Home / Browse projects / Thane, Maharashtra / Gaurav Crest
Gaurav Crest
RG-MH-11285 · RERA P51700004316 · Last updated on MahaRERA portal: 5 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gaurav Crest is a Residential / Group Housing project by Ravi Developments in Thane, Maharashtra, registered with MahaRERA as P51700004316 on 9 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 30 months from the original filing. 155 of the 159 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameGaurav Crest
- TypeResidential / Group Housing
- Location
- Hatkesh Road
- Near GCC Club
- Mira-Bhayandar (M Corp.)
- Thane
- 400107
- Pincode400107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700004316
- ReraGenie IDRG-MH-11285
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed99 files
Current status
Figures as on 5 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gaurav Crest | NA | 24 | 21 | 157 | 2 | 159 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
Gaurav Crest: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 82% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 67% |
Progress on shared amenities15
As on 5 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANISH & ASSOCIATES |
| Architect | Design and Concepts |
| Engineer | Subhash Chandra Singh |
| Chartered Accountant | M/s. Dipika Patel & Co. |
| Chartered Accountant | Dhawan & Co. |
| Partner | Role in project |
|---|---|
| Ravi Developments | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was impacted by the COVID-19 outbreak in 2020 and 2021, and the subsequent slow market conditions and labour shortages made it difficult for us to complete the project on time. Therefore, we are requesting an extension of time within which the project shall be completed by the promoter to 31st December 2024.
Reason as filed by the promoterThe project is under construction but because of the following reasons we could not get the project finally completed: 1. The promoter has suffered from financial difficulties due to adverse economic condition in the Indian Real Estate Market. 2. The Parliamentary General election - 2024 & Maharashtra Assembly election - 2024 caused the halt to construction activities due to the absence of Staff. 3. The promoter was not able to procure the skilled labour for the construction due to unfavourable labour market, whereby the labour migrated to their home state to exercise their electoral franchise
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602816 | Ravi Developments | Manish Singh | 14/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Approved Plan Bldg No10.pdf | 5 Feb 2025 |
| Building plan approvalFile: Approved Plan Bldg No10.pdf | 5 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Approved Plan Bldg No10.pdf | 5 Feb 2025 |
| Declaration in FORM BFile: Crest Form-B-Affidavit cum Declaration Notarised.pdf | 5 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2024-25 Q3 _DSC.pdf | 5 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Mira Road_11zon.pdf | 5 Feb 2025 |
| Building Plan Approval (IOD)File: Approved Plan Bldg No10.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Dec-23-Crest_compressed.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sep-23-Crest_compressed.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: March-24-Crest_compressed.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: March-23-Crest_compressed.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: June-24-Crest_compressed.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: June-23-Crest_compressed.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Dec-24-Crest_compressed.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24 Gaurav Crest _DSC.pdf | 27 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23-24 Q4 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 24-25 Q3 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 24-25 Q2 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 24-25 Q1 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23-24 Q3 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23-24 Q2 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23-24 Q1 Form 1 Gaurav Crest.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crest Arc Certificate-Marc-23.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crest Arc Certificate-Dec-22.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crest Arc Certificate-Sept-22.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crest ArcCertificate-June-22.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2024-25 Q3 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2024-25 Q2_DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2024-25 Q1_DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2023-24 Q4 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2023-24 Q3 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2023-24 Q1 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2022-23 Q4 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2022-23 Q3 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2022-23 Q2 _DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2022-23 Q1_DSC.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Gaurav Crest 2023-24 Q2 _DSC.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Certicate-June-24.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Cerificate-Dec-24.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Certificate-Sep-24.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Certificate-Mar-24.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Certificate-Dec-23.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Certificate-June-23.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Engineer Certificate DT.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Engineer Certificate DT.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Engineer Certificate DT.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Engineer Certificate DT 12-6-2022.pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - Engineer Certificate-Sep 23.pdf | 23 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 23 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Crest.pdf | 11 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23 Gaurav Crest.pdf | 2 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance Form 2A Gaurav Crest.pdf | 31 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 29 Dec 2023 |
| Declaration in FORM BFile: Crest Form B.pdf | 27 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Crest September 2023.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Crest Form 3 2017-18.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Crest Form 3 2018-19.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Crest Form 3 2019-20.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Crest Form 3 2020-21.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Crest Form 3 2021-22.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Crest Form 3 2017-18.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Gaurav Crest 17-18.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Crest Form 3 2018-19.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Gaurav Crest 18-19.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Crest Form 3 2019-20.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gaurav Crest 19-20.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Gaurav Crest 20-21.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gaurav Crest 21-22.pdf | 24 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Crest Decelaration legal 23.pdf | 20 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Crest Decelaration legal 23.pdf | 20 Apr 2023 |
| Declaration about Commencement CertificateFile: Crest Format D CC Decleration 23.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Crest Arc.pdf | 20 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest Engg.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Crest QA 1920.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Crest QA 2021.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Crest QA 2122.pdf | 20 Apr 2023 |
| CERSAI detailsFile: Crest CERSAI 23.pdf | 20 Apr 2023 |
| Declaration about Commencement CertificateFile: Gaurav Crest Declaration on CC.pdf | 31 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc can order.pdf | 25 Sep 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Stay Order.pdf | 25 Sep 2019 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Gaurav Woods i | Mira Road East | 234 | Completed | Dec 2011 | Late, Mar 2012 |
| Gaurav Excellency I | Mira road east | 510 | Completed | Sep 2011 | Late, Mar 2012 |
| Gaurav Valley 2 | Mira road east | 197 | Completed | Feb 2010 | Feb 2010 |
| Gaurav Valley 1 | Mira Road East | 270 | Completed | Mar 2009 | Mar 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Gaurav Crest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near GCC Club7,600+ in Thane
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
Gaurav Excellency
Ravi Developments
RISHITA APARTMENT
SHANTI ENTERPRISE
Rassaz Green Tower B and B1
RASSAZ INFRASTRUCTURE PRIVATE LIMITED
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
Plot No -1A,Sector -19, Vashi Truck Terminal
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
See every Thane project, with the district possession charts
Builder: Ravi Developments
Ravi Developments has 13 registrations on MahaRERA, including Gaurav Excellency and Gaurav Crest. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Gaurav Crest shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Gaurav Crest is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gaurav Crest?
The registered promoter entity is Ravi Developments, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gaurav Crest?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gaurav Crest?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Gaurav Crest?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gaurav Crest?
The professionals named in the filing: Architect: ANISH & ASSOCIATES; Architect: Design and Concepts; Engineer: Subhash Chandra Singh; Chartered Accountant: M/s. Dipika Patel & Co.; Chartered Accountant: Dhawan & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gaurav Crest?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback