Home / Browse projects / Mumbai Suburban, Maharashtra / GULRAJ TRINITY
GULRAJ TRINITY
By M/S RELIABLE BUILDERS AND DEVELOPERS
RG-MH-25258 · RERA P51800005013 · Last updated on MahaRERA portal: 31 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 31 complaints at MahaRERA
- Completion date moved by 54 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GULRAJ TRINITY is a Others project by M/S RELIABLE BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005013 on 9 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 54 months from the original filing. 10 of the 47 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 31 complaints are on record with the regulator.
At a glance
Project
- NameGULRAJ TRINITY
- TypeOthers
- Location
- GOREGAON
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- RERA no.P51800005013
- ReraGenie IDRG-MH-25258
Builder
- NameM/S RELIABLE BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersDIWAKAR VITTAL SHETTY, DEVDAS NARAYAN SHETTY
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed111 files
Current status
Figures as on 31 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GULRAJ TRINITY - SALE BUILDING | NA | 24 | 24 | 2 | 22 | 24 |
| LAXMI NAGAR SRA CO OP HSG SOCIETY LTD | NA | 23 | 23 | 0 | 23 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 31 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.
GULRAJ TRINITY - SALE BUILDING38%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 0% |
| Podiums (if any) | 75% |
| Plinth | 75% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LAXMI NAGAR SRA CO OP HSG SOCIETY LTD81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 31 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed311
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ORCHID BUILDCON PVT LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GULRAJ TRINITY - SALE BUILDING | NA | Rs 88.41 cr | Rs 19.38 cr |
| LAXMI NAGAR SRA CO OP HSG SOCIETY LTD | NA | Rs 64.42 cr | Rs 56.60 cr |
| - | NA | Rs 1.50 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASAD KHAN |
| Architect | ATHARVA CONSULTANT |
| Engineer | HANWARE CONSULTANTS |
| Engineer | Struct Bombay Consultants |
| Chartered Accountant | A.K MANTRI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| M/S RELIABLE BUILDERS AND DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO VERY SLUGGISH REAL ESTATE MARKET AND VERY POOR SALE OF FLATS AND EXTREMELY POOR FUND FLOW OF PROJECT, WE WOULD NOT BE ABLE TO COMPLETE THE PROJECT IN TIME. THEREFORE WE WOULD LIKE TO REQUEST YOU TO PLEASE GRANT US EXTENSION FOR FURTHER 12 MONTHS.
Reason as filed by the promoterDUE TO VERY SLUGGISH REAL ESTATE MARKET AND VERY POOR SALE OF FLATS AND EXTREMELY POOR FUND FLOW OF PROJECT, WE WOULD NOT BE ABLE TO COMPLETE THE PROJECT IN TIME. THEREFORE WE WOULD LIKE TO REQUEST YOU TO PLEASE GRANT US EXTENSION FOR FURTHER 12 MONTHS.
Reason as filed by the promoterDUE TO COVID 19 NOT ABLE TO COMPLETE OUR PROJECT PLEASE GRANT US EXTENSION TILL 31/12/2025
Complaints filed with MahaRERA31
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000292630 | PRADIP SHRIPAT PATANKAR | RELIABLE BUILDERS & DEVELOPERS | 10/09/2022 |
| CC006000000012385 | Yugesh@Vivekanand P Vyas | M/s Reliable Builders and Developers | 11/12/2017 |
| CC006000000209459 | RADHAKRISHNAN MENON | Reliable Builders and Developers | 20/12/2021 |
| CC006000000199067 | Ajay Jaiswal | Ms Reliable Builders & Developers | 17/11/2021 |
| CC006000000196370 | Bhavin Pravinbhai Vora | Reliable Builders & Developers | 01/04/2021 |
| CC006000000198021 | SHREE MANOHAR GAWAS | M/S RELAIBLE BUILDERS & DEVELOPERS | 18/08/2021 |
| CC006000000344232 | Vipin Choudhary | Ms Reliable Builders & Developers | 05/02/2023 |
| CC006000000395561 | ASWAD PURNENDU GHANEKAR | RELIABLE BUILDER & DEVELOPER | 10/05/2023 |
| CC006000000395563 | RAJESH PATHAK | RELIABLE BUILDER & DEVELOPER | 10/05/2023 |
| CC006000000395698 | TANMAY AGARWAL | RELIABLE BUILDER & DEVELOPER | 13/05/2023 |
| CC006000000395787 | VINOD BOMB | RELIABLE BUILDER & DEVELOPER | 13/05/2023 |
| CC006000000396050 | Mr Surendra Prasad Mr Santosh Kumar Ms Archana Pandit | Reliable Builders and Developers | 02/06/2023 |
| CC006000000396138 | Noor Jahan Asif Ahmed Shaikh | Reliable Builders and Developers | 17/06/2023 |
| CC006000000396282 | Sweta Suresh Singhal | Reliable Builders and Developers | 16/06/2023 |
| CC006000000396757 | Malavika Apurva Gupta | RELIABLE BUILDERS AND DEVELOPERS | 24/07/2023 |
| CC006000000396934 | MALA M JAIN | RELIABLE BUILDERS AND DEVELOPERS | 15/09/2023 |
| CC006000000397654 | Satish Chhabildas Karolia and Shaila Satish Karolia | Reliable Builders & Developers | 29/09/2023 |
| CC006000000397760 | ANANT KAMALAKANT PHATARPEKAR | RELIABLE BUILDER & DEVELOPER | 11/10/2023 |
| CC006000000397797 | ANANT KAMALAKANT PHATARPEKAR | RELIABLE BUILDER & DEVELOPER | 11/10/2023 |
| CC006000000429562 | Dr. Ravindra Bhardwaj | M/s Reliable builders and developers | 14/03/2024 |
| CC006000000429567 | Sajid Ali Shaikh | Reliable Builders and Developers | 08/03/2024 |
| CC006000000429569 | Mr Navdeep Singh Sahni and Mrs Savy Myne | Reliable Builders and Developers | 08/03/2024 |
| CC12400698 | Zubair Ahmed Syed | M/S RELIABLE BUILDERS AND DEVELOPERS | 07/11/2024 |
| CC12501743 | Neelam Chaudhory | M/S RELIABLE BUILDERS AND DEVELOPERS | 28/05/2025 |
| CC12502197 | Mansi Jain | M/S RELIABLE BUILDERS AND DEVELOPERS | 02/07/2025 |
| CC12503221 | Ankit Mahesh Jain | M/S RELIABLE BUILDERS AND DEVELOPERS | 12/09/2025 |
| CC12602102 | SHYAM AWASTHI | M/S RELIABLE BUILDERS AND DEVELOPERS | 10/04/2026 |
| CC12602159 | sheetal suresh kale | M/S RELIABLE BUILDERS AND DEVELOPERS | 12/04/2026 |
| CC12602703 | Mahendra Kumar Akshaivar Bharati | Diwalar Vittal Shetty | 09/05/2026 |
| CC12602740 | Mahendra Kumar Akshaivar Bharati | M/S RELIABLE BUILDERS AND DEVELOPERS | 11/05/2026 |
| CC12603012 | SREEGIRIRAJU ADITYA | M/S RELIABLE BUILDERS AND DEVELOPERS | 21/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 3File: RBD CA Certificate of RERA (31-03-2025).pdf | 31 Dec 2025 |
| Form 2File: RBD Engineers Certificate Form 2(Sep 2025).pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: RBD Disclosure of Sold or Booked Inventory Gulraj Trinity.pdf | 31 Dec 2025 |
| Form 1File: architect form 1 march 25.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate April 2025 To June 2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate April 2025 To June 2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate July 2025 To September 2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: RBD Engineers Certificate Form 2 (June 2025).pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: RBD Engineers Certificate Form 2 (June 2025).pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: RBD Engineers Certificate Form 2(Sep 2025).pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 RBD.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 RBD.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 RBD.pdf | 30 Dec 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 12 23.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 24.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 06 24.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 09 24.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 12 24.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: form 3 12 23.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: form 3 03 24.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: form 3 06 24.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: form 3 09 24.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: form 3 12 24.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 12 23.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 03 24.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 06 24.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 09 24.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 12 24.pdf | 20 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory (Goregaon) Revised.pdf | 4 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory Gurlaj Trinity.pdf | 3 Jan 2024 |
| Declaration in FORM BFile: Form B.pdf | 29 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 29 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 29 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 RBD.pdf | 29 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 29 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 12 22.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 03 23.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 06 23.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 09 23.pdf | 23 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 12 22.pdf | 21 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 23.pdf | 21 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 06 23.pdf | 21 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 09 23.pdf | 21 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 09 23.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 12 22.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 12 22.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 03 23.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 06 23.pdf | 21 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 09 23.pdf | 21 Oct 2023 |
| Declaration about Commencement CertificateFile: cc covering letter.pdf | 31 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: inventory dsclosure.pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: frm 5 21-22.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf | 29 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2.pdf | 29 Dec 2022 |
| Certificates of CA (Form 3)File: CA form 3.pdf | 29 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RBD Quality Assurance Certificate.pdf | 16 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Reliable Builders Developers.pdf | 4 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RBD Architect Certificate.pdf | 3 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RBD-Engineers Certificate - Sandip.pdf | 3 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: fORM 5 RBD_compressed.pdf | 15 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH GOREGAON.pdf | 24 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG GOREGAON.pdf | 24 Jul 2019 |
| Certificates of CA (Form 3)File: CA GOREGAON.pdf | 24 Jul 2019 |
| Layout approvalFile: LP PLAN.pdf | 29 Jun 2019 |
| Layout approvalFile: FLOOR PLAN.pdf | 29 Jun 2019 |
| Building plan approvalFile: IOD.pdf | 29 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: LP PLAN.pdf | 29 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: FLOOR PLAN.pdf | 29 Jun 2019 |
| Building Plan Approval (IOD)File: IOD.pdf | 29 Jun 2019 |
| Certificates of CA (Form 3)File: GOREGAON CA Compressed.pdf | 22 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT GOREGAON.pdf | 10 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING GOREGAON.pdf | 10 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 01.pdf | 21 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: gulraj trinity.pdf | 13 Dec 2018 |
| Certificates of CA (Form 3)File: goregaon ca compressed.pdf | 5 Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GULRAJ TRINITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOREGAON6,700+ in Mumbai Suburban
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: M/S RELIABLE BUILDERS AND DEVELOPERS
M/S RELIABLE BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including GULRAJ TRINITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that GULRAJ TRINITY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GULRAJ TRINITY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GULRAJ TRINITY?
The registered promoter entity is M/S RELIABLE BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GULRAJ TRINITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GULRAJ TRINITY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GULRAJ TRINITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GULRAJ TRINITY?
The professionals named in the filing: Architect: ASAD KHAN; Architect: ATHARVA CONSULTANT; Engineer: HANWARE CONSULTANTS; Engineer: Struct Bombay Consultants; Chartered Accountant: A.K MANTRI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GULRAJ TRINITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback