_11zon.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A E Wing 23-24_11zon.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: E form 1 30-06-2023.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E form 2 30-06-2023.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E form 3 30-06-2023.pdf22 Aug 2023
Proforma of Allotment letterFile: AGREEMENT TO SALE DRAFT.pdf8 Jul 2021
Layout approvalFile: 1-14.pdf7 Jul 2021
Layout approvalFile: 2-14.pdf7 Jul 2021
Building plan approvalFile: 3-14.pdf7 Jul 2021
Building plan approvalFile: 5-14.pdf7 Jul 2021
Layout approvalFile: 7-14.pdf7 Jul 2021
Building plan approvalFile: 8-14.pdf7 Jul 2021
Building plan approvalFile: 10-14.pdf7 Jul 2021
Building plan approvalFile: 12-14.pdf7 Jul 2021
Building plan approvalFile: 14-14.pdf7 Jul 2021
PAN CardFile: DML PAN.pdf7 Jul 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HEXA TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON, MOSHI13,700+ in Pune

2 kmHEXA TOWERSCompleted 40Lapsed / revoked 18Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: DML ASSOCITES

DML ASSOCITES has 1 registration on MahaRERA, including HEXA TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if HEXA TOWERS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HEXA TOWERS?

The registered promoter entity is DML ASSOCITES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HEXA TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HEXA TOWERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HEXA TOWERS?

The professionals named in the filing: Architect: NITIN R PATEL; Engineer: AADHAR ENGINEERING; Chartered Accountant: PATEL AND PATEL ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HEXA TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HEXA TOWERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HEXA TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.