Home / Browse projects / Ahmednagar, Maharashtra / GOLDEN LEAF

Completed No litigation declared Residential / Group Housing project

GOLDEN LEAF

By GAURAV VISHWANATH AWATI

RG-MH-65276 · RERA P52200049448 · Last updated on MahaRERA portal: 5 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Nov 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
17 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

GOLDEN LEAF is a Residential / Group Housing project by GAURAV VISHWANATH AWATI in Ahmednagar, Maharashtra, registered with MahaRERA as P52200049448 on 14 Feb 2023. The registration is recorded completed; possession was promised by 1 Nov 2024. 7 of the 24 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameGOLDEN LEAF
  • TypeResidential / Group Housing
  • Location
    • KALARAM MANDIR ROAD
    • WARD NO. 7
    • Shrirampur (M Cl)
    • Shrirampur
    • Ahmednagar
    • 413709
  • Pincode413709
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52200049448
  • ReraGenie IDRG-MH-65276

Builder

  • NameGAURAV VISHWANATH AWATI
  • Entity typeIndividual
  • GSTIN27BHSPA7427H1Z3
  • Other registrations9 more →
  • Completed9 of 10
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2023PromisedNov 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Feb 2023
  • Promised completion1 Nov 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed48 files

Current status

29%7 of 24 units booked
95.8%Work done, per cost certificate

Figures as on 5 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOLDEN LEAFNA7020424

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GOLDEN LEAF: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered1
Open Space17

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,236 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on25 Sep 2024
LandownerVillageDistrict
MRS. SAJEDA ISAHAK SHAIKHShrirampur (M Cl)Ahmednagar

Approvals and building plan

Sanctioning authoritySHRIRAMPUR MUNCIPAL COUNCILE
Permissible FSI2852.63
Proposed, not sanctioned2,853 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGAMNER ROAD, SHRIRAMPUR
Estimated costRs 3.22 cr
Cost incurredRs 3.08 cr
Work done95.83%
BuildingWingEstimatedIncurred
GOLDEN LEAFNARs 3.00 crRs 2.90 cr
-NARs 21.80 lakhRs 18.70 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDIP NANDKUMAR LOLGE
ArchitectSANDIP LOLAGE
EngineerSAMARTH SONAWANE
Chartered AccountantSUVIDYA SOMANI
Chartered AccountantSUVIDYA SUVIJAY SOMANI
Chartered AccountantPOOJA PRADEEP CHALLANI
PartnerRole in project
GAURAV VISHVANATH AWATI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 May 2024

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: 1972A GOLDEN LEAF.pdf5 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 GOLDEN LEAF.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 golden leaf 2022-23_compressed.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_JAN24_MAR24_GOLDEN_LEAF.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_JAN24_MAR24_GOLDEN_LEAF.pdf30 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL_OCCUPANCY_GOLDEN_LEAF.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golden April June.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Golden Ar 1.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Golden Ar 2.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Golden Ar 3.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Golden Ar 4.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Golden Er 1.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Golden Er 2.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Golden Er 3.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Golden Er 4.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golden April June.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golden Jan Mar.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golden July Sep.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Golden Oct Dec.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GOLDEN LEAF.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GOLDEN LEAF FORM 3 22-23_compressed.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GOLDEN LEAF FORM 5 22-23.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_GOLDEN_LEAF.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM_2A_GOLDEN_LEAF.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_GOLDEN_LEAF.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Golden Leaf 08-02-23_compressed.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2 Golden Leaf.pdf29 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 Golden Leaf New.pdf27 Jan 2023
Copy of the legal title reportFile: Legal Title Report Gloden Leaf latest.pdf26 Jan 2023
Building plan approvalFile: SAJEDA SHAIKH SANCTION PLAN.pdf24 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: SAJEDA SHAIKH SANCTION PLAN.pdf24 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Golden Leaf Disclosure of Real Estate Organization.pdf22 Jan 2023
Proforma of Allotment letterFile: Golden Leaf Model form of Allotment Letter-compressed.pdf22 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Golden Leaf Declaration of Bank Account.pdf22 Jan 2023
Layout approvalFile: Scan 18 Jan 23 · 01·22·34.pdf18 Jan 2023
Copy of Layout Approval (in case of layout)File: Scan 18 Jan 23 · 01·22·34.pdf18 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Golden Leaf Deviation Agreement to sale.pdf18 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257732135_For_Asset_Based_Search_17_01_2023_13_57_29_647.pdf17 Jan 2023
Deviation Report with respect to Allotment letterFile: Golden Leaf Deviation Allotment Letter.pdf17 Jan 2023
Building plan approvalFile: Golden Leaf sanction Plan.pdf14 Jan 2023
PAN CardFile: Gaurav- Pan Card.pdf14 Jan 2023
Details of encumbrances concerned to FinanceFile: Golden Leaf it may concern.pdf14 Jan 2023
Details of encumbrances concerned to LegalFile: Golden Leaf it may concern.pdf14 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Golden Leaf sanction Plan.pdf14 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Golden Leaf Commencement Letter.pdf14 Jan 2023
Declaration about Commencement CertificateFile: Golden Leaf Declaration About Commencement.pdf14 Jan 2023
Declaration in FORM BFile: Form B Gaurav Sir Golden Leaf.pdf14 Jan 2023
Proforma of Agreement for saleFile: GOLDEN LEAF AGREEMENT TO SALE RERA DRAFT.pdf14 Jan 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ATHARVA HEIGHTSNEAR SHELAKE HOSPITAL KANDA MARKET ROAD SHRIRAMPUR-413709.16CompletedOct 2024May 2023
SAI VISHWAGOVIND NAGAR UTSAV MANGAL KARYALAY ROAD WARD NO. 07 SHRIRAMPUR - 41370940CompletedSep 2023Apr 2023
MADHUKOSH HEIGHTSOPP. VIJAY HOTEL WARD NO. 07 SHRIRAMPUR-413709.24CompletedAug 2023Aug 2021
PRIDE PARKNIWARA HOUSING SOCIETY WARD NO. 07 SHRIRAMPUR-413709.32CompletedApr 2023Apr 2022
MADHUBAN APARTMENTNEAR THATTE GROUND16CompletedApr 2021Aug 2019

How this compares with Ahmednagar

29%of this project is bookeddistrict median 10%
7%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is completed

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep GOLDEN LEAF on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WARD NO. 7490+ in Ahmednagar

2 kmGOLDEN LEAFCompleted 14Lapsed / revoked 1Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: GAURAV VISHWANATH AWATI

GAURAV VISHWANATH AWATI has 10 registrations on MahaRERA, including MADHUBANAPARTMENT and MADHUKOSH HEIGHTS. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if GOLDEN LEAF is delayed beyond 1 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN LEAF?

The registered promoter entity is GAURAV VISHWANATH AWATI, an individual as per the filing. Its GSTIN 27BHSPA7427H1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN LEAF?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN LEAF?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN LEAF?

The professionals named in the filing: Architect: SANDIP NANDKUMAR LOLGE; Architect: SANDIP LOLAGE; Engineer: SAMARTH SONAWANE; Chartered Accountant: SUVIDYA SOMANI; Chartered Accountant: SUVIDYA SUVIJAY SOMANI; Chartered Accountant: POOJA PRADEEP CHALLANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN LEAF?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN LEAF. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN LEAF to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.