Home / Browse projects / Nanded, Maharashtra / GVC SAPTAGIRI SIGNATURE

Registered No litigation declared Residential / Group Housing project

GVC SAPTAGIRI SIGNATURE

By GVC DEVELOPERS

RG-MH-29969 · RERA P51100051931 · Last updated on MahaRERA portal: 23 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nanded registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 70%
1 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

GVC SAPTAGIRI SIGNATURE is a Residential / Group Housing project by GVC DEVELOPERS in Nanded, Maharashtra, registered with MahaRERA as P51100051931 on 13 Jul 2023. Possession is promised by 31 Dec 2026. 11 of the 12 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameGVC SAPTAGIRI SIGNATURE
  • TypeResidential / Group Housing
  • Location
    • KAUTHA GUT NO 66
    • KAUTHA
    • Nanded Waghala (M Corp.)
    • Nanded
    • 431603
  • Pincode431603
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51100051931
  • ReraGenie IDRG-MH-29969

Builder

  • NameGVC DEVELOPERS
  • Entity typePartnership
  • PartnersGANGAPRASAD RAMESHWAR TOSHNIWAL, DURGAPRASAD RAMESHWAR TOSHNIWAL, SANGEETA GANGAPRASAD TOSHNIWAL, UMA DURGAPRASAD TOSHNIWAL
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

92%11 of 12 units booked

Figures as on 23 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GVC SAPTAGIRI SIGNATURENA6612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 70%.

GVC SAPTAGIRI SIGNATURE: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area719 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2025

Approvals and building plan

Sanctioning authorityNWCMC Nanded
Permissible FSI2299.08
Proposed, not sanctioned2,299 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANMAN PRESTIGE, STATION ROAD, NANDED

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILESH P DANDANE
EngineerSANDESH PATIL
Chartered AccountantCA MAYUR AGRAWAL
Chartered AccountantCA MAYUR AGARWAL
PartnerRole in project
GVC DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: FORM 5 SGSS 2025.pdf23 Oct 2025
Form 1File: FORM 1 SGSS 2025 09 SEPT.pdf20 Oct 2025
Form 2File: FORM 2 SGSS 2025 09 SEPT.pdf20 Oct 2025
Form 3File: FORM 3 SGSS 2025 09 SEPT.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2025 09 SEPT.pdf20 Oct 2025
Form 1File: FORM 1 SGSS 2025 06 JUNE.pdf20 Jul 2025
Form 2File: FORM 2 SGSS 2025 06 JUNE.pdf20 Jul 2025
Form 3File: FORM 3 SGSS 2025 06 JUNE.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2025 06 JUNE.pdf20 Jul 2025
Form 1File: FORM 1 SGSS 20231010.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 20231012.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 20230930.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE 2023 SEPT.pdf10 Jun 2025
Form 1File: FORM 1 SGSS 2023 12 DEC.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 2023 12 DEC.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 2023 12 DEC.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2023 12 DEC.pdf10 Jun 2025
Form 1File: FORM 1 SGSS 2024 03 MARCH.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 2024 03 MARCH.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 2024 03 MARCH.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2024 03 MARCH.pdf10 Jun 2025
Form 1File: FORM 1 SGSS 2024 06 JUNE.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 2024 06 JUNE.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 2024 06 JUNE.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2024 06 JUNE.pdf10 Jun 2025
Form 1File: FORM 1 SGSS 2024 09 SEPT.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 2024 09 SEPT.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 2024 09 SEPT.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2024 09 SEPT.pdf10 Jun 2025
Form 1File: FORM 1 SGSS 2024 12 DEC.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 2024 12 DEC.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 2024 12 DEC.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2024 12 DEC.pdf10 Jun 2025
Form 1File: FORM 1 SGSS 2025 03 MARCH.pdf10 Jun 2025
Form 2File: FORM 2 SGSS 2025 03 MARCH.pdf10 Jun 2025
Form 3File: FORM 3 SGSS 2025 03 MARCH.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SGSS 2025 03 MARCH.pdf10 Jun 2025
Form 5 (FY 2023-2024)File: FORM 5 SGSS 2024.pdf10 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SGSS 20240930.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SGSS 20241231.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SGSS 20240930.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SGSS 20240930.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SGSS 20241231.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SGSS 20241231.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SGSS 20240930.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SGSS 20240630.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SGSS 20240630.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SGSS 20240630.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SGSS 20240331.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SGSS 20240331.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SGSS 20240331.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SGSS 20231010.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SGSS 20240110.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SGSS 20231012.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SGSS 20240113.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SGSS 20240115.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SG SS 20230930.pdf20 Oct 2023
Declaration about Commencement CertificateFile: FORMAT D QUERY 2.pdf26 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER RERA QUERY.pdf26 Jun 2023
Other - TechnicalFile: UNDERTAKING PROJECT NAME.pdf26 Jun 2023
Proforma of Agreement for saleFile: Saptgiri Signature RERA Agreement.pdf2 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Saptgiri Signature RERA Agreement Deviation.pdf2 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Saptgiri Signature RERA Agreement Deviation 2.pdf2 Jun 2023
Building plan approvalFile: DWG 1 compressed.pdf31 May 2023
Building plan approvalFile: DWG 2 compressed.pdf31 May 2023
Building plan approvalFile: DWG 3 compressed.pdf31 May 2023
Layout approvalFile: GVC SAPTAGIRI SIGNATURE LAYOUT.pdf31 May 2023
PAN CardFile: 1 PAN Card.pdf31 May 2023
Copy of the legal title reportFile: SEARCH REPORT OF SS c.pdf31 May 2023
Details of encumbrances concerned to FinanceFile: ENUMBRANCES.pdf31 May 2023
Details of encumbrances concerned to LegalFile: ENUMBRANCES.pdf31 May 2023
Copy of Layout Approval (in case of layout)File: GVC SAPTAGIRI SIGNATURE LAYOUT.pdf31 May 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG 1 compressed.pdf31 May 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG 2 compressed.pdf31 May 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG 3 compressed.pdf31 May 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION COVER LETTER.pdf31 May 2023
Declaration in FORM BFile: FORM B.pdf31 May 2023
CERSAI detailsFile: CERSAI.pdf31 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SG SS FORM 3 REGISTRATION compressed.pdf31 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER c.pdf31 May 2023

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GVC GANGADHAM SKYILAP51100055475ASARJAN, Nanded71Apr 2024OngoingDec 2028Not due yet
GVC SAPTAGIRI GREENS IIP51100029308KAUTHA, Nanded-May 2021CompletedDec 2024Apr 2024
GVC SHAGUN PARKP51100026549NEAR MSRTC BUS STAND, Nanded-Oct 2020CompletedJun 2024Jun 2023
GVC GANGADHAM PHASE IP51100018353ASARJAN, Nanded75Oct 2018CompletedMar 2022Jan 2021
RAMBAGH RESIDENCYOFF ROAD NO 10 NEAR NAGARJUNA PUBLIC SCHOOL KAUTHA NANDED32-CompletedDec 2017Aug 2017
USHA RESIDENCYSACHKHAND ROAD CHIKALWADI NANDED28-CompletedSep 2014Jul 2014

How this compares with Nanded

92%of this project is bookeddistrict median 6%
3%of Nanded projects moved their completion datethis one has not
25%of Nanded registrations have lapsed or been cancelledthis one is on the register

Computed across the 100+ Nanded projects on ReraGenie, from their own filings.

Keep GVC SAPTAGIRI SIGNATURE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAUTHA100+ in Nanded

2 kmGVC SAPTAGIRI SIGNATURECompleted 10Lapsed / revoked 3Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: GVC DEVELOPERS

GVC DEVELOPERS has 5 registrations on MahaRERA, including GVC GANGADHAM PHASE I and GVC SHAGUN PARK. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Nanded district page.

Frequently asked questions

What are my rights if GVC SAPTAGIRI SIGNATURE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GVC SAPTAGIRI SIGNATURE?

The registered promoter entity is GVC DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GVC SAPTAGIRI SIGNATURE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GVC SAPTAGIRI SIGNATURE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GVC SAPTAGIRI SIGNATURE?

The professionals named in the filing: Architect: SHAILESH P DANDANE; Engineer: SANDESH PATIL; Chartered Accountant: CA MAYUR AGRAWAL; Chartered Accountant: CA MAYUR AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GVC SAPTAGIRI SIGNATURE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GVC SAPTAGIRI SIGNATURE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GVC SAPTAGIRI SIGNATURE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.