Red flags
- Registration lapsed
- Possession 55 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green Leaf is a Residential / Group Housing project by Jai Ganesh Developers in Pune, Maharashtra, registered with MahaRERA as P52100015561 on 8 Mar 2018. Possession was promised by 30 Mar 2022 and is now 55 months past that date.
At a glance
Project
- NameGreen Leaf
- TypeResidential / Group Housing
- Location
- Fursungi Road
- Fursungi
- Haveli
- Pune
- 412308
- Pincode412308
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100015561
- ReraGenie IDRG-MH-62603
Builder
- NameJai Ganesh Developers
- Entity typePartnership
- PartnersDevendra Bankatlal Rathi, Kamlesh Shriniwas Khatod, Manoj Ramdayal Asawa, Ronak Shamsundar Lahoti, Nitin Suresh Malpani, Babir Sambhaji Lokhande
- Other registrations6 more →
- Completed1 of 7
- No longer live6 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Mar 2018
- Promised completion30 Mar 2022
- Revised completionNone
- Buildings4 building records
- Documents filed34 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 6 | 0 | 0 | 0 | 0 |
| Building B | NA | 7 | 0 | 0 | 0 | 0 |
| C | NA | 9 | 0 | 0 | 0 | 0 |
| D | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 5 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
35 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
Building A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed67
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A | 26 | 26 |
| Building B | 26 | 26 |
| C | 1 | 1 |
| D | 14 | 14 |
Land and ownership7
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Manisha Zende and others | Fursungi | Pune |
| Subhadra Laxman Harpale | Fursungi | Pune |
| Ranjana Nivruti Gogawale | Dhankawadi | Pune |
| Sushila Shankar Shelar | Dhankawadi | Pune |
| Savita Patil Ghule | MOHAMMADWADI | Pune |
| Rupali Raghunath Sable | Hadapsar | Pune |
| Shubhangi Shankar Gogawale | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATIT SHRIKANT ADMULWAR |
| Engineer | Pravin Manohar Kowley |
| Partner | Role in project |
|---|---|
| Jai Ganesh Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Feb 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Feb 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Mar 2023
Documents filed34
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA ENGG CERT JGD_compressed.pdf | 5 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA ENGG CERT JGD_compressed.pdf | 5 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA ENGG CERT JGD_compressed.pdf | 5 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RERA ENGG CERT JGD_compressed.pdf | 5 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 21-22 Signed JGD.pdf | 5 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: RERA 18-19 CA CERT.pdf | 30 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA 18-19 CA CERT.pdf | 30 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA 19-20 FY CA.pdf | 30 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA 20-21 FY CA CERT.pdf | 30 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 21-22 Signed CA GREEN LEAF.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 4_compressed.pdf | 5 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC (1).pdf | 5 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC (1).pdf | 5 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC (3).pdf | 5 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC (2).pdf | 5 Mar 2023 |
| OtherFile: A BLD COMPLETION CERTIFICATE PDF DEC 22.pdf | 20 Dec 2022 |
| OtherFile: C-D COMPLETION CERTIFICATE GREEN LEAF.pdf | 20 Dec 2022 |
| OtherFile: COMPLETION B BLD.pdf | 1 Aug 2021 |
| OtherFile: COMPLETION B BLD.pdf | 1 Aug 2021 |
| OtherFile: COMPLETION B BLD.pdf | 1 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: PMRDA Permission and Commencement certificat.pdf | 5 Mar 2018 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf | 5 Mar 2018 |
| Details of encumbrancesFile: No Encumbrances compressed.pdf | 24 Feb 2018 |
| Building plan approvalFile: PMRDA San Plan.pdf | 22 Feb 2018 |
| Layout approvalFile: PMRDA San Plan.pdf | 22 Feb 2018 |
| PAN CardFile: PAN JAY GANESH.pdf | 22 Feb 2018 |
| Copy of the legal title reportFile: Legal Title _Search Report.pdf | 22 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: PMRDA San Plan.pdf | 22 Feb 2018 |
| Building Plan Approval (IOD)File: PMRDA San Plan.pdf | 22 Feb 2018 |
| Declaration in FORM BFile: Form B.pdf | 22 Feb 2018 |
| Proforma of Allotment letterFile: Agreement to sale.pdf | 22 Feb 2018 |
| OtherFile: PMRDA Permission and Commencement certificat.pdf | 22 Feb 2018 |
| OtherFile: DEMARCATION.pdf | 22 Feb 2018 |
| OtherFile: NA order compressed.pdf | 22 Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 34 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Green Leaf on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Fursungi13,700+ in Pune
Filed coordinates, straight-line distance. 56 registered projects within 2 km.
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: Jai Ganesh Developers
JAI GANESH DEVELOPERS has 7 registrations on MahaRERA, including JAI GANESH HERITAGE and JAI GANESH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Green Leaf shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Green Leaf is delayed beyond 30 Mar 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green Leaf?
The registered promoter entity is Jai Ganesh Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green Leaf?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Green Leaf?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green Leaf?
The professionals named in the filing: Architect: ATIT SHRIKANT ADMULWAR; Engineer: Pravin Manohar Kowley. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Leaf?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback