ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GOLDEN LAKE

Registered No litigation declared Others project

GOLDEN LAKE

By NARSINH ASSOCIATES

RG-MH-68394 · RERA P52100055100 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 9Construction stages donefurthest along: Slabs of Super Structure, 60%
79 of 83Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

GOLDEN LAKE is a Others project by NARSINH ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100055100 on 29 Feb 2024. Possession is promised by 31 Dec 2027. 4 of the 83 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameGOLDEN LAKE
  • TypeOthers
  • Location
    • KATRAJ
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055100
  • ReraGenie IDRG-MH-68394

Builder

  • NameNARSINH ASSOCIATES
  • Entity typePartnership
  • PartnersGANESH BABAN CHAVAN, MANIK BABURAO RAYPHALE, SANJAY SURYAKANT SHITOLE, MANOJ PANDURANG MANDHARE, VILAS BALIRAM GODASE, MANIK GOVIND SAJGANE, RAJESH KRUSHNARAO BARGE, SUMIT RAJENDRA BARGE, VIKAS PRAKASH KALE, DEVIDAS NAMDEV CHAVAN, ATUL BABAN CHAVAN

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Current status

5%4 of 83 units booked
56.8%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOLDEN LAKENA101076783

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

GOLDEN LAKE: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed139

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots139
Closed/Covered139

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
SHIVAJI DHONDIBA VARKHADEKatrajPune
PANDURANG DHONDIBA VARKHADEKatrajPune
GAURISHANKAR GANESH DHANDARPHALESataraSatara
ALKA GAURISHANKAR DHANDARPHALESataraSatara
VIJAY VASANT KULKARNISataraSatara
UMA VIJAY KULKARNISataraSatara
JAYANT CHINTAMANI SABNISSataraSatara
UMA JAYANT SABNISSataraSatara

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI5974.88
Proposed, not sanctioned5,973 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Saraswati Commercial Complex, Pune Satara Road, Balaji nagar, Dhankawadi, pune 411043
Estimated costRs 11.50 cr
Cost incurredRs 6.53 cr
Work done56.78%
BuildingWingEstimatedIncurred
GOLDEN LAKENARs 11.01 crRs 6.53 cr
-NARs 49.50 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUSHIKESH ZAGADE
EngineerMAYUR YELE
Chartered AccountantMILIND PADMAKAR TILWANKAR
Chartered AccountantGANESH PRABHAKAR DHINDLE
PartnerRole in project
NARSINH ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf12 May 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf12 May 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf2 Feb 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf2 Feb 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf24 Nov 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf24 Nov 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf24 Nov 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf18 Jul 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf18 Jul 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf18 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A-2023-24.pdf18 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A-F Y 2024-25.pdf18 Jul 2025
Building plan approvalFile: PLAN 1-5.pdf12 Jul 2025
Building plan approvalFile: PLAN 2-5.pdf12 Jul 2025
Building plan approvalFile: PLAN 3-5.pdf12 Jul 2025
Building plan approvalFile: PLAN 4-5.pdf12 Jul 2025
Building plan approvalFile: PLAN 5-5.pdf12 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5.pdf2 Jul 2025
Form 5 (FY 2024-2025)File: Form 5-2024-25.pdf2 Jul 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf30 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf30 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf30 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE -31-12-2024.pdf30 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE -31-12-2024.pdf30 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE -31-12-2024.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf30 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf30 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf30 Jun 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf30 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATES.pdf30 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf30 Jun 2025
Form 3File: C A Certificate.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf30 Jun 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATES.pdf30 Jun 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf30 Jun 2025
Form 3File: C A Certificate.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf30 Jun 2025
FORM 1 ARCHITECT CERTIFICATE29 Apr 2025
FORM 2 ENGINEER CERTIFICATE29 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf1 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf12 Dec 2024
Building plan approvalFile: PLAN 1-4_compressed (1).pdf11 Dec 2024
Building plan approvalFile: PLAN 2-4_compressed.pdf11 Dec 2024
Building plan approvalFile: PLAN 3-4_compressed.pdf11 Dec 2024
Building plan approvalFile: PLAN 4-4_compressed.pdf11 Dec 2024
Building plan approvalFile: PLAN 1-3 AMALGAMATION_compressed (1).pdf11 Dec 2024
Building plan approvalFile: PLAN 2-3 AMALGAMATION_compressed.pdf11 Dec 2024
Building plan approvalFile: PLAN 3-3 AMALGAMATION_compressed (3).pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC AMALGAMATION.pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1-4_compressed (1).pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3-3 AMALGAMATION_compressed (3).pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2-3 AMALGAMATION_compressed.pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1-3 AMALGAMATION_compressed (1).pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 4-4_compressed.pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3-4_compressed.pdf11 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2-4_compressed.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf29 Oct 2024
Other - LegalFile: PARTNERSHIP DEED.pdf9 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXTURE A.pdf5 Feb 2024
Other - TechnicalFile: CC VERIFICATION SCREENSHOT.pdf5 Feb 2024
Other - TechnicalFile: ANNEXTURE A- DECLARATION CUM UNDERTAKING.pdf3 Feb 2024
Declaration in FORM BFile: DECLARATION IN FORM B.pdf2 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf29 Jan 2024

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOLDEN LAKE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAJ13,700+ in Pune

2 kmGOLDEN LAKECompleted 87Lapsed / revoked 32Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 190 registered projects within 2 km.

Builder: NARSINH ASSOCIATES

NARSINH ASSOCIATES has 1 registration on MahaRERA, including GOLDEN LAKE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GOLDEN LAKE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN LAKE?

The registered promoter entity is NARSINH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN LAKE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN LAKE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN LAKE?

The professionals named in the filing: Architect: RUSHIKESH ZAGADE; Engineer: MAYUR YELE; Chartered Accountant: MILIND PADMAKAR TILWANKAR; Chartered Accountant: GANESH PRABHAKAR DHINDLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN LAKE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN LAKE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN LAKE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.