Home / Browse projects / Amravati, Maharashtra / GOVINDA ARCADE

Registered No litigation declared Commercial project

GOVINDA ARCADE

By STEELARROW COMMERCIAL LLP

RG-MH-15823 · RERA P50300076787 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
9 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 90%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

GOVINDA ARCADE is a Commercial project by STEELARROW COMMERCIAL LLP in Amravati, Maharashtra, registered with MahaRERA as P50300076787 on 28 Jun 2024. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameGOVINDA ARCADE
  • TypeCommercial
  • Location
    • NATIONAL HIGHWAY 6
    • BORGAON DHARMALE
    • Nandgaon peth
    • Amravati
    • 444901
  • Pincode444901
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300076787
  • ReraGenie IDRG-MH-15823

Builder

  • NameSTEELARROW COMMERCIAL LLP
  • Entity typePartnership
  • GSTIN27AFGFS8596A1ZL
  • PartnersSUBHASH NANAKRAM TALDA, SHANKAR GURBOMAL HARWANI

Key dates

this monthRegisteredJun 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA30000
A2NA30000
A3NA30000
A4NA30000
A5NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 90%.

A132%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A230%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor35%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A328%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor25%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A49%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A59%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed357

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots357
Open Space357
BuildingOpen SpaceTotal
A1100100
A26868
A33737
A45252
A5100100

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,559 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTAHSILDAR AMRAVATI
Permissible FSI11679.66
Proposed, not sanctioned11,680 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPMC BUILDING OLD COTTON MARKET MALVIYA CHOWK AMRAVATI 444601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH CHANDAK
EngineerPANKAJ VINODKUMAR BAJAJ
Chartered AccountantCA DEEPAK ZAMBANI GAD AND ASSOCIATES
PartnerRole in project
STEELARROW COMMERCIAL LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: GOVINDA ARCADE ARC CERF_Q4 25-26.pdf27 May 2026
Form 2File: GOVINDA ARCADE ENG CERF_Q4 25-26.pdf27 May 2026
Form 3File: GOVINDA ARCADE CA CERF_Q4 25-26.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: GOVINDA ARCADE Sold Unsold INVENTORY_Q4 25-26.pdf27 May 2026
Form 1File: GOVINDA ARCADE ARC CERF_Q3 25-26.pdf27 Feb 2026
Form 2File: GOVINDA ARCADE ENG CERF_Q3 25-26.pdf27 Feb 2026
Form 3File: GOVINDA ARCADE CA CERF_Q3 25-26_compressed.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: GOVINDA ARCADE INVENTORY_Q3 25-26.pdf27 Feb 2026
Form 1File: GOVINDA ARCADE ARC CERF_Q2 25-26.pdf13 Nov 2025
Form 2File: GOVINDA ARCADE ENG CERF_Q2 25-26.pdf13 Nov 2025
Form 3File: GOVINDA ARCADE CA CERF_Q2 25-26.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: GOVINDA ARCADE INVENTORY_Q2 25-26.pdf13 Nov 2025
Form 1File: Steel_Form 1_300624.pdf20 Aug 2025
Form 2File: Steelarrow Cityland ENG CERTFICATE_Form 2 Q1 24-25.pdf20 Aug 2025
Form 3File: Steel_Form 3_300624.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Steel_Soldunsold_300624.pdf20 Aug 2025
Form 1File: Steelarrow Cityland ARC CERTFICATE_Form 1 Q2 24-25.pdf20 Aug 2025
Form 2File: Steelarrow Cityland ENG CERTFICATE_Form 2 Q2 24-25.pdf20 Aug 2025
Form 3File: Steelarrow Cityland CA CERTFICATE_Form 3 Q2 24-25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Steelarrow Cityland SOLD UNSOLD INVENTORY _Q2_24-25.pdf20 Aug 2025
Form 1File: Steelarrow Cityland ARC CERTFICATE_Form 1 Q3 24-25.pdf20 Aug 2025
Form 2File: Steelarrow Cityland Eng CERTFICATE_Form 1 Q3 24-25.pdf20 Aug 2025
Form 3File: Steelarrow Cityland CA CERTFICATE_Form 3 Q3 24-25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Steelarrow Cityland SOLD UNSOLD INVENTORY _Q3_24-25.pdf20 Aug 2025
Form 1File: Steelarrow Cityland ARC CERTFICATE_Form 1 Q4 24-25.pdf20 Aug 2025
Form 2File: Steelarrow Cityland Eng CERTFICATE_Form 1 Q4 24-25.pdf20 Aug 2025
Form 3File: Steelarrow Cityland CA CERTFICATE_Form 3 Q4 24-25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Steelarrow Cityland SOLD UNSOLD INVENTORY _Q4_24-25.pdf20 Aug 2025
Form 1File: GOVINDA ARCADE ARC CERF.pdf20 Aug 2025
Form 2File: GOVINDA ARCADE ENG CERF.pdf20 Aug 2025
Form 3File: GOVINDA ARCADE CA CERF.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: GOVINDA ARCADE INVENTORY.pdf20 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Steelarrow Cityland ARC CERTFICATE_Form 1 Q4 24-25.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Steelarrow Cityland CA CERTFICATE_Form 3 Q4 24-25.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Steelarrow Cityland Eng CERTFICATE_Form 1 Q4 24-25.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Steelarrow Cityland SOLD UNSOLD INVENTORY _Q4_24-25.pdf26 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Steelarrow Cityland Quality Assurance Cert Q4 24-25.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Steelarrow Cityland ARC CERTFICATE_Form 1 Q3 24-25.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Steelarrow Cityland CA CERTFICATE_Form 3 Q3 24-25.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Steelarrow Cityland Eng CERTFICATE_Form 1 Q3 24-25.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: Steelarrow Cityland SOLD UNSOLD INVENTORY _Q3_24-25.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Steelarrow Cityland ARC CERTFICATE_Form 1 Q2 24-25.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Steelarrow Cityland CA CERTFICATE_Form 3 Q2 24-25.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Steelarrow Cityland ENG CERTFICATE_Form 2 Q2 24-25.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Steelarrow Cityland SOLD UNSOLD INVENTORY _Q2_24-25.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Steel_Form 1_300624.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Steelarrow Cityland ENG CERTFICATE_Form 2 Q1 24-25_compressed.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Steel_Soldunsold_300624.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Steel_Form 3_300624.pdf16 Jul 2024
CERSAI detailsFile: Steel_Cersai 060624.pdf6 Jun 2024
Layout approvalFile: Steel_NA Order.pdf31 May 2024
Building plan approvalFile: Steel_Sanction Map 1.pdf31 May 2024
Building plan approvalFile: Steel_Sanction Map 2.pdf31 May 2024
Copy of the legal title reportFile: Steel Arrow_Search Report 300524.pdf31 May 2024
Details of encumbrances concerned to FinanceFile: Steel Arrow_Encumberance.pdf31 May 2024
Details of encumbrances concerned to LegalFile: Steel Arrow_Encumberance.pdf31 May 2024
Copy of Layout Approval (in case of layout)File: Steel_NA Order.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Steel_Sanction Map 1.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Steel_Sanction Map 2.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Steel_Commencement Certificate.pdf31 May 2024
Declaration about Commencement CertificateFile: Steel Arrow_CC declaration.pdf31 May 2024
Declaration in FORM BFile: Steel Arrow_Form B.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Steel_Form 3.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Steel Arrow_Other Disclosure Subhash.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Steel Arrow_Shankar Harwani.pdf31 May 2024
Proforma of Agreement for saleFile: Steel Arrow_ATS.pdf31 May 2024
Proforma of Allotment letterFile: Steel_Allotment.pdf31 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Steel Arrow_Bank format.pdf31 May 2024
Deviation Report with respect to Allotment letterFile: Steel Arrow_Deviation Allotment.pdf31 May 2024
Deviation Report with respect to model copy of AgreementFile: Steel Arrow_Deviation AFS.pdf31 May 2024
Other - LegalFile: Steel_Purchase Deed 310524.pdf31 May 2024
Other - FinanceFile: Steel Arrow_LLP Agreement.pdf31 May 2024
Other - TechnicalFile: Steel Arrow_OPOR.pdf31 May 2024
Other - TechnicalFile: Steel Arrow_Mail.pdf31 May 2024
PAN CardFile: Steel Arrow_PAN Card.pdf8 May 2024
Other - LegalFile: Steel Arrow_LLP Agreement.pdf8 May 2024
Other - LegalFile: Steel Arrow_LLP Certificate.pdf8 May 2024
Other - FinanceFile: Steel Arrow_LLP Certificate.pdf8 May 2024

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep GOVINDA ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORGAON DHARMALE450+ in Amravati

2 kmGOVINDA ARCADECompleted 3Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: STEELARROW COMMERCIAL LLP

STEELARROW COMMERCIAL LLP has 1 registration on MahaRERA, including GOVINDA ARCADE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if GOVINDA ARCADE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOVINDA ARCADE?

The registered promoter entity is STEELARROW COMMERCIAL LLP, a partnership as per the filing. Its GSTIN 27AFGFS8596A1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOVINDA ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOVINDA ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOVINDA ARCADE?

The professionals named in the filing: Architect: PRAKASH CHANDAK; Engineer: PANKAJ VINODKUMAR BAJAJ; Chartered Accountant: CA DEEPAK ZAMBANI GAD AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOVINDA ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOVINDA ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOVINDA ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.