Home / Browse projects / Bengaluru Rural, Karnataka / EMBASSY VERDE PHASE 2

Registration approved Litigation declared Residential/Group Housing project

EMBASSY VERDE PHASE 2

By EMBASSY DEVELOPMENTS LIMITED

RG-KA-22558 · RERA PRM/KA/RERA/1250/303/PR/201125/008263 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 30 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2031Possession promisedno revision filed
0 of 17Construction stages donefurthest along: Earth work and other leveling..., 30%
5 of 702Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 215 documents Report an error

EMBASSY VERDE PHASE 2 is a Residential/Group Housing project by EMBASSY DEVELOPMENTS LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/201125/008263 on 20 Nov 2025. Possession is promised by 30 Jun 2031. 697 of the 702 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.

At a glance

Project

  • NameEMBASSY VERDE PHASE 2
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
    • 562110
  • Pincode562110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/303/PR/201125/008263
  • ReraGenie IDRG-KA-22558

Builder

  • NameEMBASSY DEVELOPMENTS LIMITED
  • Entity typeCompany
  • CINL45101HR2006PLC095409
  • GSTIN29AABCI5194F1ZE
  • Authorized SignatoryShailendra Konanur Subbaraya
  • Managing DirectorAditya Virwani
  • DirectorsAditya Virwani, Rajesh Kaimal, Sachin Shah, JITENDRA MOHANDAS VIRWANI, Javed Tapia, Tarana Lalwani, Shyamm Mariwala, Kulumani Gopalratnam Krishnamurthy
  • Project HeadHriday Desai
  • Other registrations4 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2025PromisedJun 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Nov 2025
  • Promised completion30 Jun 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed215 files

Current status

99%697 of 702 units booked
12.1%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER B2---2340234
TOWER B3---2340234
TOWER B4---2340234

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 30%.

Building: 2% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work30%
Foundation footing work0%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)Not applicable
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities42

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
UG Sump & Pump RoomYes0%
STPYes0%
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership12

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,303 sq m
Named landowners12
LandownerVillageDistrict
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--
EMBASSY DEVELOPMENTS LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 379.05 cr
Cost incurredRs 45.88 cr
Spent of the estimate12.1%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 317.75 crRs 39.41 cr
Marketing, Brokerage & related incentive costRs 45.30 cr-
Administrative costRs 16.00 cr-
Payment of taxes-Rs 2.51 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJayant Vaitha
EngineerArun Srikanth Nadig
Chartered AccountantRavindranath N

Litigation declared30

CaseCourtStatus
O.S.1329/2006/2006Senior Civil Judge Devanahalli-
O.S. 829/08Senior Civil Judge Devanahalli-
O.S.137/2011/2011Senior Civil Judge Devanahalli-
O.S. 462/132 Additional Senior Civil Judge Devanahalli-
O.S.647/2014/2014Senior Civil Judge Devanahalli-
O.S.490/2015/2015Senior Civil Judge Devanahalli-
O.S.675/2015/2015Senior Civil Judge Devanahalli-
O.S 664/15Senior Civil Judge Devanahalli-
O.S. 354/15Additional Civil Judge & JMFC Devanahalli-
O.S 305/15Principal Civil Judge & JMFC Devanahalli-
O.S 334/15Senior Civil Judge Devanahalli-
O.S 753/15Senior Civil Judge Devanahalli-
O.S 296/15Additional Civil Judge & JMFC Devanahalli-
O.S 306/15Additional Civil Judge & JMFC Devanahalli-
O.S. 349/15Principal Civil Judge & JMFC Devanahalli-
O.S.770/2016/2016Senior Civil Judge Devanahalli-
O.S 152/16Additional Civil Judge & JMFC Devanahalli-
O.S 466/16Senior Civil Judge Devanahalli-
RSA.No.2496/2017/2017High court of Karnataka-
RFA.No.1741/2018 (OS.No.752/2015)The High Court of Karnataka-
O.S.179/2019/2019Senior Civil Judge Devanahalli-
O.S. 385/2019/2019The Principal Civil Judge & JMFC, Devanahalli-
R.F.A.No.2259/2019/2019The High Court of Karnataka-
O.S.826/2020/20201 st Additional Senior Civil Judge Devanahalli-
O.S.759/2020/2020Senior Civil Judge Devanahalli-
O.S.685/2021/20212 Additional Senior Civil Judge Devanahalli-
O.S.No.1144/2022/2022The Principal Senior Civil Judge, Devanahalli-
W.P.No.19800/2025/2025The Hon'ble High Court of Karnataka-
O.S.No.455/2025/2025The Additional Civil Judge, Devanahalli-
O.S.No.143/2025/2025III Additional Senior Civil Judge, Devanahalli-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed215

As listed on the registration, under the names the promoter filed them with; the newest 80 of 215 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/201125/008263 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 EMBASSY VERDE - PHASE 2 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 EMBASSY VERDE - PHASE 2 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 EMBASSY VERDE - PHASE 2 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Embassy Verde Phase 2_CA Certificate_1st Qtly_FY 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Emabssy Verde Phase 2_Archi Certificate_1st Qtly_FY2026-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde Phase 2_Engineer Certificate_1st Qtly_FY 2026-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Embassy Verde Phase 2_CA certificate_4th Qtly_FY 2025-26.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Embassy Verde Phase 2_Architect Certificate_4th Qtly_FY 2025-26_Mar 26.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde Phase 2_Engineer Certificate_4th Qtly_FY 2025-26_Mar 26.pdf14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Embassy Verde Phase 2_CA Certificarte_Q3 25-26.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Embassy Verde Phase 2_Architect Certificate_Q3 25-26.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Embassy Verde Phase 2_Engineer Certificate_Q3 25-26.pdf15 Jan 2026
Embassy Verde Phase 2_Declaration about Sold & Unsold unitsFile: 1 Embassy Verde Phase 2_Declaration about Sold & Unsold units.pdf15 Nov 2025
Embassy Verde Phase 2_Source of Funding for Construction and ApprovalsFile: 2 Embassy Verde Phase 2_Source of Funding for Construction and Approvals.pdf15 Nov 2025
Engineer BBMP License RenewedFile: 3 Engineer BBMP License Renewed.pdf15 Nov 2025
Embassy Verde Phase 2_Form-3 Engineer CertificateFile: 4 Embassy Verde Phase 2_Form-3 Engineer Certificate.pdf15 Nov 2025
Embassy Verde Phase 2_Stability CertificateFile: 5 Embassy Verde Phase 2_Stability Certificate.pdf15 Nov 2025
SEIAA NOC Fee paid receipt with declaration AffidavitFile: 7 SEIAA NOC Fee paid receipt with declaration Affidavit.pdf15 Nov 2025
EDL_Financials_FY 2024-25File: EDL_Financials_FY 2024-25.pdf15 Nov 2025
Embassy Verde Phase 2 Estimated Construction cost SummaryFile: 8 Embassy Verde Phase 2 Estimated Construction cost Summary.pdf15 Nov 2025
Embassy Verde Phase 2_Clarificatory letter to KRERA QueriesFile: 9 Embassy Verde Phase 2_Clarificatory letter to KRERA Queries.pdf15 Nov 2025
RTC, survey 58/1-
Mutation, survey 58/1-
Encumbrance Certificate, survey 58/1-
Conversion/Alienation Order, survey 58/1-
Sale/Title/Gift Deed, survey 58/1-
Khatha, survey 58/1-
RTC, survey 59/2-
Mutation, survey 59/2-
Encumbrance Certificate, survey 59/2-
Conversion/Alienation Order, survey 59/2-
Sale/Title/Gift Deed, survey 59/2-
Khatha, survey 59/2-
RTC, survey 93-
Mutation, survey 93-
Encumbrance Certificate, survey 93-
Conversion/Alienation Order, survey 93-
Sale/Title/Gift Deed, survey 93-
Khatha, survey 93-
RTC, survey 94-
Mutation, survey 94-
Encumbrance Certificate, survey 94-
Conversion/Alienation Order, survey 94-
Sale/Title/Gift Deed, survey 94-
Khatha, survey 94-
RTC, survey 99-
Mutation, survey 99-
Encumbrance Certificate, survey 99-
Conversion/Alienation Order, survey 99-
Sale/Title/Gift Deed, survey 99-
Khatha, survey 99-
RTC, survey 102-
Mutation, survey 102-
Encumbrance Certificate, survey 102-
Conversion/Alienation Order, survey 102-
Sale/Title/Gift Deed, survey 102-
Khatha, survey 102-
RTC, survey 103-
Mutation, survey 103-
Encumbrance Certificate, survey 103-
Conversion/Alienation Order, survey 103-
Sale/Title/Gift Deed, survey 103-
Khatha, survey 103-
RTC, survey 105-
Mutation, survey 105-
Encumbrance Certificate, survey 105-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationStatusPromisedDelivered
EMBASSY VERDEKHATA NO. 175/106/A1, 338/59/7/A2 & 338/59/8/A3, IN SY.NO. 57/3, 57/4, 58/1, 59/2, 59/3, 59/4, 59/5, 59/6, 59/7, 59/8 OF HEGGANAHALLI VILLAGE AND , SY.NOs. 94,95,96,97,99,100,103, 106,109,112,116,119&122 OF NAGAMANGALA VILLAGE , Devanahalli , Bengaluru Rural, KarnatakaOngoingDec 2030Not due yet
EMBASSY PARADISOSy Nos. 73, 75, 76, 117, 118, 120, 121, 123, 124, 126, 127, 129, 130, 132, 133, 135, 136, 138, 139, 141, 142 OF NAGAMANGALA VILLAGE , KUNDANA HOBLI , Devanahalli , Bengaluru Rural, Karnataka -OngoingAug 2027Not due yet

How this compares with Bengaluru Rural

99%of this project is bookeddistrict median 45%
20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep EMBASSY VERDE PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmEMBASSY VERDE PHASE 2Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: EMBASSY DEVELOPMENTS LIMITED

EMBASSY DEVELOPMENTS LIMITED has 5 registrations on RERA Karnataka, including EMBASSY VERDE and Embassy Springs - Phase 2A, Apartments. Its filings declare 4 earlier projects, none of them declared completed. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if EMBASSY VERDE PHASE 2 is delayed beyond 30 Jun 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of EMBASSY VERDE PHASE 2?

The registered promoter entity is EMBASSY DEVELOPMENTS LIMITED, a company as per the filing. Its CIN L45101HR2006PLC095409 and GSTIN 29AABCI5194F1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in EMBASSY VERDE PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at EMBASSY VERDE PHASE 2?

The professionals named in the filing: Architect: Jayant Vaitha; Engineer: Arun Srikanth Nadig; Chartered Accountant: Ravindranath N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMBASSY VERDE PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMBASSY VERDE PHASE 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMBASSY VERDE PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.