Gulmohar Residency
RG-MH-31347 · RERA P52600079681 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gulmohar Residency is a Residential / Group Housing project by Gulmohar Residency in Solapur, Maharashtra, registered with MahaRERA as P52600079681 on 20 Mar 2025. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 6 of the 27 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.
At a glance
Project
- NameGulmohar Residency
- TypeResidential / Group Housing
- Location
- Majrewadi
- Solapur
- Solapur (M Corp.)
- Solapur North
- 413003
- Pincode413003
- RERA no.P52600079681
- ReraGenie IDRG-MH-31347
Builder
- NameGulmohar Residency
- Entity typeOthers
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Mar 2025
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed69 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gulmohar Residency - Wing A | NA | 1 | 1 | 16 | 0 | 16 |
| Gulmohar Residency - Wing B | NA | 1 | 0 | 11 | 0 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 65%.
Gulmohar Residency - Wing A28%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Gulmohar Residency - Wing B24%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 65% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Asha Vasantrao Deshmukh | Solapur (M Corp.) | Solapur |
| Prakash Vasantrao Deshmukh | Solapur (M Corp.) | Solapur |
| Shivanand Bhimraya Solapure | Solapur (M Corp.) | Solapur |
| Prabhakar Baliram Chougule | Solapur (M Corp.) | Solapur |
| Shrikant Prabhakar Choughule | Solapur (M Corp.) | Solapur |
| Sidram Somanna Kamble | Solapur (M Corp.) | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Gulmohar Residency - Wing A | NA | Rs 3.50 cr | Rs 1.25 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sunil C Patki |
| Engineer | Saqlain I Shaikh |
| Chartered Accountant | Vaibhav Kambale and Co CA Vaibhav Kambale |
| Chartered Accountant | Huzaifa Sanawadwala |
| Partner | Role in project |
|---|---|
| Gulmohar Residency | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDelay In Booking
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - Architect Q4 2526.pdf | 13 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer Gulmohar Residency Q4 2526.pdf | 13 Apr 2026 |
| Withdrawal Update Form 3File: FORM-3 GULMOHAR Q4 2526.pdf | 13 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 2 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 31 Jan 2026 |
| Form 1File: Form 1.pdf | 17 Jan 2026 |
| Form 2File: Form 2.pdf | 17 Jan 2026 |
| Form 3File: Form 3.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf | 17 Jan 2026 |
| Form 1File: Form 1.pdf | 17 Jan 2026 |
| Form 2File: Form 2.pdf | 17 Jan 2026 |
| Form 3File: Form 3.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf | 17 Jan 2026 |
| Form 1File: Form 1.pdf | 17 Jan 2026 |
| Form 2File: Form 2.pdf | 17 Jan 2026 |
| Form 3File: Form 3.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 17 Jan 2026 |
| Form 1File: Form 1.pdf | 17 Jan 2026 |
| Form 2File: Form 2.pdf | 17 Jan 2026 |
| Form 3File: Form 3.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 17 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Gulmohar Residency.pdf | 15 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Gulmohar Residency.pdf | 15 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan Mar 10, 2025 (1) (1).pdf | 15 Mar 2025 |
| PAN CardFile: ilovepdf_merged (74).pdf | 3 Mar 2025 |
| PAN CardFile: 1 PAN Card (40)_organized.pdf | 3 Mar 2025 |
| Other - FinanceFile: ilovepdf_merged (74).pdf | 3 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Gulmohar Deshmukh format b.pdf | 3 Mar 2025 |
| Other - LegalFile: Gulmohar promoter.pdf | 18 Feb 2025 |
| Other - FinanceFile: 2 Declaration about all RERA Designated Bank Accounts (Format A) (1).pdf | 18 Feb 2025 |
| Other - FinanceFile: saprate entity.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gulmohar Form 3 (1).pdf | 15 Jan 2025 |
| Other - LegalFile: saprate entity (1) (1).pdf | 15 Jan 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_200335423703_For_Asset_Based_Search_15_01_2025_14_10_50_472.pdf | 15 Jan 2025 |
| CERSAI detailsFile: CERSAI Declaration Gulmohar.pdf | 15 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: gulmohar (1)_organized.pdf | 15 Jan 2025 |
| Other - FinanceFile: saprate entity (1) (1).pdf | 15 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: pov primary (1).pdf | 15 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Screenshot of mail sent for cc verification Gulmohar.pdf | 26 Dec 2024 |
| Other - TechnicalFile: Declaration of Non Registration Layout Project Gulmohar Residency.pdf | 26 Dec 2024 |
| Other - TechnicalFile: Screenshot of mail sent for cc verification Gulmohar.pdf | 26 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Gulmohar Email.pdf | 18 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Promoter Letterhead Gulmohar.pdf | 18 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Real Estate Projects Gulmohar.pdf | 18 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration Finance Gulmohar.pdf | 16 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration Legal Gulmohar.pdf | 16 Dec 2024 |
| Proforma of Allotment letterFile: Allotment Letter Flat Own Land Gulmohar.pdf | 16 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Flat Own Land Gulmohar.pdf | 16 Dec 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration Finance Gulmohar.pdf | 16 Dec 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration Legal Gulmohar.pdf | 16 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation ATS Apartment Own Land Gulmohar.pdf | 16 Dec 2024 |
| Proforma of Agreement for saleFile: Agreement to sale Flat Own Land Gulmohar.pdf | 16 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Finance Secured Gulmohar.pdf | 16 Dec 2024 |
| Layout approvalFile: Plan.pdf | 28 May 2024 |
| Building plan approvalFile: Plan.pdf | 28 May 2024 |
| Copy of Layout Approval (in case of layout)File: Plan.pdf | 28 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: GULMOHOR CC.pdf | 28 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf | 28 May 2024 |
| Declaration about Commencement CertificateFile: DCC Multipul buildings.pdf | 28 May 2024 |
| Copy of the legal title reportFile: Gulmohar.pdf | 25 May 2024 |
| Declaration in FORM BFile: Form B Gulmohar.pdf | 25 May 2024 |
| Declaration in FORM BFile: shrikant form b.pdf | 25 May 2024 |
| Declaration in FORM BFile: Shobha form B.pdf | 25 May 2024 |
| Declaration in FORM BFile: ravindra form b.pdf | 25 May 2024 |
| Declaration in FORM BFile: prakash form b.pdf | 25 May 2024 |
| Declaration in FORM BFile: Asha form B.pdf | 25 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gulmohar Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Solapur550+ in Solapur
MHDCL ANTROLIKAR NAGAR SOLAPUR PMAY PROJECT
MAHARASHTRA HOUSING DEVELOPMENT CORPORATIO
PANJWANI MARKET
V V SOMSHETTI BUILDERS LLP
F.F AMORA
F F CITY TOWER DEVELOPERS
HEXA-VIP PRIME
Hexaforce Construction LLP
Sripad Shirvallabh Dream Homes
Yog Builders And Developers
JayPrakash Heights
Vijay Constructions
See every Solapur project, with the district possession charts
Builder: Gulmohar Residency
Gulmohar Residency has 1 registration on MahaRERA, including Gulmohar Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if Gulmohar Residency is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gulmohar Residency?
The registered promoter entity is Gulmohar Residency, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gulmohar Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gulmohar Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gulmohar Residency?
The professionals named in the filing: Architect: Sunil C Patki; Engineer: Saqlain I Shaikh; Chartered Accountant: Vaibhav Kambale and Co CA Vaibhav Kambale; Chartered Accountant: Huzaifa Sanawadwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gulmohar Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback