Home / Browse projects / Mumbai Suburban, Maharashtra / GURU DWARKA

Registered No litigation declared Residential / Group Housing project

GURU DWARKA

By BSRD INFRABUILD PRIVATE LIMITED

RG-MH-93805 · RERA P51800014414 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 60 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 60 months from the original
12 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
46 of 205Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

GURU DWARKA is a Residential / Group Housing project by BSRD INFRABUILD PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014414 on 29 Nov 2017. Possession is promised by 29 Jun 2027. The completion date has moved by 60 months from the original filing. 159 of the 205 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGURU DWARKA
  • TypeResidential / Group Housing
  • Location
    • SHIVAJI CHOWK
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014414
  • ReraGenie IDRG-MH-93805

Builder

  • NameBSRD INFRABUILD PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSUNIL KUMAR DEVNARAYAN YADAV

Key dates

this monthRegisteredNov 2017First promiseJun 2022Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2017
  • Promised completion29 Jun 2027
  • Revised completionRevised to 29 Jun 2027 (originally 30 Jun 2022)
  • Buildings3 building records
  • Documents filed65 files

Current status

78%159 of 205 units booked
74.4%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA242483083
WING BNA242479079
WING CNA242443043

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

WING A58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
WING B58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
WING C58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed190

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots190
Closed/Covered190
BuildingClosed/CoveredTotal
WING A112112
WING B4545
WING C3333

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,708 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Aug 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI10403.0
Proposed, not sanctioned4,813 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI EAST
Estimated costRs 141.00 cr
Cost incurredRs 104.85 cr
Work done74.36%
BuildingWingEstimatedIncurred
WING ANARs 47.00 crRs 34.95 cr
WING BNARs 47.00 crRs 34.95 cr
WING CNARs 47.00 crRs 34.95 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJITENDRA PATEL
ArchitectLIESHA
EngineerJACOB DSOUZA
Chartered AccountantNIKHIL CHANDRA VYAS
Chartered AccountantSHRENIK CHETAN SHAH
PartnerRole in project
BSRD INFRABUILD PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024212Jun 2022 → Jun 2025

Reason as filed by the promoterDue to shortage of material and labor we are not able to complete project please grant us extension till 29/06/2025

EXT51800006156Jun 2022 → Dec 2023

Reason as filed by the promoterDUE TO COVID AND SHORTAGE OF RAW MATERIALS WE WOULD LIKE TO EXTEND THE PROJECT FOR ONE YEAR. KINDLY REQUEST YOU TO PLEASE ACCEPT THE SAME.

EA27062501824Jun 2022 → Jun 2027

Reason as filed by the promoter1. Rajesh P. Yadav, am the Director of the Bard infrabuild private itd having project GURU DWARKA, situated at 2650, 2651 2652 at Borivali, Mumbai Suburban, 400068 The project is registered under RERA with Registration No. P51800014414 We have approved IOA plans up to the 23rd Floor (No SRA/ENG/2505/RN/STGL/AP dated 31st December 2021) and CC plans up to the 19th Floor (SRA/ENG/2505/RN/PL/AP dated 6th June 2022) Due to unknown circumstances, the project is required to ger approval from Airport Authority due to receiving centre within 500 mtrs limit falling, in view of above there has been cons

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502287Aditya Harshad GugaliyaBSRD INFRABUILD PRIVATE LIMITED07/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Jun 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 2026 04 10 P Maha RERA CERTIFICATE 0001.pdf11 Jun 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 GURUDWARKA MARCH 26.pdf11 Jun 2026
Withdrawal Update Form 3File: FROM 3 Q 3.pdf11 Jun 2026
Withdrawal Update Form 1File: 25 09 01 P Maha RERA CERTIFICATE.pdf10 Jun 2026
Withdrawal Update Form 1File: 2026 01 10 P Maha RERA CERTIFICATE 0001.pdf10 Jun 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 GURUDWARKA SEPT 25.pdf10 Jun 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 - GURUDWARKA DEC 25.pdf10 Jun 2026
Withdrawal Update Form 3File: FORM-3 Q-1_11zon.pdf10 Jun 2026
Withdrawal Update Form 3File: FROM 3 Q 3.pdf10 Jun 2026
Withdrawal Update Form 1File: architect.pdf5 Jun 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 - GURUDWARKA june 25.pdf5 Jun 2026
Withdrawal Update Form 3File: FORM-3 Q-1_11zon.pdf5 Jun 2026
Form 1File: form 1.pdf14 Aug 2025
Form 2File: form 2.pdf14 Aug 2025
Form 3File: form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory disclosure.pdf14 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf29 Jun 2024
Certificates of CA (Form 3)File: FORM-3 BSRD (1).pdf29 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf29 Jun 2024
Certificates of CA (Form 3)File: FORM-3 RERA (1).pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf2 Nov 2023
Certificates of CA (Form 3)File: from 3.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Feb 2023
Certificates of CA (Form 3)File: FORM 3.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf30 Jul 2022
Certificates of CA (Form 3)File: CA FORM 3.pdf30 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_CERTIFICATE - GURUDWARKA.pdf26 Jan 2022
Certificates of CA (Form 3)File: Form-3.pdf26 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_CERTIFICATE RERA-5th Slab_compressed.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3_FORM_2A_Site_Supervisor.pdf13 Oct 2021
Certificates of CA (Form 3)File: FORM 3 CA.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf29 Sep 2021
Certificates of CA (Form 3)File: CA Certificate BSRD SIGN REVISED.pdf26 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Guru Dwarka Ar Certificate (1) (1).pdf14 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2_FORM_2A_Site_Supervisor (1) (1) (1).pdf14 Jun 2021
Certificates of CA (Form 3)File: CA Certificate BSRD-11062021 (1).pdf11 Jun 2021
Certificates of CA (Form 3)File: Adobe Scan 10-Nov-2020_compressed.pdf10 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 01_FORM_2A_Site_supervisor.pdf20 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate guru dwarka.pdf17 Aug 2020
Details of Restarting of Construction work post lockdownFile: COVID GURU DWARKA.pdf15 Jul 2020
Certificates of CA (Form 5)File: Habitat - Rera.pdf9 Jun 2020
Certificates of CA (Form 3)File: RAJ DWARKA CA CERTIFICATE 05022019.pdf7 May 2019
Certificates of CA (Form 3)File: RAJ DWARKA CA CERTIFICATE 20112018.pdf27 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Sale 15_11_18.pdf4 Dec 2018
Certificates of CA (Form 3)File: RAJ DWARKA CA CERTIFICATE 20082018.pdf23 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dwarka Sale 20_08_18.pdf22 Nov 2018
Certificates of CA (Form 5)File: RajDwarka F5.pdf8 Oct 2018
Certificates of CA (Form 3)File: RAJ DWARKA CA CERTIFICATE.pdf16 Aug 2018
Certificates of CA (Form 3)File: CA CERTIFICATE RAJ DWARKA 28022018.pdf4 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Raj Dwarka Sale.pdf3 Mar 2018
Proforma of Allotment letterFile: AFS pdf 28112017.pdf28 Nov 2017
Copy of the legal title reportFile: Title Cert pdf.pdf24 Nov 2017
Details of encumbrancesFile: Encum Cert pdf.pdf24 Nov 2017
Certificates of CA (Form 3)File: RAJ DWARKA 20112017.pdf24 Nov 2017
Proforma of Allotment letterFile: allotment letter pdf.pdf22 Nov 2017
OtherFile: 20171118184425.pdf21 Nov 2017
Building plan approvalFile: IOA.pdf16 Nov 2017
Layout approvalFile: LAYOUT PDF.pdf16 Nov 2017
PAN CardFile: Rajesh Habitat Pvt Ltd.pdf16 Nov 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PDF.pdf16 Nov 2017
Building Plan Approval (IOD)File: IOA.pdf16 Nov 2017
Declaration in FORM BFile: Form B 16-11-2017.pdf16 Nov 2017

How this compares with Mumbai Suburban

78%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GURU DWARKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

2 kmGURU DWARKACompleted 76Lapsed / revoked 45Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 224 registered projects within 2 km.

Builder: BSRD INFRABUILD PRIVATE LIMITED

BSRD INFRABUILD PRIVATE LIMITED has 1 registration on MahaRERA, including GURU DWARKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GURU DWARKA is delayed beyond 29 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURU DWARKA?

The registered promoter entity is BSRD INFRABUILD PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURU DWARKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GURU DWARKA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GURU DWARKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURU DWARKA?

The professionals named in the filing: Architect: JITENDRA PATEL; Architect: LIESHA; Engineer: JACOB DSOUZA; Chartered Accountant: NIKHIL CHANDRA VYAS; Chartered Accountant: SHRENIK CHETAN SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURU DWARKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURU DWARKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURU DWARKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.