GURUKRUPA ANANTAM
By GURUKRUPA REALCON LIFESPACES LLP
RG-MH-36117 · RERA P51900033128 · Last updated on MahaRERA portal: 18 Nov 2026
Why this is marked a redevelopment: this filing shows MHADA as the sanctioning authority in Mumbai. MahaRERA has no redevelopment field, so this is ReraGenie's reading of the filing. Redevelopment across Mumbai City.
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 26 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GURUKRUPA ANANTAM is a Others project by GURUKRUPA REALCON LIFESPACES LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900033128 on 9 Feb 2022. Possession is promised by 28 Feb 2027. The completion date has moved by 26 months from the original filing. 112 of the 168 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameGURUKRUPA ANANTAM
- TypeOthers
- Location
- BLDG 56 CTS 356 PT SURVEY NO 113 PT
- HARIYALI VILLAGE KANNAMWAR NAGAR
- Mumbai City
- 400083
- Pincode400083
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900033128
- ReraGenie IDRG-MH-36117
Builder
- NameGURUKRUPA REALCON LIFESPACES LLP
- Entity typePartnership
- GSTIN27AAWFG2200J1ZB
- PartnersMAHESH LIRA VERAT, URMILA MAHESH VERAT
- Other registrations5 more →
- Completed5 of 6
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Feb 2022
- Promised completion28 Feb 2027
- Revised completionRevised to 28 Feb 2027 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed68 files
Current status
Figures as on 18 Nov 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GURUKRUPA ANANTAM | NA | 22 | 22 | 154 | 14 | 168 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
GURUKRUPA ANANTAM: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| KANNAMWAR NAGAR SAISADAN CHS LTD | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GURUKRUPA ANANTAM | NA | Rs 40.00 cr | Rs 32.33 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | INGENIOUS ARCHITECT |
| Engineer | FOUNTAIN HEAD ENGINEERS |
| Engineer | RINKESH VASOYA |
| Chartered Accountant | MGDG AND ASSOCIATES |
| Chartered Accountant | G M SANDHA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GURUKRUPA REALCON LIFESPACES LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. We have received the Occupancy Certificate (OC) for the project on 09/10/2024. 2. We are now in the final stage of completing the remaining compliance formalities required under MahaRERA after receiving the OC. 3. To ensure that all post-OC compliance obligations are fulfilled properly and without any errors, we request an extension until 28/02/2027. This will help us complete the process smoothly and in full compliance with the regulations.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 28 Feb 2027
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Nov 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Nov 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Nov 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Nov 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Nov 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Nov 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Nov 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Nov 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Nov 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Nov 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Nov 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Nov 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Nov 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Nov 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Nov 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Nov 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Nov 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Nov 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf | 18 Nov 2026 |
| Form 5 (FY 2025-2026)File: Form 5.pdf | 18 Nov 2026 |
| Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf | 28 Oct 2026 |
| Form 1File: FORM 1.pdf | 27 Oct 2026 |
| Form 2File: FORM 2.pdf | 27 Oct 2026 |
| Form 3File: FORM 3.pdf | 27 Oct 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 27 Oct 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2025-26.pdf | 27 Oct 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Bldg No 56.pdf | 7 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: ANANTAM Form 4.pdf | 1 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Anantam 04042023.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A Anantam 04042024.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Anantam 04042023.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A Anantam 04042024.pdf | 16 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 56 Anantam 12 Oct 2024.pdf | 27 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: No legal encrumbtances Anantam 01102024.pdf | 23 Oct 2024 |
| Details of encumbrancesFile: No legal encrumbtances Anantam 01102024.pdf | 23 Oct 2024 |
| Status of ConveyanceFile: Sale Deed 56.pdf | 23 Oct 2024 |
| Status of ConveyanceFile: Sale Deed 56.pdf | 23 Oct 2024 |
| Details of encumbrances concerned to LegalFile: No legal encrumbtances Anantam 01102024.pdf | 23 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert RERA ANANTAM AUG 24.pdf | 17 Aug 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate.pdf | 17 Aug 2024 |
| Layout approvalFile: AMENDED LETTER.pdf | 13 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: AMENDED LETTER.pdf | 13 Aug 2024 |
| Declaration about Commencement CertificateFile: ANANTAM.pdf | 3 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC up to 21 th Floor.pdf | 2 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: bldg-56.pdf | 6 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BLDG NO 56.pdf | 7 Feb 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale- final draft- with parking- UPLODED ON RERA.pdf | 7 Feb 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale- final draft- without parking- UPLODED ON RERA .pdf | 7 Feb 2023 |
| Proforma of Allotment letterFile: ANANTAM- ALLOTMENT LETTER- WITH CAR APRKING- UPLODED ON RERA.pdf | 7 Feb 2023 |
| Proforma of Allotment letterFile: ANANTAM-ALLOTMENT LETTER- WITHOUT CAR PRKING -UPLODED ON RERA .pdf | 7 Feb 2023 |
| Proforma of Agreement for saleFile: AFS- ANANTAM- WITHOUT PARKING.pdf | 3 Feb 2023 |
| Proforma of Agreement for saleFile: AFS-ANANTAM-WITH PARKING.pdf | 3 Feb 2023 |
| Proforma of Agreement for saleFile: AFS- with parking-ANANTAM.pdf | 3 Feb 2023 |
| Copy of the legal title reportFile: Title and search report.pdf | 8 Feb 2022 |
| Layout approvalFile: layout plan.pdf | 24 Jan 2022 |
| Building plan approvalFile: building approval plan.pdf | 24 Jan 2022 |
| PAN CardFile: PAN.pdf | 24 Jan 2022 |
| Copy of the legal title reportFile: Title and search report.pdf | 24 Jan 2022 |
| Details of encumbrancesFile: Encumbrance Certificate-56.pdf | 24 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 24 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: building approval plan.pdf | 24 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-56.pdf | 24 Jan 2022 |
| Declaration about Commencement CertificateFile: Declaration About CC-56.pdf | 24 Jan 2022 |
| Declaration in FORM BFile: FORM B-promoter-56.pdf | 24 Jan 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200228685312_For_Debtor_Based_Search_24_01_2022_19_18_16_485.pdf | 24 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-.pdf | 24 Jan 2022 |
| Proforma of Allotment letterFile: Agreement and allotment.pdf | 24 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 790+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GURUKRUPA ANANTAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HARIYALI VILLAGE KANNAMWAR NAGAR790+ in Mumbai City
Filed coordinates, straight-line distance. 109 registered projects within 2 km.
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai City project, with the district possession charts
Builder: GURUKRUPA REALCON LIFESPACES LLP
GURUKRUPA REALCON LIFESPACES LLP has 6 registrations on MahaRERA, including GURUKRUPA ANANTAM and GURUKRUPA SATYAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if GURUKRUPA ANANTAM is delayed beyond 28 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GURUKRUPA ANANTAM?
The registered promoter entity is GURUKRUPA REALCON LIFESPACES LLP, a partnership as per the filing. Its GSTIN 27AAWFG2200J1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GURUKRUPA ANANTAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GURUKRUPA ANANTAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GURUKRUPA ANANTAM?
The professionals named in the filing: Architect: INGENIOUS ARCHITECT; Engineer: FOUNTAIN HEAD ENGINEERS; Engineer: RINKESH VASOYA; Chartered Accountant: MGDG AND ASSOCIATES; Chartered Accountant: G M SANDHA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GURUKRUPA ANANTAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback