Registration lapsed No litigation declared Residential / Group Housing project

Green Hive Plus Wing A3

By Ram India Shelters

RG-MH-27502 · RERA P52100033707 · Last updated on MahaRERA portal: 22 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 85%
0 of 118Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Green Hive Plus Wing A3 is a Residential / Group Housing project by Ram India Shelters in Pune, Maharashtra, registered with MahaRERA as P52100033707 on 2 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 118 of the 118 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameGreen Hive Plus Wing A3
  • TypeResidential / Group Housing
  • Location
    • Off Pune - Saswad Road
    • Phursungi
    • Fursungi
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033707
  • ReraGenie IDRG-MH-27502

Builder

  • NameRam India Shelters
  • Entity typePartnership
  • Other registrations7 more →
  • Completed4 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

10 months past promisethis monthRegisteredMar 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

100%118 of 118 units booked

Figures as on 22 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Green Hive Plus Wing A3NA18151180118

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 85%.

Green Hive Plus Wing A3: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area783 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI7776.42
Proposed, not sanctioned6,576 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDeccan Gymkhana Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Hardikar And Associates
EngineerRobin Savanur
Chartered AccountantCA Pushpak Bhogarti
PartnerRole in project
Ram India Shelters-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sign Ram India Form3_A3 Dec 2024.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC_A3.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG_A3.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: A3.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: A3_compressed.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 ARC JULY - SEP 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_A3_Sep24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG A3 JULY - SEP 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Green Hive plus wing A3 June 24 .pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: A3 DISCLOSURE.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 A3_.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 ARC April - June 2024.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG APRIL - JUNE 2024.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE WING A3_compressed.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 green hive plus wing A3 mar 24.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 ARC JAN - MAR 2024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG A3 JAN - MAR.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure Wing A3.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG A3.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 April to June 2023.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC July To Sep 2023 A3.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC_A3.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG APR TO JUNE 2023.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG July to Sep 2023 A3.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ram India Shelters-Form 3- A3.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Green Hive Plus_Wing A3 (2).pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Green Hive Wing A3_Dec 23.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: A3.pdf21 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 A3.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC A3.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC A3.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG Jan to March 2023_compressed.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA A3.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC July To Sep 2023 A3.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG July to Sep 2023 A3.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Green Hive Plus_Wing A3 (2).pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 April to June 2023.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG APR TO JUNE 2023.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ram India Shelters-Form 3- A3.pdf16 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate legal A3.pdf15 Apr 2023
Details of encumbrances concerned to FinanceFile: no encombrance A3 wing 2.pdf15 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate legal A3.pdf15 Apr 2023
Details of encumbrances concerned to LegalFile: no encombrance A3 wing 2.pdf15 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 ARC JUNE 2022_.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 ARCH SEP 2022_.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITEC A3 OCT TO DEC 2022_compressed.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG JUNE 2022_.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG SEP 2022_.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A3 ENG DEC 2022_.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Green Hive Plus Wing A3_June 2022_Signed_.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Greenhive Plus A3_Sept 2022_compressed.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA -Green hive plus wing a3_compressed.pdf15 Apr 2023
Copy of the legal title reportFile: Legal Title Search Report.pdf21 Feb 2022
Layout approvalFile: 01-34 (1).pdf19 Feb 2022
Building plan approvalFile: 08-34-merged (1).pdf19 Feb 2022
PAN CardFile: Ram India Shelters-PAN.pdf19 Feb 2022
Details of encumbrancesFile: Encumbrances scan A3.pdf19 Feb 2022
Copy of Layout Approval (in case of layout)File: 01-34 (1).pdf19 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 08-34-merged (1).pdf19 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf19 Feb 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf19 Feb 2022
Declaration in FORM BFile: Form B Wing A3-compressed.pdf19 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (3)_compressed.pdf19 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE WING A3_compressed.pdf19 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200229257357_For_Asset_Based_Search_01_02_2022_14_39_52_083.pdf19 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate wing A3-compressed-compressed_compressed_11zon.pdf19 Feb 2022
Proforma of Allotment letterFile: Agreement a3 18-02-2021-converted (1).pdf19 Feb 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Green Hive Plus Wing A13Phursungi118CompletedDec 2021Sep 2021
Green Hive Plus Wing A1Phursungi118CompletedDec 2021Sep 2021

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green Hive Plus Wing A3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Phursungi13,700+ in Pune

2 kmGreen Hive Plus Wing A3Completed 47Lapsed / revoked 15Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: Ram India Shelters

RAM INDIA SHELTERS has 8 registrations on MahaRERA, including GREEN HIVE B1 and Green Hive Plus A13. Its filings disclose 10 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Green Hive Plus Wing A3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Green Hive Plus Wing A3 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Hive Plus Wing A3?

The registered promoter entity is Ram India Shelters, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Hive Plus Wing A3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Hive Plus Wing A3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Hive Plus Wing A3?

The professionals named in the filing: Architect: Sandeep Hardikar And Associates; Engineer: Robin Savanur; Chartered Accountant: CA Pushpak Bhogarti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Hive Plus Wing A3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Hive Plus Wing A3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Hive Plus Wing A3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.