ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Harikrupa

Registration lapsed No litigation declared Residential / Group Housing project

Harikrupa

By VG Realtors LLP

RG-MH-17061 · RERA P52100027898 · Last updated on MahaRERA portal: 12 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 98%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Harikrupa is a Residential / Group Housing project by VG Realtors LLP in Pune, Maharashtra, registered with MahaRERA as P52100027898 on 14 Jan 2021. Possession was promised by 30 Jun 2024 and is now 28 months past that date.

At a glance

Project

  • NameHarikrupa
  • TypeResidential / Group Housing
  • Location
    • Lane No.10
    • Dahanukar Colony
    • Kothrud
    • Haveli
    • Pune
    • 411029
  • Pincode411029
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027898
  • ReraGenie IDRG-MH-17061

Builder

  • NameVG Realtors LLP
  • Entity typePartnership
  • GSTIN27AASFV9417G1ZI
  • PartnersVishal Vasant Gokhale, Poonam Vishal Gokhale
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

28 months past promisethis monthRegisteredJan 2021PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Jan 2021
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HarikrupaNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.

Harikrupa: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 12 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area647 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Harikrupa Cooperative Housing Society LimitedPune (M Corp.)Pune

Approvals and building plan

Permissible FSI2330.55
Proposed, not sanctioned712 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKothrud Pune 411038

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
VG Realtors LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jul 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 1_compressed.pdf12 Mar 2025
Building plan approvalFile: 2.pdf12 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf12 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf12 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf12 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Harikrupa.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 18072024.pdf11 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: 9 Harikrupa Full 180724.pdf3 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Harikrupa.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Harikrupa.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_30 06 2024.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 30 06 24 - Signed.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HARIKRUPA Q1 2425.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HARIKRUPA Q1 2425.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HARIKRUPA Q4 FY 2324.pdf3 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Harikrupa - Full - 18-07-24.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Harikrupa_30 06 2024.PDF19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA 31 03 2021.PDF25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA 31 12 2021.PDF25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA 31 03 2022.PDF25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA 30 06 2022.PDF25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA 30 09 2022.PDF25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA 31 12 2022.PDF25 Jun 2024
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 31 3 2023.PDF25 Jun 2024
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 30 06 2023.PDF25 Jun 2024
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 30 09 2023.PDF25 Jun 2024
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 31 12 2023.PDF25 Jun 2024
Disclosure of sold/ booked inventoryFile: Harikrupa Sold Unsold 31 3 2024.PDF25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Harikrupa 31 03 2024 - Signed.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC_Harikrupa_Form 1_31032024.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_31 12 2021.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_31 03 2022.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_30 06 2022.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HARIKRUPA Q1 2324.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HARIKRUPA Q2 FY2324.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 HARIKRUPA Q3 FY 2324.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_31 03 2021.PDF1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_30 06 2023.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_30 09 2023.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Harikrupa_31 12 2023.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harikrupa - Form 1 - 30 09 2022.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harikrupa - Form 1 - 31 12 2022.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harikrupa - Form 1 - 31 03 2023.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harikrupa 30 06 2023.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harikrupa 30 09 2023.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harikrupa 31 12 2023.pdf20 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 23Harikrupa.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Harikrupa 31-03-2023.PDF12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Harikrupa 31-03-2023.pdf27 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Harikrupa.pdf21 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HARIKRUPA.pdf2 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Harikrupa signed.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Harikrupa.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Harikrupa.pdf30 Sep 2021
Layout approvalFile: Sanctioned plan_Harikrupa.pdf4 Jan 2021
Building plan approvalFile: Sanctioned plan_Harikrupa.pdf4 Jan 2021
Copy of Layout Approval (in case of layout)File: Sanctioned plan_Harikrupa.pdf4 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned plan_Harikrupa.pdf4 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Jan 2021
Details of encumbrancesFile: Encumbrance cert.pdf23 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Harikrupa Form 3.pdf23 Dec 2020
Proforma of Allotment letterFile: Harikrupa-Allotment.pdf18 Dec 2020
Proforma of Allotment letterFile: Agr Draft.pdf18 Dec 2020
PAN CardFile: VG REALTORS LLP_PAN Card.pdf17 Dec 2020
Copy of the legal title reportFile: titel report 2020-compressed.pdf17 Dec 2020
Declaration in FORM BFile: Affidavit Cum Declaration (1).pdf17 Dec 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate.pdf17 Dec 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Harikrupa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahanukar Colony13,700+ in Pune

2 kmHarikrupaCompleted 95Lapsed / revoked 47Other 162Dot size: filed unitsN

Filed coordinates, straight-line distance. 304 registered projects within 2 km.

Builder: VG Realtors LLP

VG Realtors LLP has 2 registrations on MahaRERA, including Harikrupa and VISHNU. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Harikrupa shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Harikrupa is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Harikrupa?

The registered promoter entity is VG Realtors LLP, a partnership as per the filing. Its GSTIN 27AASFV9417G1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Harikrupa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Harikrupa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Harikrupa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Harikrupa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Harikrupa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.