Registration lapsed No litigation declared Residential / Group Housing project

Haritara Residency / Haritara Co-operative Housing Society Limited-

By Haritara Construction Company

RG-MH-27295 · RERA P51800008079 · Last updated on MahaRERA portal: 28 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 70%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Haritara Residency / Haritara Co-operative Housing Society Limited- is a Residential / Group Housing project by Haritara Construction Company in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008079 on 18 Aug 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NameHaritara Residency / Haritara Co-operative Housing Society Limited-
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008079
  • ReraGenie IDRG-MH-27295

Builder

  • NameHaritara Construction Company
  • Entity typePartnership
  • PartnersRohidas Hareshwar Mhatre, Aniket Rohidas Mhatre
  • Other registrations3 more →
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

58 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Haritara ResidencyNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 70%.

Haritara Residency: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 28 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes20%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered1
Open Space42

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,123 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5287.46
Proposed, not sanctioned4,932 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 and 2 Hareshwar Paradise Off New Link Road Kandarpada Dahisar West Mumbai 400068

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMiss Vinita N Chogle
PartnerRole in project
Haritara Construction Company-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005749Dec 2018 → Apr 2020

Reason as filed by the promoterDear Sir/ Madam, We hereby applying for further extension date/ period for completion project. We hereby inform you that we were not get extension because project is almost completed and remaining work is going in full force so the allottees have not objection for the same. In meanwhile we has in process to get signature on consent letter from the Allottees. Now we are upload the consents of the Allottees for getting further time to complete project. We hereby given assurance that we will complete the project within extension period. We are request you to please issue us certificate of further

EXT51800008562Dec 2018 → Jun 2021

Reason as filed by the promoterWe had applied for extension till 31/12/2020 on our application dated 14/02/2020 but we have received extension only till 30/04/2020. Now the same has extended till 30/10/2020 due to COVID situation. If, we would have received extension till 31/12/2020 as per our last application for extension then same would be extended till 30th June 2021 due to COVID. We have completed majority work and we will complete the project till 30/06/2021 so hereby request you to please issue us extension certificate till 30/06/2021. We once again uploaded hereby consent list for extension and latest Architect cert

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2022

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Legal Encumbrance.pdf28 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf13 May 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf13 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 5 FY 21 - 22.pdf13 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21 - 22.pdf13 May 2023
Proforma of Agreement for saleFile: Final Flat Sale RERA (HR).pdf13 May 2023
Deviation Report with respect to Allotment letterFile: Deveiation Allotment Letter.pdf13 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS haritara res.pdf13 May 2023
Certificates of CA (Form 3)File: Form 3 - HR 01.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20 - 21.pdf14 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration - Bank Account.pdf10 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Work Completion letter.pdf22 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf30 Jun 2021
Details of Restarting of Construction work post lockdownFile: Details of resume construction work.pdf28 Nov 2020
Status of ConveyanceFile: Index II Conveyance Deed.pdf28 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY 17-18.pdf3 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19.pdf3 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf31 Oct 2017
Layout approvalFile: IOD LETTER WITH PLAN11.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN1.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN3.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN2.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN4.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN5.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN10.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN11.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN9.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN6.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN8.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN14.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN15.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN13.pdf29 Jul 2017
Building plan approvalFile: IOD LETTER WITH PLAN12.pdf29 Jul 2017
PAN CardFile: PAN Haritara Construction Company.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf29 Jul 2017
Details of encumbrancesFile: No Encumbrances.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD LETTER WITH PLAN11.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN1.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN2.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN3.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN4.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN5.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN6.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN8.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN9.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN10.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN11.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN12.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN13.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN14.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD LETTER WITH PLAN15.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC upto 20th floor.pdf29 Jul 2017
Declaration in FORM BFile: Form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: Allotment letter Agr for Sale.pdf29 Jul 2017
OtherFile: Rectification of Unintentional Errors.pdf29 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Dahisar Bhushan CHSLParab Kalsekar Road Mhatrewadi Dahisar West Mumbai-40006823CompletedDec 2015Late, Sep 2016
Kanyakumari CHSLM. G. Road Kandivali West MUMBAI-400 06733CompletedMar 2012Late, Jan 2013
Mhatre Residency CHSL Wing-A, Dahisar Manish CHSL Wing-BGajanan Raote Road Dahisar West Mumbai 40006844CompletedDec 2010Late, May 2011
Mhatre Residency CHSL - Wing CGajanan Raote Road Dahisar West Mumbai 4000687CompletedDec 2010Late, Apr 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Haritara Residency / Haritara Co-operative H on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmHaritara Residency / HarCompleted 58Lapsed / revoked 39Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 191 registered projects within 2 km.

Builder: Haritara Construction Company

Haritara Construction Company has 4 registrations on MahaRERA, including Haritara Residency / Haritara Co-operative Housing Society Limited- and Sadakamal Co-operative Housing Society Limited. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Haritara Residency / Haritara Co-operative Housing Society Limited- shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Haritara Residency / Haritara Co-operative Housing Society Limited- is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Haritara Residency / Haritara Co-operative Housing Society Limited-?

The registered promoter entity is Haritara Construction Company, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Haritara Residency / Haritara Co-operative Housing Society Limited-?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Haritara Residency / Haritara Co-operative Housing Society Limited-?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Haritara Residency / Haritara Co-operative Housing Society Limited-?

The professionals named in the filing: Architect: Miss Vinita N Chogle. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Haritara Residency / Haritara Co-operative Housing Society Limited-?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Haritara Residency / Haritara Co-operative Housing Society Limited-. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Haritara Residency / Haritara Co-operative H to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.