ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GOLD VALLEY KONKAN BUNGALOWS PHASE2

Registration lapsed No litigation declared Residential / Group Housing project

GOLD VALLEY KONKAN BUNGALOWS PHASE2

By GOKA ENGINEERING COMPANY PVT LTD

RG-MH-05504 · RERA P52000051307 · Last updated on MahaRERA portal: 29 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
54 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

GOLD VALLEY KONKAN BUNGALOWS PHASE2 is a Residential / Group Housing project by GOKA ENGINEERING COMPANY PVT LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000051307 on 8 Jun 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date.

At a glance

Project

  • NameGOLD VALLEY KONKAN BUNGALOWS PHASE2
  • TypeResidential / Group Housing
  • Location
    • KOLAD PUNE ROAD
    • NEAR VILLE BHAGAD MIDC
    • Warachiwadi
    • Mangaon
    • Raigarh
    • 402308
  • Pincode402308
  • RERA no.P52000051307
  • ReraGenie IDRG-MH-05504

Builder

  • NameGOKA ENGINEERING COMPANY PVT LTD
  • Entity typeCompany
  • DirectorsAMOL PRAKASH KANE, PRAKASH VASANT KANE
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

7 months past promisethis monthRegisteredJun 2023PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Jun 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
68NA40000
15NA40000
35NA40000
70NA40000
71NA40000
98NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

54 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

6882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
1582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
3582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
7082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
7182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
9882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
6811
1511
3511
7011
7111
9811

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area449 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
AMOL PRAKASH KANEPune (M Corp.)Pune
PRAKASH VASANT KANEPune (M Corp.)Pune
ASHOK SADASHIV KADUPune (M Corp.)Pune
VAISHALI MUKUND POTDARPune (M Corp.)Pune

Approvals and building plan

Permissible FSI449.31
Proposed, not sanctioned449 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPALSHET

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH RAJE
EngineerDHANANJAY SAKHREKAR
Chartered AccountantNEETA SULAKHE
Chartered AccountantMOHINI MUNSHI
PartnerRole in project
GOKA ENGINEERING COMPANY PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE II FORM 1.pdf29 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: PHASE II FORM 4.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE II FORM 3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PHASE II FORM 2.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C5 PHASE II FORM 3.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C5 PH 2 FORM 1 DEC 23.pdf5 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: CERTIFICATE-_-SOCIETY-C4_C5.pdf5 Jan 2024
Copy of the legal title reportFile: legal title report final.pdf30 May 2023
Proforma of Agreement for saleFile: NEW AFS.pdf12 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf12 May 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCES.pdf25 Apr 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCES.pdf25 Apr 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCES.pdf25 Apr 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCES.pdf25 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 COMPRESSED.pdf25 Apr 2023
Layout approvalFile: LAYOUT.pdf22 Apr 2023
Layout approvalFile: LAYOUT 2.pdf22 Apr 2023
Building plan approvalFile: plan 15.pdf22 Apr 2023
Building plan approvalFile: plan 35.pdf22 Apr 2023
Building plan approvalFile: PLAN 68.pdf22 Apr 2023
Building plan approvalFile: plan 70.pdf22 Apr 2023
Building plan approvalFile: plan 71.pdf22 Apr 2023
Building plan approvalFile: plan 98.pdf22 Apr 2023
PAN CardFile: PAN Card.pdf22 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf22 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT 2.pdf22 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 15.pdf22 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 35.pdf22 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 68.pdf22 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 70.pdf22 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 71.pdf22 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 98.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 15 CC.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 35 CC.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 68 CC.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 70 CC.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 71 CC.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 98 CC NEW.pdf22 Apr 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf22 Apr 2023
Declaration in FORM BFile: Declaration in FORM B.pdf22 Apr 2023
CERSAI detailsFile: 1 CERSAI details.pdf22 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: APK Disclosure of Interest in Other Real Estate Organizations.pdf22 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PVK Disclosure of Interest in Other Real Estate Organizations.pdf22 Apr 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf22 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow22 Apr 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf22 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationStatusPromisedDelivered
GOLD VALLEY KONKAN SECT CWARCHIWADI MANGAON RAIGARH 402308CompletedMar 2022Late, Jun 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOLD VALLEY KONKAN BUNGALOWS PHASE2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR VILLE BHAGAD MIDC5,900+ in Raigarh

Builder: GOKA ENGINEERING COMPANY PVT LTD

GOKA ENGINEERING COMPANY PVT LTD has 2 registrations on MahaRERA, including GOLD VALLEY KONKAN SECT C and GOLD VALLEY KONKAN BUNGALOWS PHASE2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that GOLD VALLEY KONKAN BUNGALOWS PHASE2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GOLD VALLEY KONKAN BUNGALOWS PHASE2 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLD VALLEY KONKAN BUNGALOWS PHASE2?

The registered promoter entity is GOKA ENGINEERING COMPANY PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLD VALLEY KONKAN BUNGALOWS PHASE2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLD VALLEY KONKAN BUNGALOWS PHASE2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLD VALLEY KONKAN BUNGALOWS PHASE2?

The professionals named in the filing: Architect: RAJESH RAJE; Engineer: DHANANJAY SAKHREKAR; Chartered Accountant: NEETA SULAKHE; Chartered Accountant: MOHINI MUNSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLD VALLEY KONKAN BUNGALOWS PHASE2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLD VALLEY KONKAN BUNGALOWS PHASE2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLD VALLEY KONKAN BUNGALOWS PHASE2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.