Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 54 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 88%
1Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

GRANDEUR is a Others project by SUNRISE ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011102 on 31 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 54 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGRANDEUR
  • TypeOthers
  • Location
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011102
  • ReraGenie IDRG-MH-97735

Builder

  • NameSUNRISE ASSOCIATES
  • Entity typePartnership
  • PartnersLAXMAN ANAND SHELAR, NARAYAN ANAND SHELAR, RAMESH VELJI GOGRI, MANOJ VELJI GOGRI, KANTILAL PREMJI NISHAR, LAKHAMSHI PREMJI NISAR
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GRANDEURNA340000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 88%.

GRANDEUR: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)30%
Plinth100%
Stilt Floor50%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.63%

Progress on shared amenities15

As on 4 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered180
Open Space8

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,843 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
S R DEVELOPERSBorivaliMumbai Suburban
M/S PALEKAR DEVELOPERBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI15934.89
Proposed, not sanctioned8,082 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDAHISAR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHANTANOO RANE & ASSOCIATES
EngineerJAYESH R RATHOD
Chartered AccountantAKSHAY KIRTIKUMAR & ASSOCIATES
PartnerRole in project
SUNRISE ASSOCIATES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009291Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO CHANGES IN RULES AND REGULATIONS AS PER DCPR 2034 AND ITS GUIDELINES/ CIRCULARS ISSUED THEREOF, THE PROJECT WAS NOT ABLE TO BE COMPLETED ON TIME. SO WE WOULD REQUEST YOU TO FURTHER GRANT US EXTENSION OF 12 MONTHS AT EARLIEST.

EXT51800013213Jun 2021 → Dec 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/12/2024

EXT51800027389Jun 2021 → Dec 2025

Reason as filed by the promoterThe main delay started during the COVID period which the entire world has witnessed. After which securing consistent labourers became a significant challenge in the real estate industry After the labour issue got partly resolved, we started then the project again but again in half of the midway we required some further approvals from the various concerned authorities due to change in regulations that were not applicable in our earlier approvals which took roughly around a year or so. The project is now almost nearing completion and we need extension to comply and fulfil requirements required t

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502441Ashok Mali and Aarti Ashok MaliSUNRISE ASSOCIATES17/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 May 2025

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Other - Technical (8).pdf4 May 2025
Other - TechnicalFile: OC.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory.pdf11 Apr 2025
Certificates of CA (Form 3)File: form 3 Dec 24 (4).pdf7 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 24.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 24.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 24.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf25 Mar 2025
Declaration in FORM BFile: Affidavit cum decleration.pdf4 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sunrise Feb-2025 TUSHAR SUTHAR (1).pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Grandeur-1 on Feb-2025 (1).pdf3 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Grandeur Feb 25 (1).pdf3 Mar 2025
Layout approvalFile: 9 Jumbo_1-1.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_2-2.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_3-3.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_4-4.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_5-5.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_6-6.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_7-7.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_8-8.pdf20 Oct 2023
Layout approvalFile: 9 Jumbo_9-end.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_1-1.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_2-2.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_3-3.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_4-4.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_5-5.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_6-6.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_7-7.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_8-8.pdf20 Oct 2023
Copy of Layout Approval (in case of layout)File: 9 Jumbo_9-end.pdf20 Oct 2023
Certificates of CA (Form 3)File: FORM 3.pdf9 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLDBOOK INVENTORY.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archtiect form 1 grandure.pdf4 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer form 2A 21-22.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf3 Jan 2023
Declaration about Commencement CertificateFile: CC Covering Letter (Format D).pdf30 Dec 2022
CERSAI detailsFile: Cersai Declaration.pdf30 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 10 21.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 01 22.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 04 22.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 07 22.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 10 22.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march.pdf6 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 june.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A march.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A june.pdf6 Aug 2021
Certificates of CA (Form 5)File: Form 5 (18-19).pdf12 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (18-19).pdf12 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (19-20).pdf12 Mar 2021
Certificates of CA (Form 3)File: SIGNED CA CERTIFICATE (6).pdf11 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER CERTIFICATE.pdf29 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1_compressed.pdf13 Jan 2021
Certificates of CA (Form 3)File: December 2017 dt 01082019.pdf2 Aug 2019
Certificates of CA (Form 3)File: March 2018 dt 01082019.pdf2 Aug 2019
Certificates of CA (Form 3)File: June 2018 dt 01082019.pdf2 Aug 2019
Certificates of CA (Form 3)File: September 2018 dt 01082019.pdf2 Aug 2019
Certificates of CA (Form 3)File: December 2018 dt 01082019.pdf2 Aug 2019
Certificates of CA (Form 3)File: March 2019 dt 01082019.pdf2 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 30122018.pdf16 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 31032019.pdf16 Jul 2019
Proforma of Allotment letterFile: corrrected SUNRISE Agreement for Sale.pdf3 Dec 2018
Certificates of CA (Form 5)File: Grandeur Form 5.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 30092018.pdf12 Oct 2018
Proforma of Allotment letterFile: Allotment Letter.pdf21 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 30122017.pdf27 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 30032018.pdf27 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 27102017.pdf10 Apr 2018
Proforma of Allotment letterFile: SUNRISE Agreement for sale.pdf24 Jan 2018
Proforma of Allotment letterFile: PALEKAR and SUNRISE agreement for sale.pdf3 Jan 2018
Certificates of CA (Form 3)File: final qurter ca.pdf20 Dec 2017
Building plan approvalFile: iod.pdf30 Jul 2017
Layout approvalFile: layout.pdf30 Jul 2017
Copy of the legal title reportFile: title new-1-6.pdf30 Jul 2017
Copy of the legal title reportFile: title new-7-12.pdf30 Jul 2017
Details of encumbrancesFile: NO ENCUMBARANCE.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: layout.pdf30 Jul 2017
Building Plan Approval (IOD)File: iod.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf30 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 54 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GRANDEUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmGRANDEURCompleted 78Lapsed / revoked 53Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 255 registered projects within 2 km.

Builder: SUNRISE ASSOCIATES

Sunrise Associates has 2 registrations on MahaRERA, including SPRING DALE and GRANDEUR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that GRANDEUR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GRANDEUR is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GRANDEUR?

The registered promoter entity is SUNRISE ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GRANDEUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GRANDEUR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GRANDEUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GRANDEUR?

The professionals named in the filing: Architect: SHANTANOO RANE & ASSOCIATES; Engineer: JAYESH R RATHOD; Chartered Accountant: AKSHAY KIRTIKUMAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GRANDEUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GRANDEUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GRANDEUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.