ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GAYATRI APARTMENT

Completed No litigation declared Residential / Group Housing project

GAYATRI APARTMENT

By SANTOSH RAMESH RAUT

RG-MH-25931 · RERA P52000005736 · Last updated on MahaRERA portal: 30 Jan 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

GAYATRI APARTMENT is a Residential / Group Housing project by SANTOSH RAMESH RAUT in Raigarh, Maharashtra, registered with MahaRERA as P52000005736 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2024. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameGAYATRI APARTMENT
  • TypeResidential / Group Housing
  • Location
    • Diksal
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005736
  • ReraGenie IDRG-MH-25931

Builder

  • NameSANTOSH RAMESH RAUT
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 30 Dec 2019)
  • Buildings2 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA60000
WING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
WING A11
WING B11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,450 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1263.2
Proposed, not sanctioned1,263 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT JAMBHAVALI PO GOURKAMATH TAL KARJAT DIST RAIGAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA & K ASSOCIATES
EngineerATUL KUDTARKAR & ASSOCIATES
PartnerRole in project
SANTOSH RAMESH RAUT-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000010067Dec 2019 → Dec 2023

Reason as filed by the promoterTOWN PLANING APPROVAL PENDING DUE TO COVID 19 PANDEMIC

EXT52000003803Dec 2019 → Dec 2020

Reason as filed by the promoterTOWN PLAN REVISED FOR COLLECTOR OF RAIGAD ALIBAUG ATTACH LETTER & RECEIPT.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CERSAI detailsFile: CERSAI_Search_Report_200229093925_For_Debtor_Based_Search_30_01_2022_13_24_07_575.pdf30 Jan 2022
Declaration about Commencement CertificateFile: Rera Sold And Unsold List.pdf1 Aug 2021
Disclosure of sold/ booked inventoryFile: Rera Sold And Unsold List.pdf1 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Atul K Engineer Report 2020-21.pdf20 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Gayatri For 5A 2019-2020 C.pdf20 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Gayatri For 5A 2020-2021 C.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Certificate.pdf21 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf21 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: Gayatri Apartment New Gayatri Letter (1).pdf7 Dec 2019
Certificates of CA (Form 3)File: SOLD UNSOLD LIST.pdf31 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITUTURE 30-07-19.pdf30 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 R C C 30-07-19.pdf30 Jul 2019
Certificates of CA (Form 5)File: Form No 5 C A Letter-New.pdf30 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: R C C NEW LETTER.pdf2 Jun 2018
Certificates of CA (Form 3)File: C A NEW LETTER.pdf2 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf5 May 2018
Building plan approvalFile: BUILDING NO 1 COLLECTOR PASS COMPRESS.PDF24 Feb 2018
Building Plan Approval (IOD)File: BUILDING NO 1 COLLECTOR PASS COMPRESS.PDF24 Feb 2018
Building plan approvalFile: BUILDING NO 1 COLLECTOR PASS compress.PDF29 Dec 2017
Building plan approvalFile: BUILDING NO 1 COLLECTOR PASS compress.PDF29 Dec 2017
Building Plan Approval (IOD)File: BUILDING NO 1 COLLECTOR PASS compress.PDF29 Dec 2017
Building Plan Approval (IOD)File: BUILDING NO 1 COLLECTOR PASS compress.PDF29 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Engineer Cerificate Structural.pdf30 Jul 2017
Certificates of CA (Form 3)File: SANTOSH RAUT.pdf30 Jul 2017
Details of encumbrancesFile: encumbrances certificate.pdf29 Jul 2017
Building plan approvalFile: LAYOUT PLAN COLLECTOR.PDF28 Jul 2017
Layout approvalFile: LAYOUT PLAN COLLECTOR.PDF28 Jul 2017
PAN CardFile: PAN CARD.pdf28 Jul 2017
Copy of the legal title reportFile: search report reduce size done.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN COLLECTOR.PDF28 Jul 2017
Building Plan Approval (IOD)File: LAYOUT PLAN COLLECTOR.PDF28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA DIKSAL COPY.pdf28 Jul 2017
Declaration in FORM BFile: Form B reduce size done.pdf28 Jul 2017
Declaration in FORM BFile: Form B reduce size done.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architectural NEW.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architectural NEW.pdf28 Jul 2017
Proforma of Allotment letterFile: sale agreement.pdf28 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 54 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAYATRI APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Diksal5,900+ in Raigarh

2 kmGAYATRI APARTMENTCompleted 16Lapsed / revoked 18Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: SANTOSH RAMESH RAUT

SANTOSH RAMESH RAUT has 1 registration on MahaRERA, including GAYATRI APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GAYATRI APARTMENT is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAYATRI APARTMENT?

The registered promoter entity is SANTOSH RAMESH RAUT, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAYATRI APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAYATRI APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAYATRI APARTMENT?

The professionals named in the filing: Architect: A & K ASSOCIATES; Engineer: ATUL KUDTARKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAYATRI APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAYATRI APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAYATRI APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.