Home / Browse projects / Thane, Maharashtra / GREEN WORLD
GREEN WORLD
RG-MH-19913 · RERA P51700003889 · Last updated on MahaRERA portal: 18 Jan 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 82 months past the filed date
- 85 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GREEN WORLD is a Others project by AKSHAR SPACE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700003889 on 6 Aug 2017. Possession was promised by 31 Dec 2019 and is now 82 months past that date. 85 complaints are on record with the regulator.
At a glance
Project
- NameGREEN WORLD
- TypeOthers
- Location
- Thane (M Corp.)
- Thane
- 400708
- Pincode400708
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700003889
- ReraGenie IDRG-MH-19913
Builder
- NameAKSHAR SPACE PVT LTD
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion31 Dec 2019
- Revised completionNone
- Buildings11 building records
- Documents filed25 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B WING | NA | 24 | 0 | 0 | 0 | 0 |
| C WING | NA | 24 | 0 | 0 | 0 | 0 |
| D WING | NA | 24 | 0 | 0 | 0 | 0 |
| H WING | NA | 24 | 0 | 0 | 0 | 0 |
| I WING | NA | 23 | 0 | 0 | 0 | 0 |
| A1 WING | NA | 24 | 0 | 0 | 0 | 0 |
| E WING | NA | 24 | 0 | 0 | 0 | 0 |
| A2 WING | NA | 24 | 0 | 0 | 0 | 0 |
| F WING | NA | 24 | 0 | 0 | 0 | 0 |
| G WING | NA | 24 | 0 | 0 | 0 | 0 |
| SHOPS | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building11
As on 18 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
64 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Internal walls, at 90%.
B WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
C WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
D WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
H WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
I WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
A1 WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
E WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
A2 WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
F WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
G WING79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
SHOPS73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 18 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 90% |
Parking filed277
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| B WING | 17 | 22 | 39 |
| C WING | 17 | 22 | 39 |
| D WING | 18 | 22 | 40 |
| H WING | 16 | 22 | 38 |
| I WING | 14 | 22 | 36 |
| A1 WING | 8 | 0 | 8 |
| E WING | 16 | 22 | 38 |
| A2 WING | 6 | 0 | 6 |
| F WING | 17 | 0 | 17 |
| G WING | 16 | 0 | 16 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MOUNT MARY BUILDERS | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Stellar Design Studio |
| Architect | Satish Ahuja & Associates |
| Architect | Arunkumar Landscape Architect Pvt. Ltd. |
| Engineer | Structural Concept Designs Pvt. Ltd. |
| Partner | Role in project |
|---|---|
| AKSHAR SPACE PVT LTD | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 116/2014/2014 | Honourable Thane Court | AMENDED PLAINT |
Complaints filed with MahaRERA85
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055144 | Pritam Vilas Murudkar | M/s Mount Mary Builders | 26/07/2018 |
| CC006000000000089 | VENKATA PHANINDRA KUMAR VALLURI | M/S AKSHAR SPACE PRIVATE LIMITED | 30/09/2017 |
| CC006000000057099 | KARUNAKAR GOVIND SHETTY | GREEN WORLD DEVELOPERS PVT. LTD. | 29/11/2018 |
| CC006000000057103 | RATNAKAR GOVIND SHETTY | Mount Mary Builders | 30/11/2018 |
| CC006000000057112 | KARUNAKAR GOVIND SHETTY | MOUNT MARY BUILDERS | 30/11/2018 |
| CC006000000089795 | SANA HOSPITALITY SERVICES PVT. LTD. | SUSHILA SURESHBABU MALGE, PROPRIETOR OF MOUNT MARY BUILDERS | 19/06/2019 |
| CC006000000054976 | DR. CHARUSHEELA ASHWIN GAJRA | M/S MOUNT MARY BUILDERS PVT LTD AND AKSHAR SPACE PVT LTD | 18/06/2018 |
| CC006000000000977 | Ramesh P Singh | M/S AKSHAR SPACE PVT LIMITED | 30/09/2017 |
| CC006000000000733 | SANDIP NAMDEO SHERKAR | AksharSpace Pvt ltd. | 30/09/2017 |
| CC006000000000987 | Somaji Kubal | Akshar Space Pvt Ltd | 30/09/2017 |
| CC006000000000870 | Abhijit Jadhav | M/S Akshar Space Private Limited | 30/09/2017 |
| CC006000000000950 | HARSH KURRA & NEETU KURRA | M/SAKSHAR SPACE PRIVATE LIMITED | 30/09/2017 |
| CC006000000000985 | P V S S VARMA | Akshar Space Pvt. Ltd | 30/09/2017 |
| CC006000000001014 | Lalit Bhosale | M/s Akshar Space Pvt Ltd | 11/10/2017 |
| CC006000000001092 | Deepa Dalvi | Mount mary builders & Akshar | 21/05/2018 |
| CC006000000001737 | Richa Agrawal | M/s Mount Mary Builders | 20/12/2017 |
| CC006000000012758 | P Satyanarayan | Akshar Space Pvt Ltd | 09/01/2018 |
| CC006000000001294 | Prashant Pandey | Mount Mary Builders | 11/08/2018 |
| CC006000000078624 | Prashant Pandey | Mount Mary Builders | 23/03/2019 |
| CC006000000001407 | HARVINDAR SINGH GAMBHIR | M/s AKSHAR SPACE PVT. LTD. | 26/10/2017 |
| CC006000000001573 | Dhansukhlal K. Morabia | Akshar Space Pvt.Ltd. | 30/10/2017 |
| CC006000000001581 | Rajesh Ramchandra Mahadik | Akshar Space Pvt. Ltd | 30/10/2017 |
| CC006000000001586 | Amit Shankar Bhalotia | Akshar Space pvt. ltd | 30/10/2017 |
| CC006000000001597 | Rajkishor Rajak | MRS. Sushila Sureshbabu Malge | 10/11/2017 |
| CC006000000001720 | Sayee Subramanian | Akshar Space Private Limited | 17/05/2018 |
| CC006000000055452 | Sayee Subramanian | Akshar Space Private Limited | 26/07/2018 |
| CC006000000012669 | Manojkumar Lalbahadur Singh | Hari B Mujat of Akshar Space Pvt Ltd. | 29/12/2017 |
| CC006000000012750 | Nitin J Jaigude | Akshar Space Pvt Ltd | 09/06/2018 |
| CC006000000022905 | Farzana Shaikh | Akshar Space pvt ltd | 16/03/2018 |
| CC006000000022920 | Vishal Bhosale | Akshar SpacePvt. Ltd. | 05/03/2018 |
| CC006000000022978 | Souvik Das | Akshar Space Pvt Ltd | 18/01/2018 |
| CC006000000023649 | Shrikant Muthineni | Mount Mary | 01/04/2018 |
| CC006000000023859 | Deepak Anand | Akshar space pvt. ltd. & mount mary builders | 23/03/2018 |
| CC006000000023844 | Possession delayed | M/S.MOUNT MARY BUILDERS | 29/04/2018 |
| CC006000000023887 | Niladri Sen | Hari B. Mujat for Akshar Space Pvt Ltd | 06/10/2018 |
| CC006000000023869 | Varghese Samuel | M/s Mount Mary Builders and M/s Akshar Space Pvt Ltd | 23/06/2018 |
| CC006000000023880 | Tirupati Kodari | SURESH BABU MALGE - MOUNT MARY BUILDER | 25/06/2018 |
| CC006000000054842 | Aditi Mazumder | Mount Mary Builders & akshar Space Pvt Ltd | 09/06/2018 |
| CC006000000195420 | Sandeep Daga | Akshar Space Private Limited | 28/12/2020 |
| CC006000000055516 | CC006000000055516 | sureshbabu ganpat malge | 13/08/2018 |
| CC006000000054816 | ABODH KUMAR PATHAK AND ANUPAMA A PATHAK | M/S MOUNT MARY BUILDERS | 07/06/2018 |
| CC006000000054663 | Vinod Kanjan | Mount Mary Builders & Akshar Space Pvt Ltd | 29/05/2018 |
| CC006000000054837 | RAMESH JADHAV | mount mary builders & akshar space pvt ltd | 08/06/2018 |
| CC006000000054969 | VISHAL NALKUR | Mount Mary Builders & Akshar Space Pvt Ltd | 17/06/2018 |
| CC006000000054995 | manoj kumar singh | mount mary builders & akshar space pvt ltd | 19/06/2018 |
| CC006000000055000 | Mr. Irfan Goundi | Mount mary builders & Akshar Space pvt ltd | 20/06/2018 |
| CC006000000055006 | Prathamesh Vijay Ternikar | Akshar Space Pvt Ltd | 20/06/2018 |
| CC006000000055015 | Pranav Sawant | mount mary builders | 22/06/2018 |
| CC006000000055254 | ASHISH KESHAVPRASAD CHATURVEDI | MRS SUSHILA SURESHBABU MALGE OF M/S MOUNT MARY BUILDERS | 05/07/2018 |
| CC006000000055331 | Mr. Ramdas Date | Mr. Sureshbhau Malge | 22/07/2018 |
| CC006000000055342 | Reshma Ritesh Shetty | Mount Mary Builders and Akshar Space Pvt Ltd | 13/07/2018 |
| CC006000000055426 | Anis Abdul Kader Khan | M/s Mount Mary Builders | 21/07/2018 |
| CC006000000110676 | Anis Abdul Kader Khan | Mount Marry Builders | 03/09/2019 |
| CC006000000055404 | Mr.Samson Pandi | Akshar Space Pvt.Ltd. | 19/07/2018 |
| CC006000000055418 | Patel Anjali Suryaprakash Reddy | SURESH BABU MALGE-MOUNT MARY BUILDERS | 21/07/2018 |
| CC006000000055476 | JITENDRA SWARNKAR | HARI B MUJAT | 23/07/2018 |
| CC006000000055774 | Narendra Kumar | Mount Mary Builders | 16/08/2018 |
| CC006000000056366 | Rohan Tadke | Mount Mary Builders | 28/09/2018 |
| CC006000000056364 | zahid patel | mount mary developers | 29/09/2018 |
| CC006000000057363 | Amit Kitey | Mr Sureshbabu Malge - Mount Mary Builders | 18/12/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Jan 2023
Documents filed25
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 18 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Completion Certificate.pdf | 18 Jan 2023 |
| Certificates of CA (Form 5)File: FORM 5 greenworld.pdf | 14 Oct 2019 |
| Certificates of CA (Form 5)File: akshar space Pvt Ltd From 5.pdf | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1.pdf | 17 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 17 Aug 2018 |
| Certificates of CA (Form 3)File: Form 3.pdf | 16 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From-1 Architect Certificate 2-4-18.pdf | 10 Apr 2018 |
| Certificates of CA (Form 3)File: FORM 3 - GREEN WORL - FEB 18.pdf | 29 Mar 2018 |
| Layout approvalFile: Layout Plan with Phases.pdf | 31 Jul 2017 |
| PAN CardFile: MALGE PAN.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: DETAILS_OF_ENCUMBRANCES_FINAL.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan with Phases.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Form B - Affidavit Rev-compressed.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From-1 Architect Certificate New.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate - Revised.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Revised_Form_3_MOUNT_MARY.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: FORM_3_GW_REVISED.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: RERA_AGREEMENT_-_FINAL_DRAFT_GW.pdf | 31 Jul 2017 |
| Building plan approvalFile: CC PLAN MERGED-compressed.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: CC PLAN MERGED-compressed.pdf | 27 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: C C-GW-compressed.pdf | 26 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter-Green World - RERA DRAFT-GW.pdf | 26 Jul 2017 |
| PAN CardFile: AKSHAR SPACE PVT LTD_PAN CARD.pdf | 22 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 25 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GREEN WORLD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane (M Corp.)7,600+ in Thane
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
NIFT City - BKC II Building A
DELTA VENUS INFRA LLP
NEWA BUSINESS PARK II
NEWA REALITY INFRASTRUCTURE
Maplewood Phase III
BKS GALAXY REALTORS LLP
CAPITAL EDGE
JINDAL TODAY INFRA LLP
Airoli Co op housing soc Ltd.
Jayant Shashikant Parikh
ALTUS 24
JINDAL TODAY INFRA LLP
See every Thane project, with the district possession charts
Builder: AKSHAR SPACE PVT LTD
AKSHAR SPACE PVT LTD has 1 registration on MahaRERA, including GREEN WORLD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that GREEN WORLD shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GREEN WORLD is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GREEN WORLD?
The registered promoter entity is AKSHAR SPACE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GREEN WORLD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GREEN WORLD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GREEN WORLD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GREEN WORLD?
The professionals named in the filing: Architect: Stellar Design Studio; Architect: Satish Ahuja & Associates; Architect: Arunkumar Landscape Architect Pvt. Ltd.; Engineer: Structural Concept Designs Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GREEN WORLD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback