ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / GEETANJALI VATIKA AEROCITY

Registration approved Residential/Group Housing project

GEETANJALI VATIKA AEROCITY

By RATNGARBHA VENTURES PRIVATE LIMITED

RG-KA-48962 · RERA PRM/KA/RERA/1250/303/PR/121026/009015

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jump to the 8 documents Report an error

GEETANJALI VATIKA AEROCITY is a Residential/Group Housing project by RATNGARBHA VENTURES PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/121026/009015 on 12 Oct 2026. Possession is promised by 16 Oct 2029.

At a glance

Project

  • NameGEETANJALI VATIKA AEROCITY
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
    • 562110
  • Pincode562110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/303/PR/121026/009015
  • ReraGenie IDRG-KA-48962

Builder

  • NameRATNGARBHA VENTURES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45500BR2018PTC038621
  • GSTIN29AAJCR0316A1ZT
  • Authorized SignatorySANTOSH KUMAR
  • Managing DirectorSANTOSH KUMAR
  • DirectorsSANTOSH KUMAR, KUMARI MONIKA
  • Project HeadSANTOSH KUMAR

Key dates

this monthRegisteredOct 2026PromisedOct 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Oct 2026
  • Promised completion16 Oct 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed8 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GEETANJALI VATIKA AEROCITY---40040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,556 sq m
Named landowners1
LandownerVillageDistrict
P. Gangadhar--

Documents filed8

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/121026/009015 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Registration CertificateFile: Incorporation Certificate.pdf-
Memorandum of AssociationFile: MoA.pdf-
Article of AssociationFile: AoA.pdf-
GST CertificateFile: GST Certificate.pdf-
Organization StructureFile: Organization_Structure.pdf-
Certificate issued by CA Form 1File: Form 1 CA.pdf-
Certificate issued by Architect Form 2File: Form 2 ARC.pdf-
Certificate issued by Engineer Form 3File: Form 3 ENG.pdf-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep GEETANJALI VATIKA AEROCITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmGEETANJALI VATIKA AEROCIOther 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: RATNGARBHA VENTURES PRIVATE LIMITED

RATNGARBHA VENTURES PRIVATE LIMITED has 1 registration on RERA Karnataka, including GEETANJALI VATIKA AEROCITY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if GEETANJALI VATIKA AEROCITY is delayed beyond 16 Oct 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GEETANJALI VATIKA AEROCITY?

The registered promoter entity is RATNGARBHA VENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U45500BR2018PTC038621 and GSTIN 29AAJCR0316A1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GEETANJALI VATIKA AEROCITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in GEETANJALI VATIKA AEROCITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GEETANJALI VATIKA AEROCITY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GEETANJALI VATIKA AEROCITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.