Home / Browse projects / Kolhapur, Maharashtra / Green Valley Phase 3

Completed No litigation declared Residential / Group Housing project

Green Valley Phase 3

By H M DEVELOPERS

RG-MH-16274 · RERA P53000025545 · Last updated on MahaRERA portal: 16 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Green Valley Phase 3 is a Residential / Group Housing project by H M DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000025545 on 28 Jun 2020. The registration is recorded completed; possession was promised by 30 Jun 2023.

At a glance

Project

  • NameGreen Valley Phase 3
  • TypeResidential / Group Housing
  • Location
    • Cts No. 51B/2
    • Jaysingpur
    • Jaysingpur (M Cl)
    • Shirol
    • Kolhapur
    • 416101
  • Pincode416101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000025545
  • ReraGenie IDRG-MH-16274

Builder

  • NameH M DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAMFH2791K1ZU
  • PartnersPRAVEENKUMAR MEGHRAJ BALDAWA, RUPAL PRAVEENKUMAR BALDAWA, SIDDHARTH PRAVEENKUMAR BALDAWA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2020PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2020
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ApartmentNA80000
BungalowNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Apartment82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bungalow82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered16
Open Space64
BuildingClosed/CoveredOpen SpaceTotal
Apartment166076
Bungalow044

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,920 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityJaysingpur Municipal Council
Permissible FSI2799.73
Proposed, not sanctioned2,800 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA B Patil Complex Subhash Road 9th lane Jaysingpur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRushikesh Basagare
EngineerSwapnil Pawar
Chartered AccountantShajmal Mullik
PartnerRole in project
H M DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Oct 2024

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM4 RERA PHASE III.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate Dec 22.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate March 23.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate June 23.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate Sept 23.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate Dec 23.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate March 24.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate Sept 22.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate Dec 22.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate Dec 23.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate Sept 23.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate June 23.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate March 23.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate Sept 22.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GVP3 CA Certificate June 22.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate June 22.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate Dec 23.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate Sept 23.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate June 23.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate March 23.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate Dec 22.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate March 22.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate Dec 21.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate Sept 21.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate June 21.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GVP3 Engineer Certificate Sept 22.pdf14 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: GVP3 Deed of Declaration Min.pdf14 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GVP3 Full Occupancy Certificate.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GVP3 CA Annual Audit Report March 21.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GVP3 Engineer Quality Assurance March 21.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: GVP3 Sold Unsold Inventory .pdf14 Oct 2024
Declaration about Commencement CertificateFile: GVP3 Declaration of Commencement Certificate .pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GVP3 CA Annual Audit Report March 22.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GVP3 Engineer Quality Assurance March 22.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GVP3 Engineer Quality Assurance March 23.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GVP3 CA Annual Audit Report March 23.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GVP3 Engineer Quality Assurance March 24.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GVP3 CA Annual Audit Report March 24.pdf14 Oct 2024
Building plan approvalFile: HM Revised Blueprint.pdf19 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: HM Revised Blueprint.pdf19 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: GVP3 Revised Permission Certificate .pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HM CA certificate 1 min.pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HM CA certificate 2 min.pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HM CA certificate 3 min.pdf19 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HM CA certificate 4 min.pdf19 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GVP3 Part Occupancy Certificate .pdf19 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate June 21.pdf14 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate Sep 21.pdf14 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate Dec 21.pdf14 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate March 22.pdf14 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GVP3 Architect Certificate June 22.pdf14 Dec 2022
Layout approvalFile: HM Sanction Layout.pdf8 Jun 2020
Building plan approvalFile: HM Blueprint old final.pdf8 Jun 2020
Building plan approvalFile: HM Blueprint revised final.pdf8 Jun 2020
PAN CardFile: HM PAN card.pdf8 Jun 2020
Copy of the legal title reportFile: HM Search Report.pdf8 Jun 2020
Details of encumbrancesFile: HM Encumbrance Certificate.pdf8 Jun 2020
Copy of Layout Approval (in case of layout)File: HM Sanction Layout.pdf8 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: HM Blueprint old final.pdf8 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: HM Blueprint revised final.pdf8 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: HM Commencement Certificate Min.pdf8 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: HM Commencement Certificate Revised.pdf8 Jun 2020
Declaration in FORM BFile: HM Developers Declaration Form B.pdf8 Jun 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HM CA Certificate.pdf8 Jun 2020
Proforma of Allotment letterFile: HM Sale deed draft Flat.pdf8 Jun 2020
Proforma of Allotment letterFile: HM Sale deed draft bunglow min.pdf8 Jun 2020

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Green Valley Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jaysingpur880+ in Kolhapur

2 kmGreen Valley Phase 3Completed 6Lapsed / revoked 4Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: H M DEVELOPERS

H M DEVELOPERS has 2 registrations on MahaRERA, including Green Valley Phase 3 and 101 BOULEVARD. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Green Valley Phase 3 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Valley Phase 3?

The registered promoter entity is H M DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAMFH2791K1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Valley Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Valley Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Valley Phase 3?

The professionals named in the filing: Architect: Rushikesh Basagare; Engineer: Swapnil Pawar; Chartered Accountant: Shajmal Mullik. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Valley Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Valley Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Valley Phase 3 to a free account