Haware Meadows Phase 1
By HAAAS Corporation Private Limited
RG-MH-65423 · RERA P52000015126 · Last updated on MahaRERA portal: 18 Jul 2024
Source: official MahaRERA filing
Red flags
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Haware Meadows Phase 1 is a Others project by HAAAS Corporation Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000015126 on 31 Jan 2018. The registration is recorded completed; possession was promised by 30 Dec 2022.
At a glance
Project
- NameHaware Meadows Phase 1
- TypeOthers
- Location
- 6 meters existing village road
- Mamdapur
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000015126
- ReraGenie IDRG-MH-65423
Builder
- NameHAAAS Corporation Private Limited
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Jan 2018
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings3 building records
- Documents filed67 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 8 | 0 | 0 | 0 | 0 |
| B Wing | NA | 8 | 0 | 0 | 0 | 0 |
| C Wing | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
A Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dharmesh V Bhalani |
| Partner | Role in project |
|---|---|
| HAAAS Corporation Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterBecause of the global outbreak of Coronavirus (COVID-19) pandemic we were unable to carry out the construction work as the required manpower were not allowed to work and we were not able to procure materials required for construction due to lockdown. Once, the manpower became available with us, we have resumed the construction work and also received OC for 'A' wing on 31st October 2022. We hereby request to your good office for extension of proposed date of completion of project from 30th December 2022 to 30th December 2023.
Reason as filed by the promoterThe project was impacted by the COVID-19 outbreak in 2020 and 2021, and the subsequent slow market conditions and labour shortages made it difficult for us to complete the project on time. Therefore, we are requesting an extension till 30-09-2024 as we have already received Occupancy Certificate of A wing of Phase 1.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jan 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jan 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Jul 2024
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Wing B and C.pdf | 18 Jul 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Tower A.pdf | 18 Jul 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Wing B and C.pdf | 18 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Meadows CA Certificate 31-03-2024 With DSC.pdf | 11 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HCPL - Meadows RERA FORM- 1 Dec 23.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HCPL- Meadows RERA FROM-2 EC DSC (Dec 23) .pdf | 4 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: HCPL - Meadows FORM 2A FY2022-23.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: Final Form 3 CA Certificate 31-12-2023 With DSC .pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 Architects Certificate June 2023.pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 Architects Certificate Dec 2023.pdf | 24 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 Engineer's Certificate June 2023.pdf | 24 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 Engineer's Certificate Sept 2023.pdf | 24 Jan 2024 |
| Certificates of CA (Form 3)File: Final Form 3 CA Certificate 30-06-2023.pdf | 24 Jan 2024 |
| Certificates of CA (Form 3)File: Final Form 3 CA Certificate 30-09-2023.pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2022.pdf | 13 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2023.pdf | 13 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Haware Meadows Form 2 Dir Sign 04-01-23.pdf | 13 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Haware Meadows Form 2 31-03-23.pdf | 13 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 31122023.pdf | 13 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 31-03-2023.pdf | 13 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23 HCPL With Dir Sign.pdf | 13 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021-22 HCPL.pdf | 17 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 july (for RERA) PHASE - 1.pdf | 13 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA FROM- 1 A october.pdf | 13 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HAWARE MEADOWS EC 11-07-22.pdf | 13 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: HAWARE MEADOWS EC 07-10-22.pdf | 13 Dec 2022 |
| Certificates of CA (Form 3)File: FORM 3 MAR 22 Meadows.pdf | 13 Dec 2022 |
| Certificates of CA (Form 3)File: FORM 3 june 22 Meadows.pdf | 13 Dec 2022 |
| Certificates of CA (Form 3)File: FORM 3 Sep 22 Meadows2.pdf | 13 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Received for Tower A.pdf | 13 Dec 2022 |
| Copy of the legal title reportFile: Haware Meadows Title Search Report new updated_.pdf | 23 Nov 2022 |
| Details of encumbrancesFile: Encumbrance Certificate HCPL.pdf | 23 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate HCPL.pdf | 23 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate HCPL.pdf | 23 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Meadows-31-03-2022.pdf | 23 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Haware Meadows Engineers Certificate 31-03-22.pdf | 23 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 31-03-2022 Meadows.pdf | 23 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_16_03_2022_13_45_47_908[72075].pdf | 23 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold and Booked Inventory.pdf | 23 Nov 2022 |
| Proforma of Agreement for saleFile: Proforma of the agreement for sale.pdf | 23 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report on Model From of Allotment Letter.pdf | 23 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for sale.pdf | 23 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Sold and unsold inventory Details.pdf | 16 Nov 2022 |
| Declaration about Commencement CertificateFile: FORM- D.pdf | 15 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM-A.pdf | 15 Nov 2022 |
| Certificates of CA (Form 5)File: Form_5_Rera_Certificate.pdf | 5 Jan 2019 |
| Proforma of Allotment letterFile: Revised Final Agreement .pdf | 9 Feb 2018 |
| Layout approvalFile: LAYOUT_APPROVAL Total.pdf | 24 Jan 2018 |
| Layout approvalFile: WING_A_AND_B_APPROVED_PLAN.pdf | 24 Jan 2018 |
| Layout approvalFile: WING_C_APPROVED_PLAN.pdf | 24 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT_APPROVAL Total.pdf | 24 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: WING_A_AND_B_APPROVED_PLAN.pdf | 24 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: WING_C_APPROVED_PLAN.pdf | 24 Jan 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COPY OF CC Final.pdf | 24 Jan 2018 |
| Certificates of CA (Form 3)File: Form_3-1-3.pdf | 19 Jan 2018 |
| Layout approvalFile: layout.pdf | 15 Jan 2018 |
| Building plan approvalFile: COPY OF CC Final.pdf | 15 Jan 2018 |
| PAN CardFile: HAAAS_CORPORATION_PVT_LTD_-_PANCARD.pdf | 15 Jan 2018 |
| Copy of the legal title reportFile: Title_certificates.pdf | 15 Jan 2018 |
| Details of encumbrancesFile: Encumbrance_details.pdf | 15 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 15 Jan 2018 |
| Building Plan Approval (IOD)File: COPY OF CC Final.pdf | 15 Jan 2018 |
| Declaration in FORM BFile: DECLARATION.pdf | 15 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect cetificate.pdf | 15 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 15 Jan 2018 |
| Proforma of Allotment letterFile: Copy_of_aggrements_of_sale.pdf | 15 Jan 2018 |
| Proforma of Allotment letterFile: Allotment.pdf | 15 Jan 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 67 filed documents as one ZIP, foldered, with a manifest
Keep Haware Meadows Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mamdapur5,900+ in Raigarh
Filed coordinates, straight-line distance. 184 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: HAAAS Corporation Private Limited
HAAAS Corporation Private Limited has 1 registration on MahaRERA, including Haware Meadows Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Haware Meadows Phase 1 is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Haware Meadows Phase 1?
The registered promoter entity is HAAAS Corporation Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Haware Meadows Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Haware Meadows Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Haware Meadows Phase 1?
The professionals named in the filing: Architect: Dharmesh V Bhalani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Haware Meadows Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.