ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / GOKULPARK TOWER NO 1

Registered No litigation declared Residential / Group Housing project

GOKULPARK TOWER NO 1

By HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED

RG-MH-01601 · RERA P50500006428 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 180 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2033Possession promisedmoved 180 months from the original
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 257 documents Report an error

GOKULPARK TOWER NO 1 is a Residential / Group Housing project by HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500006428 on 14 Aug 2017. Possession is promised by 31 Dec 2033. The completion date has moved by 180 months from the original filing.

At a glance

Project

  • NameGOKULPARK TOWER NO 1
  • TypeResidential / Group Housing
  • Location
    • Besa Road
    • Manish Nagar
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440015
  • Pincode440015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500006428
  • ReraGenie IDRG-MH-01601

Builder

  • NameHARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
  • Entity typeCompany
  • CINU45400MH2007PLC176371
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsMANISH ARVIND BADIYANI, AMIT ARVIND BADIYANI, ARVIND HARIDAS BADIYANI
  • Other registrations4 more →
  • Completed1 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2033

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2033
  • Revised completionRevised to 31 Dec 2033 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed257 files

Current status

57.5%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOKULPARK TOWER NO 1NA98000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GOKULPARK TOWER NO 1: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,275 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI3246.0
Proposed, not sanctioned3,246 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSJTI COMPLEX RESIDENCY ROAD SADAR NAGPUR 440001
Estimated costRs 5.84 cr
Cost incurredRs 3.36 cr
Work done57.45%
BuildingWingEstimatedIncurred
GOKULPARK TOWER NO 1NARs 5.84 crRs 3.36 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUKHSANA BADAR
ArchitectANANT SHRIKANT RAOLE
EngineerMANGESH SAIWALA
EngineerRahul Suresh Yelekar
Chartered AccountantSanjay Lalwani
Chartered AccountantASHISHKUMAR KHAPEKAR
PartnerRole in project
HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500005071Dec 2018 → Dec 2020

Reason as filed by the promoterName of the scheme :- Gokul Park Tower No. 1 (Rera Registration No. P50500006428) Subject:- Extension of time period. The above project was launched in the year 2012 vide Building permit & Commencement Certificate No. B.E. (WEST) / Case No. 4235/ Tracking No. 201204181/7092/1738 Dated 27/09/2012. The actual construction was done as per the actual size of plot which was more than the R. L plot.( R. L. Plot 1274.78 Sq. Mtrs. Actual Plot 1421.05 Sq. Mtrs). We have contructed 17 flats and 3 commercial units. We have given possession of all the units by 21/03/2018. We have sold all the units of the

EXT50500017972Dec 2018 → Dec 2033

Reason as filed by the promoterThe project is delayed due to COVID-19, lack of booking and non availabilty of labour.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2033

Documents filed257

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 257 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: FORM 5GP IUPTOSEPT2024.pdf30 May 2026
Form 5 (FY 2024-2025)File: Form 5GokulParkIupto Sept2025.pdf30 May 2026
Form 2A (FY 2017-2018)File: Form 2A.pdf28 May 2026
Form 2A (FY 2018-2019)File: Form 2A.pdf28 May 2026
Form 2A (FY 2019-2020)File: Form 2A.pdf28 May 2026
Form 2A (FY 2020-2021)File: Form 2A.pdf28 May 2026
Form 2A (FY 2021-2022)File: Form 2A.pdf28 May 2026
Form 2A (FY 2022-2023)File: Form 2A.pdf28 May 2026
Form 2A (FY 2023-2024)File: Form 2A.pdf28 May 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf28 May 2026
Form 2A (FY 2025-2026)File: Gokul Park 1Form 2AApr 2026.pdf28 May 2026
Form 5 (FY 2017-2018)File: Form52018_2019.pdf28 May 2026
Form 5 (FY 2018-2019)File: Form52018_2019.pdf28 May 2026
Form 5 (FY 2019-2020)File: Form52019_2020.pdf28 May 2026
Form 5 (FY 2020-2021)File: Form52020_2021.pdf28 May 2026
Form 5 (FY 2021-2022)File: Form52021_2022.pdf28 May 2026
Form 5 (FY 2022-2023)File: Form52022_2023.pdf28 May 2026
Withdrawal Update Form 1File: Gokul Park 1_Form 1_Apr 2026.pdf14 Apr 2026
Withdrawal Update Form 2File: Gokul Park 1_Form 2_Apr 2026.pdf14 Apr 2026
Withdrawal Update Form 3File: Gokul Park 1_Form 3_Apr 2026_compressed.pdf14 Apr 2026
Withdrawal Update Form 1File: FORM1GPIUPTODEC2025.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM2GPIUPTODEC2025.pdf14 Jan 2026
Withdrawal Update Form 3File: Form3GPIUPTODEC2025_compressed.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1_Gokul Park I_upto Sept2025.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2_Gokul Park I_upto Sept2025.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3_Gokul Park I_upto Sept2025.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1_Gokul Park I_upto Sept2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Form 2_Gokul Park I_upto Sept2025.pdf7 Jan 2026
Withdrawal Update Form 3File: Form 3_Gokul Park I_upto Sept2025.pdf7 Jan 2026
Withdrawal Update Form 1File: GPIFORM1_uptoJune25.pdf27 Nov 2025
Withdrawal Update Form 1File: Form 1_Gokul Park I_upto Sept2025.pdf27 Nov 2025
Withdrawal Update Form 2File: GPIFORM2_uptoJune25.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2_Gokul Park I_upto Sept2025.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Gokul Park I_upto June 2024_compressed.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3_Gokul Park I_upto Sept2025.pdf27 Nov 2025
Form 1File: FORM 1_GP I_UPTO SEPT 2024.pdf26 Nov 2025
Form 2File: FORM 2_GP I_UPTO SEPT 2024.pdf26 Nov 2025
Form 3File: FORM 3_GP I_UPTO SEPT 2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3062023_Sold Unsold_RERA.pdf26 Nov 2025
Form 1File: Form 1_GPI_upto Dec 2024.pdf26 Nov 2025
Form 2File: Form 2_GP1_Dec 2024.pdf26 Nov 2025
Form 3File: GP Tower 1_Form 3_Q3_compressed.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3062023_Sold Unsold_RERA.pdf26 Nov 2025
Form 1File: 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf26 Nov 2025
Form 2File: 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf26 Nov 2025
Form 3File: 19 Certificates of CA (Form 3).pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3062023_Sold Unsold_RERA.pdf26 Nov 2025
Form 1File: Form 1_Gokul Park I_28082023.pdf15 Oct 2025
Form 2File: GPI_UPTOSEP2023FORM2.pdf15 Oct 2025
Form 3File: GPI_UPTOSEP2023_compressed.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: 3062023_Sold Unsold_RERA.pdf15 Oct 2025
Form 1File: Form 1_GP Tower 1_upto dec 2023.pdf15 Oct 2025
Form 2File: Form 2_GP Tower 1_upto dec 2023.pdf15 Oct 2025
Form 3File: GP Tower 1_Form 3__upto Dec 2023_compressed.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: 31032023_Sold Unsold_RERA.pdf15 Oct 2025
Form 1File: Form 1_GP Tower 1_upto March 2024.pdf15 Oct 2025
Form 2File: Form 2 GPI.pdf15 Oct 2025
Form 3File: FORM 3_GP I_Upto march 2024.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Form 3_31032023_Sold Unsold.pdf15 Oct 2025
Form 1File: Form 1_GPI_June 2024.pdf15 Oct 2025
Form 2File: FORM 2 GP I_upto June 2024.pdf15 Oct 2025
Form 3File: Form 3 Gokul Park I_upto June 2024.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Form 3_3062023_Sold Unsold.pdf15 Oct 2025
Form 1File: Form 1_28072017.pdf6 Aug 2025
Form 2File: Form 2_29072017.pdf6 Aug 2025
Form 3File: Form 3_28072017.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2017.pdf6 Aug 2025
Form 1File: Form 1_28072017.pdf6 Aug 2025
Form 2File: Form 2_29072017.pdf6 Aug 2025
Form 3File: Form 3_28072017.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2017.pdf6 Aug 2025
Form 1File: Form 1_28072017.pdf6 Aug 2025
Form 2File: Form 2_29072017.pdf6 Aug 2025
Form 3File: Form 3_28072017.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2017.pdf6 Aug 2025
Form 1File: Form 1_Gokul Park I_10052018.pdf6 Aug 2025
Form 2File: Form 2_Gokul Park I_10052018.pdf6 Aug 2025
Form 3File: Form 3_28072017.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2017.pdf6 Aug 2025
Form 1File: Form 1_Gokul Park I_10052018.pdf6 Aug 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHANTI HEIGHTS BESAAT POST BESA NAGPUR76CompletedDec 2010Dec 2010
SHANTI PARK BESAAT POST BESA-CompletedMar 2007Mar 2007

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 180 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOKULPARK TOWER NO 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manish Nagar2,800+ in Nagpur

2 kmGOKULPARK TOWER NO 1Completed 30Lapsed / revoked 12Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 85 registered projects within 2 km.

Builder: HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED

HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED has 5 registrations on MahaRERA, including HARIHAR NAGAR ZARI PHASE - I and GOKULPARK TOWER NO 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if GOKULPARK TOWER NO 1 is delayed beyond 31 Dec 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKULPARK TOWER NO 1?

The registered promoter entity is HARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED, a company as per the filing. Its CIN U45400MH2007PLC176371 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKULPARK TOWER NO 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKULPARK TOWER NO 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKULPARK TOWER NO 1?

The professionals named in the filing: Architect: RUKHSANA BADAR; Architect: ANANT SHRIKANT RAOLE; Engineer: MANGESH SAIWALA; Engineer: Rahul Suresh Yelekar; Chartered Accountant: Sanjay Lalwani; Chartered Accountant: ASHISHKUMAR KHAPEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULPARK TOWER NO 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULPARK TOWER NO 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULPARK TOWER NO 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.