Home / Browse projects / Bengaluru Urban, Karnataka / Prestige Parklane
Prestige Parklane
By APEX REALTY MANAGEMENT PRIVATE LIMITED
RG-KA-36432 · RERA PRM/KA/RERA/1251/309/PR/150926/008941 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Prestige Parklane is a Residential/Group Housing project by APEX REALTY MANAGEMENT PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/150926/008941 on 15 Sep 2026. Possession is promised by 31 Dec 2030. 1,125 of the 1,788 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NamePrestige Parklane
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 562110
- Pincode562110
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/150926/008941
- ReraGenie IDRG-KA-36432
Builder
- NameAPEX REALTY MANAGEMENT PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2018PTC119740
- GSTIN29AARCA7125N1ZY
- Authorized SignatorySwaroop Anish
- MdZAYD NOAMAN
- DirectorsBadrunissa Irfan, ZAYD NOAMAN
- Project HeadSURESH S
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on15 Sep 2026
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings9 building records
- Documents filed104 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-1 | - | - | - | 148 | 0 | 148 |
| Tower-2 | - | - | - | 148 | 0 | 148 |
| Tower-3 | - | - | - | 148 | 0 | 148 |
| Tower-4 | - | - | - | 148 | 0 | 148 |
| Tower-5 | - | - | - | 247 | 0 | 247 |
| Tower-6 | - | - | - | 267 | 0 | 267 |
| Tower-7 | - | - | - | 245 | 0 | 245 |
| Tower-8 | - | - | - | 269 | 0 | 269 |
| Tower-9 | - | - | - | 168 | 0 | 168 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 0% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. Apex Realty Management Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 657.39 cr | Rs 70.51 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 133.83 cr | - |
| Payment of taxes | Rs 95.05 cr | Rs 3.09 cr |
| On-site expenditure-Site Overhead | Rs 83.58 cr | Rs 5.67 cr |
| On-site expenditure-Consultants Fees | Rs 13.07 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. J. Mamtha |
| Engineer | Vinod Kumar R |
| Chartered Accountant | Vivek Harish Kini |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed104
As listed on the registration, under the names the promoter filed them with; the newest 80 of 104 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/150926/008941 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| STP drawing - SignedFile: Parklane - STP drawing - Signed R1.pdf | 10 Sep 2026 |
| Draft AGS PPL - PG 10092026File: Draft AGS PPL - PG 10092026 - RERA.pdf | 10 Sep 2026 |
| Chartered Accountant certificateFile: Form 1 CA Certificate.pdf | 10 Sep 2026 |
| Possession Certificate with SketchFile: POSSESSION CERTIFICATE.pdf | 4 Sep 2026 |
| Project coordinatesFile: SITE WITH LAT AND LONGl overlay.pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 04 Basement - 01 Floor Plan ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 05 Basement - 02 Floor Plan ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 06 Basement - 03 Floor Plan ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 07 Ground Floor Plan ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 08 Ground Floor Plan - Tower-1,2,3 & 4 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 09 Ground Floor Plan - Tower-5,6,7,8 & 9 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 10 First Floor Plan - Tower 1,2,3 & 4 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 11 First Floor Plan - Tower-5,6,7,8 & 9 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 12 Second Floor Plan - Tower-1,2,3 & 4 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 13 Second Floor Plan - Tower-5,6,7,8 & 9 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 14 3rd to 18th & 20th to 24th Floors Plan - Tower 1,2,3 & 4 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 15 3rd to 18th & 20th to 24th Floor Plan - Tower 5,6,7,8 & 9 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 16 19th Floor Plan ( Refuge ) Tower - 1,2,3 &4 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 17 19th Floor Plan ( Refuge ) Tower - 5,6,7,8&9 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 18 Terrace Floor Plan - Tower-1,2,3 & 4 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved Floor PlansFile: 19 Terrace Floor Plan - Tower-5,6,7,8 & 9 ( Residential Block ).pdf | 4 Sep 2026 |
| Approved ElevationFile: Elevation ( Residential Block ).pdf | 4 Sep 2026 |
| Approved SectionFile: Section - AA ( Residential Block ) 1.pdf | 4 Sep 2026 |
| Approved SectionFile: Section - AA ( Residential Block ).pdf | 4 Sep 2026 |
| CDPFile: CDP.png | 4 Sep 2026 |
| Village MapFile: Village Map.png | 4 Sep 2026 |
| Picture 1File: Pic1 (1).jpeg | 4 Sep 2026 |
| Picture 2File: Pic1 (2).jpeg | 4 Sep 2026 |
| Project BrochureFile: Prestige Parklane RERA Brochure.pdf | 4 Sep 2026 |
| Signed SpecificationsFile: Signed Specs.pdf | 4 Sep 2026 |
| 100%, 70%, and 30% Bank account detailsFile: RERA AC Declaration- RERA.pdf | 4 Sep 2026 |
| Chartered Accountant certificateFile: Form 1 CA Certificate.pdf | 4 Sep 2026 |
| Declaration for Loan amount should be deposited into RERA designated accountFile: Declaration for loan.pdf | 4 Sep 2026 |
| Sources of fundsFile: Source of Fund.pdf | 4 Sep 2026 |
| Notarized bank affidavitFile: Notarized Bank Affidavit.pdf | 4 Sep 2026 |
| Chartered accountant KYC - AdhaarFile: Adhaar - Vivek Kini.pdf | 4 Sep 2026 |
| Chartered accountant KYC - PANFile: Pan - Vivek Kini.pdf | 4 Sep 2026 |
| Chartered accountant Membership registration certificateFile: Firm Regn Cert- Vivek Ki.pdf | 4 Sep 2026 |
| Declaration for revenue from sales/ operationFile: Revenue from sales - Clarificat.pdf | 4 Sep 2026 |
| Architect Certificate Form 2File: Form 2 Architecct Certifict.PDF | 4 Sep 2026 |
| Engineer Certificate Form 3File: Form 3 Engineer Certificate.pdf | 4 Sep 2026 |
| MoAFile: MoA - Apex Realty.pdf | 4 Sep 2026 |
| AOAFile: AOA.pdf | 4 Sep 2026 |
| brief project estimationFile: Budget Details.pdf | 4 Sep 2026 |
| Land cost calculation sheet as per the guidance valueFile: Land Guidance Value Details.pdf | 4 Sep 2026 |
| Declaration for annual audit report and quarterly report of the previous projectsFile: Declaration for previous projec.pdf | 4 Sep 2026 |
| STP drawingFile: STP drawing - Signed.pdf | 4 Sep 2026 |
| Stability Certificate with license copyFile: Stability Certificate with license.pdf | 4 Sep 2026 |
| Affidavit cum DeclarationFile: Affidavit cum Declaration.pdf | 4 Sep 2026 |
| Draft AGS PPL - PG 01092026 - RERAFile: Draft AGS PPL - PG 01092026 - RERA.pdf | 4 Sep 2026 |
| Form BFile: Form B.pdf | 4 Sep 2026 |
| No Litigation AffidavitFile: No Litigation Affidavit.pdf | 4 Sep 2026 |
| Non Availability of NOC AffidavitFile: Non Availability of NOC Affidavit.pdf | 4 Sep 2026 |
| Parklane ECFile: Parklane EC.pdf | 4 Sep 2026 |
| Sec 3 AffidavitFile: Sec 3 Affidavit.pdf | 4 Sep 2026 |
| MOEF ReciepitFile: MOEFcc Reciept.pdf | 4 Sep 2026 |
| BESCOM NOC Official Charges Payment receiptFile: BESCOM~1.PDF | 4 Sep 2026 |
| Registration CertificateFile: CERTIFICATE OF INCORPORATION.PDF | - |
| Memorandum of AssociationFile: MoA - Apex Realty.pdf | - |
| Article of AssociationFile: AOA.pdf | - |
| GST CertificateFile: GSTN APEX REALTY MANAGEMENT PRIVATE LIMITED.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architecct Certifict.PDF | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidivit-No Litigation Parklane.pdf | - |
| Balance Sheet 2024 - 2025File: BS 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: BS 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: BS 2022-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: PL 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: PL 2023-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: PL 2022-23.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Prestige Parklane on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
BARCA AT GODREJ MSR CITY
M S RAMAIAH VENTURES LLP
Sattva Vasanta Skye
Sattva Resi Private Limited
EMBASSY GREENSHORE
EMBASSY DEVELOPMENTS LIMITED
EMBASSY VERDE PHASE 2
EMBASSY DEVELOPMENTS LIMITED
Assetz Sora & Saki Phase 2
NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITE
BARCA II AT GODREJ MSR CITY
M S RAMAIAH VENTURES LLP
See every Bengaluru Urban project, with the district possession charts
Builder: APEX REALTY MANAGEMENT PRIVATE LIMITED
APEX REALTY MANAGEMENT PRIVATE LIMITED has 1 registration on RERA Karnataka, including Prestige Parklane. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Prestige Parklane is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Prestige Parklane?
The registered promoter entity is APEX REALTY MANAGEMENT PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2018PTC119740 and GSTIN 29AARCA7125N1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Prestige Parklane?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Prestige Parklane?
The professionals named in the filing: Architect: Ar. J. Mamtha; Engineer: Vinod Kumar R; Chartered Accountant: Vivek Harish Kini. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Prestige Parklane?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.