Home / Browse projects / Pune, Maharashtra / GULMOHAR SOCIETY

Registered No litigation declared Others project

GULMOHAR SOCIETY

By NITIN SITARAM KULKARNI

RG-MH-04834 · RERA P52100020640 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
13 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
18 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

GULMOHAR SOCIETY is a Others project by NITIN SITARAM KULKARNI in Pune, Maharashtra, registered with MahaRERA as P52100020640 on 30 Apr 2019. Possession is promised by 30 Dec 2027. The completion date has moved by 24 months from the original filing. 19 of the 37 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.

At a glance

Project

  • NameGULMOHAR SOCIETY
  • TypeOthers
  • Location
    • AMBAR ALI
    • JUNNAR
    • Junnar (M Cl)
    • Pune
    • 410502
  • Pincode410502
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020640
  • ReraGenie IDRG-MH-04834

Builder

  • NameNITIN SITARAM KULKARNI
  • Entity typeIndividual
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2019First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Apr 2019
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2025)
  • Buildings2 building records
  • Documents filed112 files

Current status

51%19 of 37 units booked
79.3%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GULMOHAR BUILDING A WINGNA7718321
GULMOHAR BUILDING B WINGNA5416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

GULMOHAR BUILDING A WING55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
GULMOHAR BUILDING B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29
BuildingClosed/CoveredTotal
GULMOHAR BUILDING A WING99
GULMOHAR BUILDING B WING2020

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area510 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityJUNNAR MUNICIPAL COUNCIL
Permissible FSI1464.77
Proposed, not sanctioned1,465 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBODKENAGAR JUNNAR
Estimated costRs 1.92 cr
Cost incurredRs 1.52 cr
Work done79.33%
BuildingWingEstimatedIncurred
GULMOHAR BUILDING A WINGNARs 1.31 crRs 91.43 lakh
GULMOHAR BUILDING B WINGNARs 60.80 lakhRs 60.80 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNITIN SITARAM KULKARNI
ArchitectAMOD DOSHI
EngineerSANTOSH PATIL
EngineerM/S N.S.KULKARNI & ASSOCIATES
Chartered AccountantM/S R.S.KHANDELWAL & CO
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantA S JANGADA & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
NITIN SITARAM KULKARNI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27012619583Dec 2025 → Dec 2027

Reason as filed by the promoterThe project has been extended due to no bookings for A Wing apart from shops; consequently, the project lacks sufficient funds to be completed. Further the promoter of the project was admitted to Poona Hospital for a brain hemorrhage from 16th May to 26th May and required further rest till July 20th.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Aug 2022

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1 FY 2026-27.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 FY 2026-27.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 for Q 1 2026-27.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Q- 4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Q- 4 2025-26.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 Q- 4 2025-26.pdf18 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf17 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf19 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf19 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf19 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf15 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf15 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Final.pdf26 Sep 2025
Form 1File: Form 1 Final_organized.pdf20 Jul 2025
Form 2File: FORM 2.pdf20 Jul 2025
Form 3File: Form 3 CA Signed Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular Final (1).pdf20 Jul 2025
Certificates of CA (Form 3)File: Form 3 CA Signed Final.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final_organized.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Final (1).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Uploaded.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 Final.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revise Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Uploaded.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Upload.pdf24 Dec 2024
Certificates of CA (Form 3)File: Final form 3.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FINAL Form 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf5 Aug 2024
Certificates of CA (Form 3)File: FORM 3 Upload.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Circular A B wing.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_11zon.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3 Upload.pdf20 Apr 2024
Layout approvalFile: 4) Revised Sanction Plan Highlighted_compressed.pdf6 Feb 2024
Copy of the legal title reportFile: Revised Legal Title Report-1-6_compressed.pdf6 Feb 2024
Copy of Layout Approval (in case of layout)File: 4) Revised Sanction Plan Highlighted_compressed.pdf6 Feb 2024
Declaration about Commencement CertificateFile: 3) Circular 32.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Circular A B wing.pdf6 Feb 2024
Certificates of CA (Form 3)File: FY 23-24 Q3.pdf6 Feb 2024
Declaration about Commencement CertificateFile: Circular 32.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Engineer Certificate).pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Engineer Certificate).pdf31 Jan 2024
Certificates of CA (Form 3)File: FY 23-24 Q2.pdf31 Jan 2024
Certificates of CA (Form 3)File: FY 23-24 Q2.pdf31 Jan 2024
Certificates of CA (Form 3)File: FY 23-24 Q2.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1_updated_FORM 5 Client.pdf31 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf8 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: edited_FORM 1.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: edited_Form 1.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: edited_FORM 2A.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR.pdf21 Nov 2023
Certificates of CA (Form 3)File: Form 3_Q2_Signed.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: compressed_FORM 1.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_FORM 2.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_FORM 2.pdf28 Sep 2023
Certificates of CA (Form 3)File: compressed_FY 22-23 Q4.pdf28 Sep 2023
Certificates of CA (Form 3)File: compressed_FY 23-24 Q1.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_compressed.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A.pdf15 Feb 2023
Disclosure of sold/ booked inventoryFile: sold circular.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Gulmohar_Signed.pdf29 Dec 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHRIRAM SOCITYOTUR9CompletedAug 2016Late, Sep 2016
SHIVAM COMPLEXOTUR24CompletedFeb 2013Feb 2013

How this compares with Pune

51%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GULMOHAR SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JUNNAR13,700+ in Pune

2 kmGULMOHAR SOCIETYCompleted 3Lapsed / revoked 5Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: NITIN SITARAM KULKARNI

NITIN SITARAM KULKARNI has 1 registration on MahaRERA, including GULMOHAR SOCIETY. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GULMOHAR SOCIETY is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GULMOHAR SOCIETY?

The registered promoter entity is NITIN SITARAM KULKARNI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GULMOHAR SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GULMOHAR SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GULMOHAR SOCIETY?

The professionals named in the filing: Architect: NITIN SITARAM KULKARNI; Architect: AMOD DOSHI; Engineer: SANTOSH PATIL; Engineer: M/S N.S.KULKARNI & ASSOCIATES; Chartered Accountant: M/S R.S.KHANDELWAL & CO; Chartered Accountant: PGMJ & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GULMOHAR SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GULMOHAR SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GULMOHAR SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.