Home / Browse projects / Palghar, Maharashtra / Gurmukh Apartments by Amrit Developers

Registered No litigation declared Residential / Group Housing project

Gurmukh Apartments by Amrit Developers

By DIVEKAR AND VANMALI CONSTRUCTIONS

RG-MH-37503 · RERA P99000080985 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
51 of 57Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Gurmukh Apartments by Amrit Developers is a Residential / Group Housing project by DIVEKAR AND VANMALI CONSTRUCTIONS in Palghar, Maharashtra, registered with MahaRERA as P99000080985 on 24 Sep 2025. Possession is promised by 31 Dec 2028. 6 of the 57 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameGurmukh Apartments by Amrit Developers
  • TypeResidential / Group Housing
  • Location
    • Dhovali
    • Vasai West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401201
  • Pincode401201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000080985
  • ReraGenie IDRG-MH-37503

Builder

  • NameDIVEKAR AND VANMALI CONSTRUCTIONS
  • Entity typePartnership

Key dates

this monthRegisteredSep 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Current status

11%6 of 57 units booked
18.8%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gurmukh Apartments by Amrit Developers - Commercial Cum Residential BuildingNA1414461157

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Gurmukh Apartments by Amrit Developers - Commercial Cum Residential Building: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered1
Open Space77

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,253 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Oct 2025
LandownerVillageDistrict
Kanwaljeet Singh SoodVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation (VVCMC)
Permissible FSI7348.7
Proposed, not sanctioned5,349 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHOLI BAZAR, PAN-KELA MARKET, TAL & P.O. VASAI, DIST : THANE, 401 201
Estimated costRs 20.82 cr
Cost incurredRs 3.92 cr
Work done18.82%
BuildingWingEstimatedIncurred
Gurmukh Apartments by Amrit Developers - Commercial Cum Residential BuildingNARs 19.60 crRs 3.92 cr
-NARs 1.23 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVaibhav Vaman Mhatre
EngineerJyotiba Patil
Chartered AccountantSarika R Shetty
Chartered AccountantR S P H & Associates
PartnerRole in project
DIVEKAR AND VANMALI CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR - Dec 25.pdf19 Jun 2026
Withdrawal Update Form 1File: AR - March 26.pdf19 Jun 2026
Withdrawal Update Form 2File: ER - Dec 25.pdf19 Jun 2026
Withdrawal Update Form 2File: ER - March 26.pdf19 Jun 2026
Withdrawal Update Form 3File: CA - Dec 25 .pdf19 Jun 2026
Withdrawal Update Form 3File: CA - March 26.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 Gurmukh Aptmnts.pdf4 Mar 2026
Withdrawal Update Form 2File: From 2 Gurmukh Aptmnt 3rd QRTR.pdf4 Mar 2026
Withdrawal Update Form 3File: FORM 3 GURMUKH.pdf4 Mar 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GURMUKH.pdf18 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GURMUKH.pdf18 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GURMUKH.pdf18 Aug 2025
Other - TechnicalFile: form 3 Gurmukh 24072025_compressed.pdf24 Jul 2025
Other - TechnicalFile: form 3 Gurmukh 24072025_compressed.pdf24 Jul 2025
Other - TechnicalFile: form 3 Gurmukh 24072025_compressed.pdf24 Jul 2025
Building plan approvalFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf8 Jul 2025
Building plan approvalFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf8 Jul 2025
Building plan approvalFile: BUILDING PLAN 4 PLOT B.pdf8 Jul 2025
Building plan approvalFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf8 Jul 2025
Building plan approvalFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf8 Jul 2025
Building plan approvalFile: BUILDING PLAN 4 PLOT B.pdf8 Jul 2025
Building plan approvalFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf8 Jul 2025
Building plan approvalFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf8 Jul 2025
Building plan approvalFile: BUILDING PLAN 4 PLOT B.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 4 PLOT B.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 4 PLOT B.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf8 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 4 PLOT B.pdf8 Jul 2025
Other - TechnicalFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf30 Jun 2025
Other - TechnicalFile: Screen shor email verification Gurmukh.pdf30 Jun 2025
Other - TechnicalFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf30 Jun 2025
Other - TechnicalFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf30 Jun 2025
Other - TechnicalFile: Screen shor email verification Gurmukh.pdf30 Jun 2025
Other - TechnicalFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf30 Jun 2025
Other - TechnicalFile: Bldg plan 2 Gurmukh Aptmnt Final MARKED.pdf30 Jun 2025
Other - TechnicalFile: Screen shor email verification Gurmukh.pdf30 Jun 2025
Other - TechnicalFile: BLDG PLAN 3 Gurmukh Aptmnt Final marked.pdf30 Jun 2025
Copy of the legal title reportFile: Title reports Gurmukh Aptmnt 21062025.pdf21 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GURMUKH APTMNT.pdf21 Jun 2025
Other - LegalFile: Development agreement 3 of 3 Gurmukh.pdf21 Jun 2025
Other - LegalFile: Development agreement 1 of 3 Gurmukh.pdf21 Jun 2025
Other - LegalFile: DEVELOPMENT AGREEENT GURMUKH 2 OF 3.pdf21 Jun 2025
Copy of the legal title reportFile: Title reports Gurmukh Aptmnt 21062025.pdf21 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GURMUKH APTMNT.pdf21 Jun 2025
Other - LegalFile: Development agreement 3 of 3 Gurmukh.pdf21 Jun 2025
Other - LegalFile: Development agreement 1 of 3 Gurmukh.pdf21 Jun 2025
Other - LegalFile: DEVELOPMENT AGREEENT GURMUKH 2 OF 3.pdf21 Jun 2025
Copy of the legal title reportFile: Title reports Gurmukh Aptmnt 21062025.pdf21 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GURMUKH APTMNT.pdf21 Jun 2025
Other - LegalFile: Development agreement 3 of 3 Gurmukh.pdf21 Jun 2025
Other - LegalFile: Development agreement 1 of 3 Gurmukh.pdf21 Jun 2025
Other - LegalFile: DEVELOPMENT AGREEENT GURMUKH 2 OF 3.pdf21 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: CC RENEWAL ORDER GURMUKH.pdf9 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: CC RENEWAL ORDER GURMUKH.pdf9 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: CC RENEWAL ORDER GURMUKH.pdf9 Jun 2025
Declaration in FORM BFile: FORB DIVEKAR N VANMALI.pdf4 Jun 2025
Declaration in FORM BFile: FORB DIVEKAR N VANMALI.pdf4 Jun 2025
Declaration in FORM BFile: FORB DIVEKAR N VANMALI.pdf4 Jun 2025
Other - TechnicalFile: ONE PLOT UNDERTAKING GURMUKH APTMNT.pdf25 Apr 2025
Other - TechnicalFile: ONE PLOT UNDERTAKING GURMUKH APTMNT.pdf25 Apr 2025
Other - TechnicalFile: ONE PLOT UNDERTAKING GURMUKH APTMNT.pdf25 Apr 2025
Proforma of Allotment letterFile: Allotement model Gurmukh Aptmnt (1).pdf24 Apr 2025
Proforma of Agreement for saleFile: AfS Gurmukh Apartments (1).pdf24 Apr 2025
Proforma of Allotment letterFile: Allotement model Gurmukh Aptmnt (1).pdf24 Apr 2025
Proforma of Agreement for saleFile: AfS Gurmukh Apartments (1).pdf24 Apr 2025
Proforma of Allotment letterFile: Allotement model Gurmukh Aptmnt (1).pdf24 Apr 2025
Proforma of Agreement for saleFile: AfS Gurmukh Apartments (1).pdf24 Apr 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance to Finance Gurmukh Aptmnt.pdf21 Apr 2025
Details of encumbrances concerned to FinanceFile: Non encumbrance to legal Gurmukh Aptmnt.pdf21 Apr 2025
Declaration about Commencement CertificateFile: CC Declartion Gurmukh Aptmnt.pdf21 Apr 2025
CERSAI detailsFile: CERSAI REPORTS Gurmukh Aptmnt.pdf21 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: BANK DTLS BY PROMOTER GURMUKH APTMNT.pdf21 Apr 2025
Deviation Report with respect to Allotment letterFile: Devitation to Allotmnt Gurmukh Aptmnt.pdf21 Apr 2025
Details of encumbrances concerned to LegalFile: Non encumbrance to Finance Gurmukh Aptmnt.pdf21 Apr 2025
Details of encumbrances concerned to LegalFile: Non encumbrance to legal Gurmukh Aptmnt.pdf21 Apr 2025

How this compares with Palghar

11%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gurmukh Apartments by Amrit Developers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai West3,200+ in Palghar

2 kmGurmukh Apartments by AmCompleted 25Lapsed / revoked 8Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: DIVEKAR AND VANMALI CONSTRUCTIONS

DIVEKAR AND VANMALI CONSTRUCTIONS has 1 registration on MahaRERA, including Gurmukh Apartments by Amrit Developers. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Gurmukh Apartments by Amrit Developers is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gurmukh Apartments by Amrit Developers?

The registered promoter entity is DIVEKAR AND VANMALI CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gurmukh Apartments by Amrit Developers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gurmukh Apartments by Amrit Developers?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gurmukh Apartments by Amrit Developers?

The professionals named in the filing: Architect: Vaibhav Vaman Mhatre; Engineer: Jyotiba Patil; Chartered Accountant: Sarika R Shetty; Chartered Accountant: R S P H & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gurmukh Apartments by Amrit Developers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gurmukh Apartments by Amrit Developers. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gurmukh Apartments by Amrit Developers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.