GULMOHAR RESIDENCY
RG-MH-27605 · RERA P52100034222 · Last updated on MahaRERA portal: 31 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GULMOHAR RESIDENCY is a Residential / Group Housing project by SRUSHTI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100034222 on 25 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 36 of the 48 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameGULMOHAR RESIDENCY
- TypeResidential / Group Housing
- Location
- S NO 63
- 64/A/B
- 65 OPPOSITE RAJYOG BUILDING
- KALYAN PETH
- JUNNAR
- Junnar (M Cl)
- Pune
- 410502
- Pincode410502
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100034222
- ReraGenie IDRG-MH-27605
Builder
- NameSRUSHTI DEVELOPERS
- Entity typePartnership
- PartnersADITYA MAHESH PURVANT, MAYURESH AVINASH WABLE, SAAEEL DILIP DHOBLE, RUTVIJA SACHIN WABLE
- Other registrations8 more →
- Completed5 of 9
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Mar 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 31 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GULMOHAR RESIDENCY | NA | 8 | 6 | 48 | 0 | 48 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
GULMOHAR RESIDENCY: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 31 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GULMOHAR RESIDENCY | NA | Rs 6.46 cr | Rs 5.24 cr |
| - | NA | Rs 25.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KIVAS ASSOCIATES ASSOCIATES |
| Engineer | VIJAY VYANKATESH GUNDE |
| Chartered Accountant | CA RISHIKESH KAMALAKAR KOTHAWALE |
| Partner | Role in project |
|---|---|
| SRUSHTI DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form1 sep 25.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: form 1 dec 25.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: form 2 sep 25.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: form 2 dec 25.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: form 3 sep 25.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: form3 dec 25.pdf | 31 Dec 2025 |
| Form 1File: 1 F1 FEB 22.pdf | 19 Sep 2025 |
| Form 2File: 1 F2 REGI.pdf | 19 Sep 2025 |
| Form 3File: 0 Form3 REG.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 JUNE 22.pdf | 19 Sep 2025 |
| Form 1File: 2 F1 JUNE 22.pdf | 19 Sep 2025 |
| Form 2File: 2 f2 june 22.pdf | 19 Sep 2025 |
| Form 3File: 2 f3 june 22.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 JUNE 22.pdf | 19 Sep 2025 |
| Form 1File: 3 f1 sep 22.pdf | 19 Sep 2025 |
| Form 2File: 3 f2 sep 22.pdf | 19 Sep 2025 |
| Form 3File: 3 f3 sep 22.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 SEP 22.pdf | 19 Sep 2025 |
| Form 1File: 4 F1 DEC22.pdf | 19 Sep 2025 |
| Form 2File: 4 F2 DEC22.pdf | 19 Sep 2025 |
| Form 3File: 4 F3 DEC 22 (2).pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 DISC DEC 22.pdf | 19 Sep 2025 |
| Form 1File: 5 F1 MAR 23.pdf | 19 Sep 2025 |
| Form 2File: 5 F2 MAR 23.pdf | 19 Sep 2025 |
| Form 3File: 5 F3 MAR 23.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 DISC MAR 23.pdf | 19 Sep 2025 |
| Form 1File: 6 F1 JUNE 23 (2).pdf | 19 Sep 2025 |
| Form 2File: 6 F2 JUNE 23.pdf | 19 Sep 2025 |
| Form 3File: 6 F3 June23.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 6 DISC JUNE 23.pdf | 19 Sep 2025 |
| Form 1File: 7 F1 SEP23.pdf | 19 Sep 2025 |
| Form 2File: 7 F2 SEP 23.pdf | 19 Sep 2025 |
| Form 3File: 7 F3 Sept2023.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 7 DISC SEP 23.pdf | 19 Sep 2025 |
| Form 1File: 8 F1 DEC 23.pdf | 19 Sep 2025 |
| Form 2File: 8 F2 DEC 23.pdf | 19 Sep 2025 |
| Form 3File: 8 f3 31 12 23.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 8 DISC DEC 23.pdf | 19 Sep 2025 |
| Form 1File: 9 F1 MAR 24.pdf | 19 Sep 2025 |
| Form 2File: 9 F2 MAR 24.pdf | 19 Sep 2025 |
| Form 3File: 9 F3 MAR 24.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 9 DISC MAR 24.pdf | 19 Sep 2025 |
| Form 1File: 10 F1 JUNE 24.pdf | 19 Sep 2025 |
| Form 2File: 10 F2 JUNE 24.pdf | 19 Sep 2025 |
| Form 3File: 100 f3 30 06 24.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 10 DISC JUNE 24.pdf | 19 Sep 2025 |
| Form 1File: 11 F1 SEP 24.pdf | 19 Sep 2025 |
| Form 2File: 11 F2 SEP 24.pdf | 19 Sep 2025 |
| Form 3File: 11 Form3_Sept24.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 11 DISC SEP 24.pdf | 19 Sep 2025 |
| Form 1File: 12 F1 DEC 24.pdf | 19 Sep 2025 |
| Form 2File: 12 F2 DEC 24.pdf | 19 Sep 2025 |
| Form 3File: 12 Form3_Dec24.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 12 DISC DEC 24.pdf | 19 Sep 2025 |
| Form 1File: 13 F1 MAR 25.pdf | 19 Sep 2025 |
| Form 2File: 13 F2 MAR 25.pdf | 19 Sep 2025 |
| Form 3File: 13 f3 mar 25.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 13 MAR 25.pdf | 19 Sep 2025 |
| Form 1File: 14 F1 JUNE 25.pdf | 19 Sep 2025 |
| Form 2File: 14 F2 june 25.pdf | 19 Sep 2025 |
| Form 3File: 140 f3 30 06 25.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 14 DISC JUNE 25.pdf | 19 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 22.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 23.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 March 23.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A March 22.pdf | 20 Oct 2023 |
| Details of encumbrancesFile: Legal Encumbrance.pdf | 22 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 22 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf | 22 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 22 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 22 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 22 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank ac declaration.pdf | 22 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation wrt alottment.pdf | 22 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GULMOHAR RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JUNNAR13,700+ in Pune
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
SHIVAI SAHAKARI GRUH NIRMAN SANSTHA MARYADIT
MAYURESH DEVELOPERS
VIJAYALAXMI SULOJAY
SHREEVIJAYALAXMI DEVELOPERS
SHIVSAHYADRI
NANDANVAN DEVELOPERS
SURYAPRASTHA
SURYAPUTRA DEVELOPERS
GULMOHAR SOCIETY
NITIN SITARAM KULKARNI
AAHANA
DEVKI HOUSING PVT LTD
Builder: SRUSHTI DEVELOPERS
SRUSHTI DEVELOPERS has 9 registrations on MahaRERA, including BELLAGIO and Sun-Srushti Greens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GULMOHAR RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GULMOHAR RESIDENCY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GULMOHAR RESIDENCY?
The registered promoter entity is SRUSHTI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GULMOHAR RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GULMOHAR RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GULMOHAR RESIDENCY?
The professionals named in the filing: Architect: KIVAS ASSOCIATES ASSOCIATES; Engineer: VIJAY VYANKATESH GUNDE; Chartered Accountant: CA RISHIKESH KAMALAKAR KOTHAWALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GULMOHAR RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback