RG-MH-73572 · RERA P52100034801 · Last updated on MahaRERA portal: 25 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GLOBAL SPACES is a Residential / Group Housing project by MDD REALTY in Pune, Maharashtra, registered with MahaRERA as P52100034801 on 28 Apr 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameGLOBAL SPACES
- TypeResidential / Group Housing
- Location
- GAT NO. 495/3
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100034801
- ReraGenie IDRG-MH-73572
Builder
- NameMDD REALTY
- Entity typePartnership
- PartnersRAHUL RAVINDRA DUDHEKAR, GANESH VASANT MHASKE, DUSHYANT DILIP DHERE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Apr 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GLOBAL SPACES A | NA | 17 | 0 | 0 | 0 | 0 |
| GLOBAL SPACES B | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 80%.
GLOBAL SPACES A35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GLOBAL SPACES B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed92
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| GLOBAL SPACES A | 86 | 86 |
| GLOBAL SPACES B | 6 | 6 |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DUSHYANT DILIP DHERE | Pune (M Corp.) | Pune |
| GANESH VASANT MHASKE | Pune (CB) | Pune |
| RAHUL RAVINDRA DUDHEKAR | Pune (CB) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHENDRA THAKUR & ASSOCIATES |
| Engineer | RATHI'S GROUP |
| Chartered Accountant | PARAKH SHAH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MDD REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 25 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3__.pdf | 25 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 25 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Final.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf | 26 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf | 26 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf | 26 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 29 Nov 2024 |
| Layout approvalFile: Layout Approval.pdf | 19 Nov 2024 |
| Layout approvalFile: Copy of Layout.pdf | 19 Nov 2024 |
| Building plan approvalFile: Plan Approval.pdf | 19 Nov 2024 |
| Building plan approvalFile: Building Plan Approval.pdf | 19 Nov 2024 |
| Building plan approvalFile: Plan Approval 3.pdf | 19 Nov 2024 |
| Building plan approvalFile: 4 Plan Approval .pdf | 19 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 19 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout.pdf | 19 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Approval.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Approval 3.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Plan Approval .pdf | 19 Nov 2024 |
| Layout approvalFile: S041000113_2407041153000.pdf | 22 Oct 2024 |
| Layout approvalFile: fjj001 (3)_compressed.pdf | 22 Oct 2024 |
| Building plan approvalFile: fjj002 (3)_compressed.pdf | 22 Oct 2024 |
| Building plan approvalFile: vhhh004 (2)_compressed.pdf | 22 Oct 2024 |
| Building plan approvalFile: vhhh006 (1)_compressed.pdf | 22 Oct 2024 |
| Building plan approvalFile: vhhh003 (1)_compressed.pdf | 22 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: fjj001 (3)_compressed.pdf | 22 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: S041000113_2407041153000.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30-06-2024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30-06-2024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31-03-2024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: fjj002 (3)_compressed.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: vhhh004 (2)_compressed.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: vhhh006 (1)_compressed.pdf | 22 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: vhhh003 (1)_compressed.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 13-04-2024_compressed (1).pdf | 20 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_FY 2022-23_Signed.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30-12-2023.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_10-08-2023.pdf | 8 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30-09-2023.pdf | 8 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30-06-2023.pdf | 8 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_31-03-2022.pdf | 8 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_30-06-2022_2nd Quality Assurance Certificate MDD Realty (A Building).pdf | 8 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31-12-2022.pdf | 8 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30-09-2023.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31-03-2023.pdf | 26 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 2022.pdf | 18 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: annexure A.pdf | 21 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate MDD Realty_A AND B Building-31-12-2022.pdf | 21 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4th Quality Assurance Certificate MDD Realty A AND B Building _31-12-2022.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Signed.pdf | 21 Feb 2023 |
| Details of encumbrancesFile: Non Encrumbance Certificate.pdf | 26 Apr 2022 |
| Declaration about Commencement CertificateFile: Format D.pdf | 26 Apr 2022 |
| Declaration in FORM BFile: Form B.pdf | 26 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 26 Apr 2022 |
| Proforma of Allotment letterFile: Proforma Agreement to Sale.pdf | 26 Apr 2022 |
| CERSAI detailsFile: CERSAI Undertaking.pdf | 18 Apr 2022 |
| Layout approvalFile: Copy of Layout Approval (in case of layout)_Approval.pdf | 17 Apr 2022 |
| Layout approvalFile: Copy of Layout Approval (in case of layout)_Layout.pdf | 17 Apr 2022 |
| Building plan approvalFile: 1 Building Plan Approval_Building A.pdf | 17 Apr 2022 |
| Building plan approvalFile: 2 Building Plan Approval _Building A.pdf | 17 Apr 2022 |
| Building plan approvalFile: 3 Building Plan Approval_Building B.pdf | 17 Apr 2022 |
| Building plan approvalFile: 4 NA Order.pdf | 17 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout Approval (in case of layout)_Approval.pdf | 17 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout Approval (in case of layout)_Layout.pdf | 17 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval_Building A.pdf | 17 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _Building A.pdf | 17 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval_Building B.pdf | 17 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 NA Order.pdf | 17 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates.pdf | 17 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 4 NA Order.pdf | 17 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Apr 2022 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 14 Apr 2022 |
| Details of encumbrancesFile: Details of Encrumbances.pdf | 14 Apr 2022 |
| Proforma of Allotment letterFile: Proforma Allotment Letter.pdf | 11 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GLOBAL SPACES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARHOLI13,700+ in Pune
Filed coordinates, straight-line distance. 196 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: MDD REALTY
MDD REALTY has 1 registration on MahaRERA, including GLOBAL SPACES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GLOBAL SPACES shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GLOBAL SPACES is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GLOBAL SPACES?
The registered promoter entity is MDD REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GLOBAL SPACES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GLOBAL SPACES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GLOBAL SPACES?
The professionals named in the filing: Architect: MAHENDRA THAKUR & ASSOCIATES; Engineer: RATHI'S GROUP; Chartered Accountant: PARAKH SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GLOBAL SPACES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback