Home / Browse projects / Palghar, Maharashtra / HEAVENS

Registered No litigation declared Others project

HEAVENS

By Keyators

RG-MH-87211 · RERA P99000048740 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 5.00 crore secured on the land, in favour of Bassien Catholic Bank

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 50%
84 of 107Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

HEAVENS is a Others project by Keyators in Palghar, Maharashtra, registered with MahaRERA as P99000048740 on 17 Jan 2023. Possession is promised by 31 Dec 2028. 23 of the 107 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameHEAVENS
  • TypeOthers
  • Location
    • Parnaka
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401201
  • Pincode401201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000048740
  • ReraGenie IDRG-MH-87211

Builder

  • NameKeyators
  • Entity typePartnership
  • GSTIN27AAXFK9436H1ZJ
  • PartnersVivek Patrick Pimenta, Percival Paul Furtado, Sandra Percival Furtado, Sanpras Percival Furtado

Key dates

this monthRegisteredJan 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Current status

21%23 of 107 units booked
48.2%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HEAVENS - Residential /Commercial BuildingNA17116146107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 50%.

HEAVENS - Residential /Commercial Building: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,445 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBassien Catholic Bank
Secured amountRs 5.00 crore
CERSAI search filedYes
Declared on9 Jun 2026

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI7173.37
Proposed, not sanctioned6,173 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhabola Vasai West
Estimated costRs 27.67 cr
Cost incurredRs 13.34 cr
Work done48.19%
BuildingWingEstimatedIncurred
HEAVENS - Residential /Commercial BuildingNARs 26.67 crRs 13.34 cr
-NARs 1.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON
EngineerPragnesh Oza Oza
EngineerMussadique Hussain Anwarh Shaikh
Chartered AccountantJ N Kamerkar & Co
Chartered AccountantJ.F. DIAS & CO
PartnerRole in project
Keyators-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Keyator.pdf9 Jun 2026
Form 2File: Form 2 Keyator.pdf9 Jun 2026
Form 3File: Form 3 Keyator.pdf9 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventory.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Keyator.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Keyator.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Keyator.pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 Keyator.pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 Keyator.pdf9 Jun 2026
Withdrawal Update Form 2File: Form 2 Keyator.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Keyator.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Keyator.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Keyator.pdf9 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A Keyator.pdf9 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 Keyator.pdf9 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 .pdf3 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf3 Jun 2025
Disclosure for secured/unsecured finance availed for the projectFile: Keyator Letter.pdf3 Jun 2025
Layout approvalFile: Layout.pdf5 May 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 5.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf15 Mar 2025
Layout approvalFile: Layout.pdf27 Dec 2024
Building plan approvalFile: Sheet 2.pdf27 Dec 2024
Building plan approvalFile: Sheet 3.pdf27 Dec 2024
Building plan approvalFile: Sheet 4.pdf27 Dec 2024
Details of encumbrances concerned to FinanceFile: Keyator Letter.pdf27 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4.pdf27 Dec 2024
Details of encumbrances concerned to LegalFile: Keyator Letter.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold .pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold .pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A .pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf17 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Keyator Letter-Disclosure on other interest.pdf12 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Keyator.pdf10 Jan 2023
Copy of the legal title reportFile: Title Report as per RERA.pdf8 Jan 2023
Proforma of Allotment letterFile: Allotment Letter as per RERA.pdf8 Jan 2023
Proforma of Agreement for saleFile: Final RERA AFS 07012023 Keyators Malonde land.pdf8 Jan 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf8 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration Bank Account.pdf22 Dec 2022
Copy of the legal title reportFile: Title Keyator.pdf15 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200253708862_For_Asset_Based_Search_01_12_2022_17_21_53_648.pdf4 Dec 2022
Details of encumbrances concerned to FinanceFile: write up on other finance.pdf30 Nov 2022
Details of encumbrances concerned to LegalFile: write up on other finance.pdf30 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Nov 2022
Layout approvalFile: Layout.pdf22 Nov 2022
Building plan approvalFile: Plan 14 floor.pdf22 Nov 2022
Building plan approvalFile: Plan Gr 1 and 2.pdf22 Nov 2022
Building plan approvalFile: Typical Plan.pdf22 Nov 2022
PAN CardFile: Keyator Pan Card.pdf22 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf22 Nov 2022

How this compares with Palghar

21%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HEAVENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parnaka3,200+ in Palghar

Builder: Keyators

Keyators has 1 registration on MahaRERA, including HEAVENS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if HEAVENS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HEAVENS?

The registered promoter entity is Keyators, a partnership as per the filing. Its GSTIN 27AAXFK9436H1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HEAVENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HEAVENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HEAVENS?

The professionals named in the filing: Architect: EN CON; Engineer: Pragnesh Oza Oza; Engineer: Mussadique Hussain Anwarh Shaikh; Chartered Accountant: J N Kamerkar & Co; Chartered Accountant: J.F. DIAS & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HEAVENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HEAVENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HEAVENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.