Home / Browse projects / Thane, Maharashtra / Godrej Bayview

Registered Litigation declared Residential / Group Housing project

Godrej Bayview

By Suncity Infrastructures (Mumbai) LLP

RG-MH-53471 · RERA P51700031726 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 12 months from the original
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 79%
67 of 244Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Godrej Bayview is a Residential / Group Housing project by Suncity Infrastructures (Mumbai) LLP in Thane, Maharashtra, registered with MahaRERA as P51700031726 on 8 Nov 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 12 months from the original filing. 177 of the 244 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Bayview
  • TypeResidential / Group Housing
  • Location
    • Juhu Chowpatty Road
    • Vashi
    • Navi Mumbai (M Corp.)
    • Thane
    • 400703
  • Pincode400703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031726
  • ReraGenie IDRG-MH-53471

Builder

  • NameSuncity Infrastructures (Mumbai) LLP
  • Entity typeOthers
  • Named personsGodrej Projects (SOMA) LLP, Godrej Projects Development Limited, Swapna Sarang Raut
  • Other registrations1 more →

Key dates

this monthRegisteredNov 2021First promiseDec 2027Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Nov 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2027)
  • Buildings2 building records
  • Documents filed119 files

Current status

73%177 of 244 units booked
49.1%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 2NA29241130113
Tower 3NA29241310131

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 79%.

Tower 253%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure79%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 318%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed337

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots337
Closed/Covered337
BuildingClosed/CoveredTotal
Tower 2159159
Tower 3178178

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,750 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Declared on19 Aug 2026
LandownerVillageDistrict
Gulmohar Cooperative Housing SOcietyKurlaMumbai Suburban
Sai Ashirwad Cooperative HousingLimitedKurlaMumbai Suburban
Utkarsh Cooperative Housing Society LimitedKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI14161.08
Proposed, not sanctioned14,161 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJeevan Prakash Building, Sir PM Road, Mumbai 400001
Estimated costRs 156.07 cr
Cost incurredRs 76.60 cr
Work done49.08%
BuildingWingEstimatedIncurred
Tower 3NARs 75.22 crRs 33.27 cr
Tower 2NARs 63.40 crRs 43.33 cr
-NARs 17.46 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
EngineerRajendra V Joshi
EngineerVINYASA CONSULTANTS
EngineerSamartha Constro Consultants LLP
Chartered AccountantBSR and Co. LLP ( 101248W/W-100022)
Chartered AccountantAKPJ & Associates
Chartered AccountantB S R & Co. LLP
PartnerRole in project
Suncity Infrastructures (Mumbai) LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18072621791Dec 2027 → Dec 2028

Reason as filed by the promoter1. The project is approximately 45% completed. 2. Form B has been uploaded. 3. The PERT Chart is uploaded. 4. The project was delayed due to the following reasons:- - Post COVID-19 Impact resulting into labour shortages, delays in procurement of construction materials, and escalation in construction and labour costs, low sales, flow of revenue and War Situation. totaling the Delay of more than 12 months 5. Application for extension for 12 months, i.e., up to 31/12/2028 u/s. 6 6. The Promoter assures the Hon'ble Authority that the project shall be completed within the extended period and the Oc

Litigation declared2

CaseCourtStatus
25914/2021Bombay High CourtClosed
440/2022Bombay High CourtClosed

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000199297MOHAMMED ALI ABDUL ABDUL MUTHALIFSUNCITY INFRASTRUCTURES (MUMBAI)LLP07/12/2021
CC006000000480072PRAKASH HARIRAM LOHIAGODREJ BAYVIEW16/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Bayview - Q1FY27 - Signed.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 - Bayview - Q1FY27 - Signed.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 - Bayview - Q1FY27 - Signed.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Bayview - Vashi - Signed.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 - Vashi - T2 and T3.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Vashi - T2 and T3.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - Vashi - T2 and T3 - Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Vashi Withdrawal Application Form1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Godrej Bayview Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Godrej Bayview Dec 25.pdf20 Jan 2026
Withdrawal Update Form 1File: Signed_Withdrawal Application Form1_Bayview.pdf18 Oct 2025
Withdrawal Update Form 2File: RERA-GODREJ VASHI_Suncity EC_SEPTu002725-Final.pdf18 Oct 2025
Withdrawal Update Form 3File: Withdrawl update_form3_Bayview_Sept 2025.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Godrej Bayview Form 5 FY 24-25.pdf28 Aug 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 T2 and T3.pdf19 Jul 2025
Withdrawal Update Form 2File: Form2 Bayview.pdf19 Jul 2025
Withdrawal Update Form 3File: Bayview T2 and T3 CA Certificate Jun 25.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: rev Bayview Q.A Certificate FY 2025.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar 25_compressed.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2025.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Mar 2025.pdf17 Apr 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter to Registrar.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed_ Form1_RERA certificate Vashi Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed_GODREJ VASHI_Suncity DEC'24-Final.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form 3_CA CERTIFICATE (22).pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q3 FY 25.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q3 FY 25_Corrected .pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed_ Form1_RERA certificate Vashi Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed_GODREJ VASHI_Suncity DEC'24-Final.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form 3_CA CERTIFICATE (22).pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q3 FY 25.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q3 FY 25_Corrected .pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed_ Form1_RERA certificate Vashi Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form 3_CA CERTIFICATE (22).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed_GODREJ VASHI_Suncity DEC'24-Final.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q3 FY 25.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q3 FY 25_Corrected .pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Vashi Sep 24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ VASHI_Suncity SEPT'24-Final.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certicate_compressed.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Q2 Fy 2024-25.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Vashi Sep 24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ VASHI_Suncity SEPT'24-Final.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certicate_compressed.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Q2 Fy 2024-25.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Vashi Sep 24.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certicate_compressed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ VASHI_Suncity SEPT'24-Final.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Q2 Fy 2024-25.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Bayview Form 5 FY 2023 24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Bayview Form 5 FY 2023 24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Bayview Form 5 FY 2023 24.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5_Suncity Signed deliverables.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bayview Rera Certificate June 2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ VASHI_ENGG CERTIFICATE Q1.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sold Q1 FY 25.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE BAYVIEW Q1 compressed _compressed.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Certificate FY 24.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Bayview RERA Archi Q4.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bayview Q4 Engg- RERA.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Bayview Q4.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Q3 FY 2024.pdf3 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Godrej Bayview QA Certificate FY 2022.pdf7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2023.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate for Dec 2023 signed.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ VASHI_Suncity DEC' 23 signed.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned CA certificate.pdf22 Jan 2024
Home Buyer /Allottee Grievance Redressal CellFile: Grievance Redressal Cell Details.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Bayview Suncity_RERA certificate for Sep 2023.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate_ 30th sept_ GODREJ VASHI_Suncity SEPT' 23-Final.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Godrej Bayview 30th sept.pdf17 Oct 2023
Proforma of Allotment letterFile: Vashi App Form.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Bayview RERA certificate for June 2023.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi GODREJ VASHI_Suncity APR' 23-Final.pdf25 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Mar -23 Vashi Project_compressed.pdf20 Apr 2023

How this compares with Thane

73%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Bayview on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vashi7,600+ in Thane

2 kmGodrej BayviewCompleted 11Lapsed / revoked 4Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: Suncity Infrastructures (Mumbai) LLP

Suncity Infrastructures (Mumbai) LLP has 2 registrations on MahaRERA, including Godrej Bayview and Seabreeze at Godrej Bayview. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Godrej Bayview is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Bayview?

The registered promoter entity is Suncity Infrastructures (Mumbai) LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Bayview?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Bayview?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Bayview?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Bayview?

The professionals named in the filing: Architect: R Design Architects; Engineer: Rajendra V Joshi; Engineer: VINYASA CONSULTANTS; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: BSR and Co. LLP ( 101248W/W-100022); Chartered Accountant: AKPJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Bayview?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Bayview. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Bayview to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.