Home / Browse projects / Thane, Maharashtra / GODREJ VIHAA PHASE 2

Completed No litigation declared Residential / Group Housing project

GODREJ VIHAA PHASE 2

By K. R. REAL ESTATE PVT. LTD.

RG-MH-24390 · RERA P51700002442 · Last updated on MahaRERA portal: 24 Nov 2022

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2022Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

GODREJ VIHAA PHASE 2 is a Residential / Group Housing project by K. R. REAL ESTATE PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700002442 on 1 Aug 2017. The registration is recorded completed; possession was promised by 14 Aug 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGODREJ VIHAA PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421502
  • Pincode421502
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002442
  • ReraGenie IDRG-MH-24390

Builder

  • NameK. R. REAL ESTATE PVT. LTD.
  • Entity typeCompany
  • Managing DirectorsRAM KANTILAL MAKHECHA, ANJANA RAM MAKHECHA, VIJAY KANTILAL MAKHECHA
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedAug 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion14 Aug 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3NA80000
BUILDING NO 4 wing A and BNA150000
BUILDING NO 13 wing A , B and CNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 24 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 4 wing A and B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 13 wing A , B and C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 24 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes100%
ClubhouseYes0%

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered80
Open Space70
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 3111930
BUILDING NO 4 wing A and B361955
BUILDING NO 13 wing A , B and C333265

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,065 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GODREJ PROPERTIES LTD.( AS DEVELOPMENT MANAGER)KurlaMumbai Suburban

Approvals and building plan

Permissible FSI14587.73
Proposed, not sanctioned14,588 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKonark Darshan, New survey no 1000, CTS no 1195, Zaver Road, Mulund West, Mumbai 400080

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMandviwala Qutub And Associates
EngineerKHASNIS AND ASSOCIATES
PartnerRole in project
K. R. REAL ESTATE PVT. LTD.-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000198565MR. SANDEEP ASARK. P. REAL STATE PRIVATE LTD.07/10/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jul 2022

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: P2_MAHARERA FORM 5 For annual report of CA (2) 2020-21.pdf24 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: P2_MAHARERA FORM 5 For annual report of CA (2) 2021-22.pdf24 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Phase 2.pdf27 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold-Unsold GV2.pdf19 Jul 2022
Architect’s Certificate on Completion of Project (Form 4)File: Godrej Vihaa Phase 2-Completion Certificate.pdf18 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Godrej Vihaa Phase 2_EC_ June'22.pdf16 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Godrej Vihaa Phase 2_EC_ June'22.pdf16 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200242372497_For_Asset_Based_Search_16_07_2022_21_15_40_119.pdf16 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf16 Jul 2022
OtherFile: Society Registration Certificate - Phase 2.pdf29 Jun 2022
Declaration about Commencement CertificateFile: CC- DECLARATION- PHASE-2.pdf27 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 2.pdf24 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Godrej Vihaa Phase 2_EC_ March'22.pdf24 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_GV_Phase 2_April 2021.pdf24 Jun 2022
Certificates of CA (Form 3)File: PHASE-2 RERA CERTIFICATE-2.pdf24 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1GVPhase 205012022.pdf17 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Phase 2.pdf17 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KRREPL_FORM 5_2018-19_PHASE 2.pdf3 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KRREPL_FORM 5_2019-20_PHASE 2.pdf3 Nov 2021
Certificates of CA (Form 5)File: KRREPL_FORM 5_2019-20_PHASE 2.pdf21 Nov 2020
Certificates of CA (Form 5)File: KRREPL_FORM 5_2018-19_PHASE 2.pdf18 Oct 2019
Proforma of Allotment letterFile: AFS-1-Godrej-Vihaa-Phase-2--(8-1-2019)-1-22.pdf2 Feb 2019
Proforma of Allotment letterFile: AFS-2-Godrej-Vihaa-Phase-2--(8-1-2019)-23-46.pdf2 Feb 2019
Proforma of Allotment letterFile: AFS-3-Godrej-Vihaa-Phase-2--(8-1-2019)-47-69.pdf2 Feb 2019
OtherFile: ALLOTMENT LETTER- Godrej Vihaa Phase 2.pdf2 Feb 2019
OtherFile: Application form Godrej vihaa phase 2.pdf2 Feb 2019
Certificates of CA (Form 5)File: form 5 GV Phase 2.pdf7 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Godrej Vihaa_C C.pdf23 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 1_AC_5_041217.pdf15 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Godrej Vihaa_Phase 2_AC_5_041217.pdf15 Jan 2018
Certificates of CA (Form 3)File: Godrej Vihaa_Phase 2_CA_5_111217.pdf15 Jan 2018
Proforma of Allotment letterFile: Rera Upload- Part 1- VIHAA - Phase 2- AGREEMENT FOR SALE .pdf31 Oct 2017
Proforma of Allotment letterFile: Rera Upload- Part 1- VIHAA - Phase 2- AGREEMENT FOR SALE -31st Oct 17.pdf31 Oct 2017
Proforma of Allotment letterFile: Rera Upload- Part 2- VIHAA - Phase 2- AGREEMENT FOR SALE -31st Oct 17.pdf31 Oct 2017
Proforma of Allotment letterFile: Rera Upload- Part 3- VIHAA -Phase 2- AGREEMENT FOR SALE -31st Oct 17.pdf31 Oct 2017
Building plan approvalFile: Development Permission.pdf27 Jul 2017
Building plan approvalFile: 06.pdf27 Jul 2017
Building plan approvalFile: 07.pdf27 Jul 2017
Layout approvalFile: 01.pdf27 Jul 2017
Building plan approvalFile: 04.pdf27 Jul 2017
PAN CardFile: PAN_KRREPL.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: 01.pdf27 Jul 2017
Building Plan Approval (IOD)File: Development Permission.pdf27 Jul 2017
Building Plan Approval (IOD)File: 04.pdf27 Jul 2017
Building Plan Approval (IOD)File: 06.pdf27 Jul 2017
Building Plan Approval (IOD)File: 07.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Phase 2.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate PHASE 2.pdf27 Jul 2017
Certificates of CA (Form 3)File: RERA_CA CERTIFICATE_PHASE_2.pdf27 Jul 2017
Proforma of Allotment letterFile: Scanned-VIHAA PHASE 2 ALLOTMENT LETTER.pdf27 Jul 2017
Copy of the legal title reportFile: Title Certificate- Vihaa.pdf26 Jul 2017
Details of encumbrancesFile: Non Encumbrance-Phase 2 Godrej Vihaa 250717.pdf26 Jul 2017
Declaration in FORM BFile: Form B- JVP-Phase 2.pdf26 Jul 2017
Proforma of Allotment letterFile: Scanned -VIHAA Phase 2- RERA-AGREEMENT FOR SALE - Copy.pdf26 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Vakratunda RoyaleT Chidambaram Marg Sion East7CompletedFeb 2017Feb 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GODREJ VIHAA PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Badlapur (M Cl)7,600+ in Thane

2 kmGODREJ VIHAA PHASE 2Completed 56Lapsed / revoked 21Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: K. R. REAL ESTATE PVT. LTD.

K. R. REAL ESTATE PVT. LTD. has 4 registrations on MahaRERA, including GODREJ VIHAA PHASE 1 and GODREJ VIHAA PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GODREJ VIHAA PHASE 2 is delayed beyond 14 Aug 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GODREJ VIHAA PHASE 2?

The registered promoter entity is K. R. REAL ESTATE PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GODREJ VIHAA PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GODREJ VIHAA PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GODREJ VIHAA PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GODREJ VIHAA PHASE 2?

The professionals named in the filing: Architect: Mandviwala Qutub And Associates; Engineer: KHASNIS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GODREJ VIHAA PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GODREJ VIHAA PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GODREJ VIHAA PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.