Home / Browse projects / Pune, Maharashtra / GOVIND BASIL
GOVIND BASIL
RG-MH-75106 · RERA P52100019649 · Last updated on MahaRERA portal: 24 Jan 2022
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOVIND BASIL is a Residential / Group Housing project by SHREE SADGURU DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100019649 on 20 Feb 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.
At a glance
Project
- NameGOVIND BASIL
- TypeResidential / Group Housing
- Location
- DATTNAGAR AMBEGAON ROAD
- DATTANAGAR
- AMBEGAON KH
- Haveli
- Pune
- 411046
- Pincode411046
- RERA no.P52100019649
- ReraGenie IDRG-MH-75106
Builder
- NameSHREE SADGURU DEVELOPERS
- Entity typePartnership
- GSTIN27ADJFS2396D2ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerVIKAS KHANDU HAJARE
- Other registrations8 more →
- Completed4 of 9
- No longer live2 lapsed, de-registered or revoked
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on20 Feb 2019
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings4 building records
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A1 | NA | 15 | 0 | 0 | 0 | 0 |
| WING A2 | NA | 15 | 0 | 0 | 0 | 0 |
| WING B | NA | 15 | 0 | 0 | 0 | 0 |
| WING C | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 24 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
32 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.
WING A191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING A291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities17
As on 24 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 99% |
| Water Supply | Yes | 99% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 99% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 99% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 99% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| PUMP ROOM UNDER GROUNDWATER TANK | Yes | 100% |
| COMPUND WALL | Yes | 99% |
Parking filed95
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A1 | 12 | 0 | 12 |
| WING A2 | 14 | 13 | 27 |
| WING B | 28 | 0 | 28 |
| WING C | 28 | 0 | 28 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| GOGAWALE DATTATRAY GOVINDRAO | AMBEGAON KH | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | IMRAN SHAIKH |
| Engineer | BRICKLANE |
| Engineer | RATHI |
| Chartered Accountant | TANAJI CHORGHE |
| Partner | Role in project |
|---|---|
| SHREE SADGURU DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Jan 2022
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PMC Completion Certificate_compressed.pdf | 24 Jan 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Soceity registeration certificates_compressed.pdf | 24 Jan 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Complition certificate.pdf | 7 Jan 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1234567-converted-compressed.pdf | 21 Oct 2021 |
| Certificates of CA (Form 3)File: CA Certificate Sept 21.pdf | 20 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7th Engineer Certificate of Govind Basil (30-09-2021).pdf | 19 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificates.pdf | 18 Oct 2021 |
| OtherFile: PDCC Bank Account open.pdf | 18 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech certificate_compressed.pdf | 27 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 27 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Cer_compressed.pdf | 27 Jul 2021 |
| Certificates of CA (Form 3)File: CA Certificate June 2021_compressed.pdf | 27 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Booking Inventory All Flat.pdf | 14 Jun 2021 |
| OtherFile: Club house sanction.pdf | 10 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cer_compressed.pdf | 22 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7th Engineer Certificate of Govind Basil.pdf | 22 Apr 2021 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 22 Apr 2021 |
| Layout approvalFile: Temp00057-converted-compressed.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Temp00057-converted-compressed.pdf | 3 Feb 2021 |
| Building plan approvalFile: Plan Copy_compressed.pdf | 2 Feb 2021 |
| Building Plan Approval (IOD)File: Plan Copy_compressed.pdf | 2 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate compressed.pdf | 2 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form1_compressed.pdf | 25 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_compressed.pdf | 25 Jan 2021 |
| Form 2AFile: Quality Assurance Cer_compressed.pdf | 25 Jan 2021 |
| Certificates of CA (Form 3)File: Shree Sadguru Form 3_compressed.pdf | 25 Jan 2021 |
| Layout approvalFile: Scan_7989-01 (1).pdf | 19 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: Scan_7989-01 (1).pdf | 19 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: doc03222320210114203353 (1).pdf | 19 Jan 2021 |
| OtherFile: Supplemental Agreement 1a.pdf | 9 Jan 2021 |
| OtherFile: Supplemental Agreement 2a.pdf | 9 Jan 2021 |
| OtherFile: Amol Sawant Kulmukhtyarpatra.pdf | 5 Dec 2020 |
| OtherFile: Vatni Patra_compressed.pdf | 5 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cer_compressed.pdf | 14 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cer_compressed.pdf | 14 Oct 2020 |
| Form 2AFile: Quality Cer.pdf | 14 Oct 2020 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 14 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate.pdf | 1 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate of Govind Basil _1.pdf | 1 Aug 2020 |
| Certificates of CA (Form 3)File: CA Certificate QTR 30 June 2020_1.pdf | 1 Aug 2020 |
| Form 2AFile: Form 2A.pdf | 21 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FY 2017-18.pdf | 16 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_new.pdf | 16 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf | 6 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 6 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 6 Nov 2019 |
| Certificates of CA (Form 3)File: Ca Certificate new.pdf | 6 Nov 2019 |
| OtherFile: Shahu bank Repayment details.pdf | 6 Nov 2019 |
| Proforma of Allotment letterFile: DRAFT.pdf | 6 Aug 2019 |
| Certificates of CA (Form 3)File: CA Certificate 1MB.pdf | 5 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate updated.pdf | 4 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate updated.pdf | 4 Jul 2019 |
| Form 2AFile: Quality Assurance Certificate.pdf | 4 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archictes Certificates.pdf | 13 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE MARCH 2019.pdf | 13 May 2019 |
| Declaration in FORM BFile: Annexure B.pdf | 12 Feb 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 28 Jan 2019 |
| Building plan approvalFile: Wing A1 Building Plan.pdf | 15 Jan 2019 |
| Building plan approvalFile: Wing A2 Building Plan.pdf | 15 Jan 2019 |
| Building plan approvalFile: Wing B Building Plan.pdf | 15 Jan 2019 |
| Layout approvalFile: Parking Plan.pdf | 15 Jan 2019 |
| Details of encumbrancesFile: NA Order.pdf | 15 Jan 2019 |
| Copy of Layout Approval (in case of layout)File: Parking Plan.pdf | 15 Jan 2019 |
| Building Plan Approval (IOD)File: Wing A1 Building Plan.pdf | 15 Jan 2019 |
| Building Plan Approval (IOD)File: Wing A2 Building Plan.pdf | 15 Jan 2019 |
| Building Plan Approval (IOD)File: Wing B Building Plan.pdf | 15 Jan 2019 |
| Proforma of Allotment letterFile: Agreement Draft.pdf | 15 Jan 2019 |
| PAN CardFile: PAN Firm.pdf | 8 Jan 2019 |
| Copy of the legal title reportFile: Search And Title Report.pdf | 8 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 Jan 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep GOVIND BASIL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DATTANAGAR13,700+ in Pune
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: SHREE SADGURU DEVELOPERS
SHREE SADGURU DEVELOPERS has 9 registrations on MahaRERA, including EKNATH RESIDENCY and HIRALAXMI APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GOVIND BASIL is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOVIND BASIL?
The registered promoter entity is SHREE SADGURU DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADJFS2396D2ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOVIND BASIL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOVIND BASIL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOVIND BASIL?
The professionals named in the filing: Architect: IMRAN SHAIKH; Engineer: BRICKLANE; Engineer: RATHI; Chartered Accountant: TANAJI CHORGHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOVIND BASIL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback