Registered No litigation declared Residential / Group Housing project

GALAXY CITY

By GUPTARI INFRA PROJECTS

RG-MH-74664 · RERA P52000016109 · Last updated on MahaRERA portal: 20 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 60 months from the original
87 of 143Construction stages doneacross 13 buildings; furthest along: Excavation, 0%
128 of 246Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 229 documents Report an error

GALAXY CITY is a Residential / Group Housing project by GUPTARI INFRA PROJECTS in Raigarh, Maharashtra, registered with MahaRERA as P52000016109 on 17 Apr 2018. Possession is promised by 30 Apr 2028. The completion date has moved by 60 months from the original filing. 118 of the 246 units on this registration are recorded sold or booked, and 87 of 143 construction stages are filed complete.

At a glance

Project

  • NameGALAXY CITY
  • TypeResidential / Group Housing
  • Location
    • 9 M WIDE ROAD
    • JITE VILLAGE
    • Jite
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000016109
  • ReraGenie IDRG-MH-74664

Builder

  • NameGUPTARI INFRA PROJECTS
  • Entity typePartnership
  • GSTIN27AAPFG5576N1ZH
  • PartnersUNMESH NAMADEV TARI, KARAN PURSHOTTAM ASRANI

Key dates

this monthRegisteredApr 2018First promiseApr 2023Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2018
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 30 Apr 2023)
  • Buildings13 building records
  • Documents filed229 files

Current status

48%118 of 246 units booked
55.1%Work done, per cost certificate

Figures as on 20 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA6533235
BUILDING BNA6533033
BUILDING CNA6544044
BUILDING DNA60000
BUILDING ENA6516016
BUILDING FNA6516016
BUILDING GNA6516016
BUILDING HNA6516016
BUILDING INA6516016
BUILDING JNA5512012
BUILDING KNA6514014
BUILDING LNA6514014
BUILDING MNA6514014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building13

As on 20 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

87 of 143 construction stages are filed complete across 13 buildings. The stage furthest along is Excavation, at 0%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING I82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING J82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING K82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING L91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING M91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed13

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots13
Closed/Covered13
BuildingClosed/CoveredTotal
BUILDING A11
BUILDING B11
BUILDING C11
BUILDING D11
BUILDING E11
BUILDING F11
BUILDING G11
BUILDING H11
BUILDING I11
BUILDING J11
BUILDING K11
BUILDING L11
BUILDING M11

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Mar 2026
LandownerVillageDistrict
PRAMOD GUPTAKurlaMumbai Suburban
MR.PRAMOD GIRJASHANKAR GUPTAKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityDISTRICT COLLECTOR RAIGAD
Permissible FSI6750.0
Proposed, not sanctioned6,750 sq m
Buildings approved13
Buildings sanctioned13

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchyashodhan chs vallabh baug lane ghatkoper east
Estimated costRs 20.95 cr
Cost incurredRs 11.55 cr
Work done55.15%
BuildingWingEstimatedIncurred
BUILDING CNARs 3.89 cr-
BUILDING BNARs 2.76 cr-
BUILDING ANARs 2.75 cr-
-NARs 2.41 crRs 2.41 cr
BUILDING INARs 1.19 crRs 1.19 cr
BUILDING ENARs 1.19 crRs 1.19 cr
BUILDING FNARs 1.19 crRs 1.19 cr
BUILDING GNARs 1.19 crRs 1.19 cr
BUILDING HNARs 1.19 crRs 1.19 cr
BUILDING LNARs 83.07 lakhRs 83.07 lakh
BUILDING MNARs 83.07 lakhRs 83.07 lakh
BUILDING KNARs 81.08 lakhRs 81.08 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN PLUS ARCHITECTS vinay surve
EngineerSAMARTH AGARWAL SAMARTH AGARWAL
EngineerJIGNESH RAJENDRA Dhanawade
Chartered AccountantCA VIKAS M JAIN
PartnerRole in project
GUPTARI INFRA PROJECTS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019708Apr 2023 → Apr 2028

Reason as filed by the promoterGIP/0011/2024-25 Date :26/04/2024 Respected Sir, We highly regret to submit this declaration. we have tried our best to complete our ongoing projects GUPTARI INFRA PROHECTS bearing Maha RERA registration number P52000016109 located at Survey No : 6 6 1/2/3/4/4B AND 67/3 at Jite, Karjat, Raigard, 410201 with given completion date. We hereby submit that we could not complete the project in the given completion time due to following reasons. 1.Due to delay by Maharashtra State Board Electrical Meters of the customers from the department side after giving the application on time and delay in suppl

EXT52000016489Apr 2023 → Apr 2024

Reason as filed by the promoterRespected Sir, We highly regret to submit this declaration. we have tried our best to complete our ongoing projects GUPTARI INFRA PROHECTS bearing Maha RERA registration number P52000016109 located at Survey No : 6 6 1/2/3/4/4B AND 67/3 at Jite, Karjat, Raigard, 410201 with given completion date. We hereby submit that we could not complete the project in the given completion time due to following reasons. 1.non availability of construction material, labour issue and deadly contract work due to economical condition as traveling was restricted for common people and our company was lacking sales

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed229

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 229 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECH LETTER form1 june25.pdf20 Mar 2026
Withdrawal Update Form 1File: ARCHITECH LETTER form1 june25.pdf20 Mar 2026
Withdrawal Update Form 2File: Galaxy City EC 30-06-25.pdf20 Mar 2026
Withdrawal Update Form 2File: Galaxy City EC 30-06-25.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM final.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM final.pdf20 Mar 2026
Form 2A (FY 2024-2025)File: FORM-2A (1).pdf9 Oct 2025
Form 1File: 2025-03-31- Architect RERA certificate.pdf23 Sep 2025
Form 2File: Galaxy City EC 31-03-25_pdf.pdf23 Sep 2025
Form 3File: FORM -3 (1).pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf23 Sep 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Update.pdf23 Sep 2025
Form 1File: 2024-09-30- Architect RERA certificate_ (1).pdf17 Jul 2025
Form 2File: Galaxy City EC 30-09-24...pdf17 Jul 2025
Form 3File: FORM -3 (1).pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf17 Jul 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Update.pdf17 Jul 2025
Form 1File: ARCHITECT FORM.pdf16 Jul 2025
Form 2File: engineer 31-12-24_pdf.pdf16 Jul 2025
Form 3File: Form -3 (1).pdf16 Jul 2025
Self-declaration of Quarterly ProgressFile: Self-Declaration for Quarterly Update.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: merged sold unsold.pdf16 Jul 2025
Building plan approvalFile: LAYOUT PLAN (1).pdf23 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf23 Dec 2024
Building Plan Approval (IOD)File: LAYOUT PLAN (1).pdf23 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: output.pdf16 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH LETTER (1).pdf12 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer certificate (1).pdf12 Oct 2024
Certificates of CA (Form 3)File: CA.pdf10 Oct 2024
Declaration in FORM BFile: Form B Declaration (1) (2) (1).pdf28 May 2024
Certificates of CA (Form 3)File: FORM 3 MAY (1).pdf28 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS Letter scan (1).pdf27 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER (1).pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A QUALITY 22-23.pdf27 May 2024
Commencement Certificates / NA Order for plotted developmentFile: D) Galaxy CC copy (1).pdf26 May 2024
Declaration in FORM BFile: Form B Declaration (1).pdf26 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Guptari Infra - QA Certificate 19-20.pdf26 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Guptari Infra - QA Certificate 20-21.pdf26 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Guptari Infra - QA Certificate 21-22.pdf26 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Guptari Infra - QA Certificate 23-24.pdf26 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold-Dec.pdf26 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold -March.pdf26 May 2024
Certificates of CA (Form 3)File: FORM 3 (1).pdf26 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf26 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD (1).pdf16 May 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf16 May 2024
Certificates of CA (Form 3)File: 30 June 2019.pdf16 May 2024
Certificates of CA (Form 3)File: 30 Sep 2018.pdf16 May 2024
Certificates of CA (Form 3)File: 30 Sep 2019.pdf16 May 2024
Certificates of CA (Form 3)File: 31 Dec 2018.pdf16 May 2024
Certificates of CA (Form 3)File: 31 Dec 2019.pdf16 May 2024
Certificates of CA (Form 3)File: 31 Mar 2019.pdf16 May 2024
Certificates of CA (Form 3)File: Guptari Infra Projects 1.pdf16 May 2024
Certificates of CA (Form 3)File: Guptari Infra Projects 2.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf16 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of agreement for sale1.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 18-19.pdf13 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf13 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf13 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5 21-22.pdf13 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 ENGINEER.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Guptari Infra - QA Certificate 19-20.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Guptari Infra - QA Certificate 20-21.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Guptari Infra - QA Certificate 21-22.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Guptari Infra - QA Certificate 23-24.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Sols Inventory.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf8 May 2024
Declaration about Commencement CertificateFile: deviation commecement certificate.pdf7 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf6 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of agreement for sale.pdf27 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023-12-31- Architect RERA certificate.pdf25 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Galaxy City -- EC 31-12-23.pdf25 Apr 2024
Certificates of CA (Form 3)File: FORM 3_1-4.pdf25 Apr 2024
Certificates of CA (Form 3)File: FORM 3_5-8.pdf25 Apr 2024
Certificates of CA (Form 3)File: FORM 3_9-end.pdf25 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf25 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Report of allotment letter.pdf25 Apr 2024

How this compares with Raigarh

48%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 60 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GALAXY CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JITE VILLAGE5,900+ in Raigarh

2 kmGALAXY CITYCompleted 30Lapsed / revoked 31Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: GUPTARI INFRA PROJECTS

GUPTARI INFRA PROJECTS has 1 registration on MahaRERA, including GALAXY CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GALAXY CITY is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GALAXY CITY?

The registered promoter entity is GUPTARI INFRA PROJECTS, a partnership as per the filing. Its GSTIN 27AAPFG5576N1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GALAXY CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GALAXY CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GALAXY CITY?

The professionals named in the filing: Architect: DESIGN PLUS ARCHITECTS vinay surve; Engineer: SAMARTH AGARWAL SAMARTH AGARWAL; Engineer: JIGNESH RAJENDRA Dhanawade; Chartered Accountant: CA VIKAS M JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GALAXY CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GALAXY CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GALAXY CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.