Home / Browse projects / Nagpur, Maharashtra / GYAN JYOTI COMPLEX
GYAN JYOTI COMPLEX
RG-MH-12613 · RERA P50500046046 · Last updated on MahaRERA portal: 9 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 10 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GYAN JYOTI COMPLEX is a Others project by GANESH BUILDERS in Nagpur, Maharashtra, registered with MahaRERA as P50500046046 on 15 Jun 2022. Possession is promised by 20 Oct 2026. The completion date has moved by 10 months from the original filing. 27 of the 30 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameGYAN JYOTI COMPLEX
- TypeOthers
- Location
- Shilpa Co operative Housing Society
- Somalwada Nagpur
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440015
- Pincode440015
- RERA no.P50500046046
- ReraGenie IDRG-MH-12613
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion20 Oct 2026
- Revised completionRevised to 20 Oct 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed122 files
Current status
Figures as on 9 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GYAN JYOTI COMPLEX | NA | 15 | 6 | 24 | 6 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
GYAN JYOTI COMPLEX: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed78
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 6.10 cr | Rs 5.80 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JITENDRA INGULKAR |
| Engineer | JITENDRA INGULKAR |
| Engineer | SUDESH MALODE |
| Chartered Accountant | Madhao Vichore and Co |
| Chartered Accountant | Anjali Divecha |
| Chartered Accountant | SNDIVECHAASSOCIATES |
| Chartered Accountant | ASDIVECHAASSOCIATES |
| Partner | Role in project |
|---|---|
| GANESH BUILDERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo The Maharashtra Real Estate Regulatory Authority (MahaRERA) Subject: Explanation for Delay and Request for Extension under Section 6 - Force Majeure (Act of God) Respected Sir/Madam, We would like to submit this explanation regarding the delay in completion of our project registered under MahaRERA, which is due to expire on 31st December 2025. The delay has occurred solely due to unforeseen natural calamities that were entirely beyond our control, and we therefore request an extension under Section 6 of the Real Estate (Regulation and Development) Act, 2016, which permits extension in cases
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 20 Oct 2026
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCH CERTIFICATE mar 26.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: ENG CERTIFICATE mar 26.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: form-3 march 26.pdf | 9 Jun 2026 |
| Form 2A (FY 2025-2026)File: form 2A.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 25 GYAAN JYOTI.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: C A Certificate_compressed.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: C A Certificate_compressed.pdf | 25 Nov 2025 |
| Form 2A (FY 2024-2025)File: 2A QUALITY 31 mar 25.pdf | 8 Oct 2025 |
| Form 2A (FY 2022-2023)File: form 2A JULY 23.pdf | 8 Oct 2025 |
| Form 2A (FY 2023-2024)File: form 2A JULY 23.pdf | 8 Oct 2025 |
| Form 1File: ARCHITECTS CERTIFICATE JUN-25.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CERTIFICATE JUN-25.pdf | 6 Oct 2025 |
| Form 3File: CA CERTIFICATE JUNE 25.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: booked sold inventory june 25.pdf | 6 Oct 2025 |
| Form 1File: archi certificate.pdf | 6 Oct 2025 |
| Form 2File: enngi certificate.pdf | 6 Oct 2025 |
| Form 3File: CA CERTIFICATE GYAN JYOTI COMPLEX.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 23.pdf | 6 Oct 2025 |
| Form 1File: archi certificate.pdf | 6 Oct 2025 |
| Form 2File: enngi certificate.pdf | 6 Oct 2025 |
| Form 3File: CA CERTIFICATE GYAN JYOTI COMPLEX.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 23.pdf | 6 Oct 2025 |
| Form 1File: archi certificate.pdf | 6 Oct 2025 |
| Form 2File: enngi certificate.pdf | 6 Oct 2025 |
| Form 3File: CA CERTIFICATE GYAN JYOTI COMPLEX.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 23.pdf | 6 Oct 2025 |
| Form 1File: archi certificate.pdf | 6 Oct 2025 |
| Form 2File: enngi certificate.pdf | 6 Oct 2025 |
| Form 3File: CA CERTIFICATE GYAN JYOTI COMPLEX.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 23.pdf | 6 Oct 2025 |
| Form 1File: ARC CERTIFICATE JUN23.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CER JUN 23.pdf | 6 Oct 2025 |
| Form 3File: ca certificate JUN 23.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold jun 23.pdf | 6 Oct 2025 |
| Form 1File: ARCHITECTS CER SEP 23.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CER SEP 23.pdf | 6 Oct 2025 |
| Form 3File: ca certificate SEP 23.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold sep 23.pdf | 6 Oct 2025 |
| Form 1File: ARCHITECTS CER DEC 23.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CER DEC 23.pdf | 6 Oct 2025 |
| Form 3File: ca certificate DEC 23.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold dec 23.pdf | 6 Oct 2025 |
| Form 1File: ARCHITECTS CERT MAR 24.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CER MAR 24.pdf | 6 Oct 2025 |
| Form 3File: ca certificate MAR 24.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold mar 24.pdf | 6 Oct 2025 |
| Form 1File: ARCHITECTS CERT JUN 24.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CER JUN 24.pdf | 6 Oct 2025 |
| Form 3File: ca certificate JUN 24.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: booked sold jun 24.pdf | 6 Oct 2025 |
| Form 1File: ARCHITECTS CER SEP 24.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CERT SEP 24.pdf | 6 Oct 2025 |
| Form 3File: ca certificate SEP 24.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: booked sold sep 24.pdf | 6 Oct 2025 |
| Form 1File: ARCHITECTS CERT DEC 24.pdf | 6 Oct 2025 |
| Form 2File: ENGINEERS CERT DEC 24.pdf | 6 Oct 2025 |
| Form 3File: ca certificate DEC 24.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold dec 24.pdf | 6 Oct 2025 |
| Form 5 (FY 2022-2023)File: annual report 22-23.pdf | 6 Oct 2025 |
| Form 5 (FY 2023-2024)File: annual report 23-24.pdf | 6 Oct 2025 |
| Form 5 (FY 2024-2025)File: form5 24-25.pdf | 23 Sep 2025 |
| Form 1File: ARCHITECTS CERTIFICATE MARCH-25.pdf | 6 Sep 2025 |
| Form 2File: ENGINEERS CERTIFICATE MARCH-25.pdf | 6 Sep 2025 |
| Form 3File: CA CERTIFICATE MARCH-25.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOK.pdf | 6 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate JUN 23.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate SEP 23.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate DEC 23.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate MAR 24.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate JUN 24.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate SEP 24.pdf | 13 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate DEC 24.pdf | 13 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: annual report 22-23.pdf | 13 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: annual report 23-24.pdf | 13 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GYAN JYOTI COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Somalwada Nagpur2,800+ in Nagpur
STRAWBERRY FARM
MEGHA AMOL WALKE
OFFICERS ENCLAVE
R SANDESH INFRASTRUCTURES PRIVATE LIMITED
WHITE TIGER AND WILD FLOWER
MILINDKUMAR BHAURAO MESHRAM
PALAZZO ROYAL
INTERCONTINENTAL OASIS INFRA LLP
gokul
surendra mangaldas chadda
Sai Villa 5
Earth Infra Venture
See every Nagpur project, with the district possession charts
Builder: GANESH BUILDERS
GANESH BUILDERS has 3 registrations on MahaRERA, including MAYURESH PLAZA and GYAN JYOTI COMPLEX. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if GYAN JYOTI COMPLEX is delayed beyond 20 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GYAN JYOTI COMPLEX?
The registered promoter entity is GANESH BUILDERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GYAN JYOTI COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GYAN JYOTI COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GYAN JYOTI COMPLEX?
The professionals named in the filing: Architect: JITENDRA INGULKAR; Engineer: JITENDRA INGULKAR; Engineer: SUDESH MALODE; Chartered Accountant: Madhao Vichore and Co; Chartered Accountant: Anjali Divecha; Chartered Accountant: SNDIVECHAASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GYAN JYOTI COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback