Home / Browse projects / Mumbai Suburban, Maharashtra / GOMANT KUTIR CHSL
GOMANT KUTIR CHSL
RG-MH-05961 · RERA P51800052397 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
- Rs 8.50 crore secured on the land, in favour of ADITYA BIRLA CAPITAL
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOMANT KUTIR CHSL is a Others project by JBR HOUSECON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052397 on 21 Aug 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 47 of the 87 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameGOMANT KUTIR CHSL
- TypeOthers
- Location
- AT RAMKUNWAR THAKUR ROAD
- DAHISAR EAST
- Dahisar
- Borivali
- Mumbai Suburban
- 400068
- Pincode400068
- RERA no.P51800052397
- ReraGenie IDRG-MH-05961
Builder
- NameJBR HOUSECON LLP
- Entity typePartnership
- PartnersJITEN HASMUKH DEDHIYA, RAJESH AASDHIR NISAR
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Aug 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed78 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GOMANT KUTIR CHSL - A WING | NA | 14 | 14 | 36 | 11 | 47 |
| GOMANT KUTIR CHSL - B WING | NA | 14 | 14 | 39 | 1 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
GOMANT KUTIR CHSL - A WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
GOMANT KUTIR CHSL - B WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| GOMANT KUTIR CHSL - A WING | 28 | 28 |
| GOMANT KUTIR CHSL - B WING | 38 | 38 |
Land and ownership2
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| GOMANT KUTIR A BUILDING C.H.S.L | Dahisar | Mumbai Suburban |
| GOMANT KUTIR B BUILDING C.H.S.L | Dahisar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GOMANT KUTIR CHSL - A WING | NA | Rs 9.35 cr | Rs 8.50 cr |
| GOMANT KUTIR CHSL - B WING | NA | Rs 9.35 cr | Rs 8.50 cr |
| - | NA | Rs 3.30 cr | Rs 2.06 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MEHUL KANAKIA |
| Engineer | Amit Sudam Naik |
| Engineer | BAHVESH PARMAR |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | ROHAN GANDHI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| JBR HOUSECON LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAlthough the project is in its final stage and substantial progress has been achieved, certain external and operational factors have marginally affected the final completion schedule. The primary considerations are as under: 1. Extended monsoon period in the recent season, which caused temporary disruption in the Car Parking Tower works and external finishing activities. 2. Restricted working access behind B-Wing, resulting in slower progress of the remaining site operations. In order to ensure full compliance with statutory requirements and MahaRERA timelines, and to avoid any technical non-c
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A Certificate (1).pdf | 17 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5 JBR Housecon LLP.pdf | 17 Jul 2026 |
| Occupational CertificateFile: GK - Occupation Certificate.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: GK - Form 3.pdf | 14 Jul 2026 |
| Withdrawal Update Form 1File: GK RERA Architect Certificate 01 04 26.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: GK Engineer Certificate 31 03 2026.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: GK CA Certificate Oct Dec 25 07 01 26.pdf | 22 Apr 2026 |
| Layout approvalFile: GK - Approved plan_1-2.pdf | 14 Feb 2026 |
| Layout approvalFile: GK - Approved plan_3-5.pdf | 14 Feb 2026 |
| Layout approvalFile: GK - Approved plan_6-end.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: GK Archi Certi Oct Dec 25 02 01 26.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: G K Engineer Certificate 31 12 2025.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: GK CA Certificate Oct Dec 25 07 01 26.pdf | 6 Feb 2026 |
| Withdrawal Update Form 1File: GK - Architech form 1 for July-Sept 25.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Gomant Kutir form2.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: Signed CA Certificate-Gomant Kutir JBR housecon sept 25.pdf | 27 Oct 2025 |
| Form 2A (FY 2024-2025)File: GK - 2A Site Supervisor April 2025 (1).pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: JBR HOusecon llp Form 5.pdf | 30 Sep 2025 |
| Commencement certificateFile: GK full CC.pdf | 25 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GK - Architect Certificate Jan to March 2025.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK - CA Certificate Form 3 Jan to March 2025.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GK - Engineer Certificate March 2025.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GK - Form 1 Architect Certificate.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GK - Form 3 CA Certificate.pdf | 13 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2447897_FurtherCC_signed.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Foarm 3.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Foarm 5_compressed.pdf | 18 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Gomant Kutir Further CC.pdf | 31 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architects Gomant Kutir.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 15 Jul 2024 |
| Proforma of Agreement for saleFile: GK - Draft Sale Agreement 2.pdf | 15 Jun 2024 |
| Proforma of Agreement for saleFile: GK - Draft Sale Agreement.pdf | 3 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: GK - RERA Encumbrance Letter (Construction Funding).pdf | 31 May 2024 |
| Details of encumbrances concerned to LegalFile: GK - RERA Encumbrance Letter (Construction Funding).pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: inventory disclosure format (New).pdf | 10 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architects.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf | 10 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf | 10 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2418844_FurtherCC_signed.pdf | 19 Mar 2024 |
| Layout approvalFile: GK - Concession Drawing_1-4.pdf | 16 Feb 2024 |
| Layout approvalFile: GK - Concession Drawing_5-end.pdf | 16 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: GK - Concession Drawing_1-4.pdf | 16 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: GK - Concession Drawing_5-end.pdf | 16 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1.pdf | 6 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OCT DEC 23.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Re Signed CA Certificate-Gomant Kutir JBR housecon sep'23.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Signed CA Certificate-Gomant Kutir JBR housecon sep'23.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: inventory disclosure format (CA).pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate.pdf | 7 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2398695_FirstCC_signed.pdf | 27 Oct 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (1).pdf | 30 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation agreement.PDF | 30 Jun 2023 |
| Proforma of Allotment letterFile: RESIDENTIAL ALLOTMENT LETTER.pdf | 23 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: GK - RERA - No Deviation Letter (Allotment Format).PDF | 23 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: GK_FirstCC_signed.pdf | 22 Jun 2023 |
| Declaration about Commencement CertificateFile: CC COVERING LETTER.PDF | 22 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE NEW.pdf | 21 Jun 2023 |
| Layout approvalFile: approved plans (1).pdf | 17 Jun 2023 |
| Copy of the legal title reportFile: GK - Title Report by Sanjay Pandya (1).PDF | 17 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: approved plans (1).pdf | 17 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf | 14 Jun 2023 |
| Building plan approvalFile: iod.pdf | 30 May 2023 |
| PAN CardFile: JBR Housecon LLP.pdf | 30 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: iod.pdf | 30 May 2023 |
| Details of encumbrances concerned to FinanceFile: GK - No encumbrance.pdf | 25 May 2023 |
| Details of encumbrances concerned to LegalFile: GK - No encumbrance.pdf | 25 May 2023 |
| Declaration in FORM BFile: form b.pdf | 25 May 2023 |
| CERSAI detailsFile: GK - Cersai Declaration.pdf | 25 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: GK - Bank Account Letter.pdf | 25 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 78 filed documents as one ZIP, foldered, with a manifest
Keep GOMANT KUTIR CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAHISAR EAST6,700+ in Mumbai Suburban
ICON
RAGHU LEELA REALTORS PRIVATE LIMITED
ORNATE SOLITAIRE
ORNATE DAHISAR DEVELOPERS
EMPIRE HEIGHTS
EMPIRE REALTY
SHAKTI DHAM-WING A, VRINDAVAN-WING B RESIDENTI
DHARTI DEVELOPERS
RAGHUKUL CHSL
RAMNIYATI REALITIES LLP
Earth Residency Wing C and Wing D
Earth Estate Developers Pvt Ltd
See every Mumbai Suburban project, with the district possession charts
Builder: JBR HOUSECON LLP
JBR HOUSECON LLP has 1 registration on MahaRERA, including GOMANT KUTIR CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if GOMANT KUTIR CHSL is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOMANT KUTIR CHSL?
The registered promoter entity is JBR HOUSECON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOMANT KUTIR CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOMANT KUTIR CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOMANT KUTIR CHSL?
The professionals named in the filing: Architect: MEHUL KANAKIA; Engineer: Amit Sudam Naik; Engineer: BAHVESH PARMAR; Chartered Accountant: NEHALI & CO; Chartered Accountant: ROHAN GANDHI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOMANT KUTIR CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback