ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / GOLOK DHAM

Completed No litigation declared Others project

GOLOK DHAM

By Shakti Lifespaces Pvt Ltd

RG-MH-55980 · RERA P51500033289 · Last updated on MahaRERA portal: 3 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
28 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

GOLOK DHAM is a Others project by Shakti Lifespaces Pvt Ltd in Aurangabad, Maharashtra, registered with MahaRERA as P51500033289 on 15 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2027.

At a glance

Project

  • NameGOLOK DHAM
  • TypeOthers
  • Location
    • Jalna Road
    • Warud Kazi
    • Warud
    • Aurangabad
    • 431154
  • Pincode431154
  • RERA no.P51500033289
  • ReraGenie IDRG-MH-55980

Builder

  • NameShakti Lifespaces Pvt Ltd
  • Entity typeCompany
  • GSTIN27AAGCC6521K1ZJ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorRajesh Kamalnayan Bharuka
  • DirectorsShyam Trilok Agrawal, Archit Sushil Bharuka, Vijay Goyal
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2022PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Type Row House Block INA30000
A Type Row House Block IINA30000
B Type BuildingNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A Type Row House Block I82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A Type Row House Block II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Type Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered53

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,801 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19856.6
Proposed, not sanctioned19,857 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChikalthana Aurangabad

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEthque Architect and Associates
EngineerShriniwas Karanjikar
Chartered AccountantNarendra Navandar & Co
PartnerRole in project
Shakti Lifespaces Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Nov 2024

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5_GOLOK DHAM_Mar2024.pdf3 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT'S CERTIFICATE.pdf27 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: GD Association Certificate.pdf27 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GOLOK DHAM FULL OCCUPANCY CERTIFICATE FINAL.pdf27 Nov 2024
Disclosure of sold/ booked inventoryFile: June-2024 Q1 - converted.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GD JUNE-24 Form 1 - Architect's Certificate.pdf14 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GD June-24 GD 2 Form 2 - Engineer's Certificate.pdf14 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GD June-24 New Foemat Form - 2A.pdf14 Jul 2024
Disclosure of sold/ booked inventoryFile: GOLOK DHAM 30-09-2023 - converted.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: GOLOK DHAM 31-12-2023 - converted.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: GD Mar-24 Discloser - converted (1).pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar-24 GD ARCH CERTIFICATE.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR-24 GD ENGINEER CERTIFICATE.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MAR-24 GD SITE SUPERVISOR.pdf27 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Documnets .pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GD Arch Cer Q-3.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GD Engineer's Certificate.pdf31 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GD Supervisor's Certificate.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golok Dham 30-06-2023_0001.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GD Architect Certeficate Sept-23.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GD Engineer Certificate Sept-23.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GD Supervisor Certificate Sept-23.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GD Architect Certificate June-23.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GD Engineer Certificate June-23.pdf25 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GD Superwisor Certificate June-23.pdf25 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSUR JUNE-2023.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GD Architect Certificate Mar-23.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GD Engineer Certificate Mar-23(1).pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GD Supervisor Certificate march-23.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSUR MARCH 2022.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSUR JUNE-2022.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSUR SEPT 2022.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSUR DEC-2022.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSUR MARCH 2023.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golok Dham 31-03-2022_0001.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golok Dham 30-06-2022_0001.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golok Dham 30-09-2022_0001.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golok Dham 31-12-2022_0001.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golok Dham 31-03-2023_0001.pdf21 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec-22.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Dec-22.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site Supervisor Dec-22.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Mar-22.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar-22.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June-22.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sept-22.pdf2 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A MAR 22.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A JUN 22.pdf14 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC JUN 22.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC MAR 22.pdf20 Oct 2022
Details of encumbrancesFile: index 2.pdf15 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Golok Dham.pdf11 Feb 2022
Layout approvalFile: 1 (1).pdf8 Feb 2022
Building plan approvalFile: 1 (1).pdf8 Feb 2022
Building plan approvalFile: 1 (2).pdf8 Feb 2022
Building plan approvalFile: 1 (3).pdf8 Feb 2022
Building plan approvalFile: 1 (4).pdf8 Feb 2022
Building plan approvalFile: 1 (5).pdf8 Feb 2022
Building plan approvalFile: 1 (6).pdf8 Feb 2022
Building plan approvalFile: 1 (7).pdf8 Feb 2022
Building plan approvalFile: 1 (8).pdf8 Feb 2022
PAN CardFile: Credence Pan Card.pdf8 Feb 2022
Copy of the legal title reportFile: SEARCH CUM TITLE REPORT (MAHA RERA) CREDENCE (1).pdf8 Feb 2022
Details of encumbrancesFile: NON ENCUMBRANCE.pdf8 Feb 2022
Copy of Layout Approval (in case of layout)File: 1 (1).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (1).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (2).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (3).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (4).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (5).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (6).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (7).pdf8 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 (8).pdf8 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: REV BP ORDER.pdf8 Feb 2022
Declaration about Commencement CertificateFile: DECLERATION.pdf8 Feb 2022
Declaration in FORM BFile: FORM B.pdf8 Feb 2022
CERSAI detailsFile: Asset Based Search.pdf8 Feb 2022
CERSAI detailsFile: UNDERTAKING.pdf8 Feb 2022
Proforma of Allotment letterFile: AFS.pdf8 Feb 2022

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep GOLOK DHAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Warud Kazi1,400+ in Aurangabad

Builder: Shakti Lifespaces Pvt Ltd

Shakti Lifespaces Pvt Ltd has 5 registrations on MahaRERA, including GOLOK DHAM and Happy Homes Happy Street Wing B. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if GOLOK DHAM is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLOK DHAM?

The registered promoter entity is Shakti Lifespaces Pvt Ltd, a company as per the filing. Its GSTIN 27AAGCC6521K1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLOK DHAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLOK DHAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLOK DHAM?

The professionals named in the filing: Architect: Ethque Architect and Associates; Engineer: Shriniwas Karanjikar; Chartered Accountant: Narendra Navandar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLOK DHAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLOK DHAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLOK DHAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.