Home / Browse projects / Raigarh, Maharashtra / Gajvakra Heights
Gajvakra Heights
By Gajvakra Realty Private Limited
RG-MH-74042 · RERA P52000034563 · Last updated on MahaRERA portal: 10 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 28 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gajvakra Heights is a Others project by Gajvakra Realty Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000034563 on 11 Apr 2022. Possession is promised by 30 Apr 2027. The completion date has moved by 28 months from the original filing. 37 of the 84 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameGajvakra Heights
- TypeOthers
- Location
- Hissa No -1
- Mauje Mudre Budruk
- Karjat
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000034563
- ReraGenie IDRG-MH-74042
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Apr 2022
- Promised completion30 Apr 2027
- Revised completionRevised to 30 Apr 2027 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 10 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gajvakra Heights | NA | 10 | 9 | 68 | 16 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
Gajvakra Heights: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 10 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shivaji Nana Bailmare | Karjat | Raigarh |
| Tanaji Nana Bailmare | Karjat | Raigarh |
| Arun Nana Bailmare | Karjat | Raigarh |
| Ravindra Dattatray Bailmare | Karjat | Raigarh |
| Jayashree Dnyaneshwar Kadu | Karjat | Raigarh |
| Vijay Dattatray Bailmare | Karjat | Raigarh |
| Shevantibai Dattatray Bailmare | Karjat | Raigarh |
| Mahendra Dattatray Bailmare | Karjat | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Gajvakra Heights | NA | Rs 20.87 cr | Rs 15.03 cr |
| - | NA | Rs 53.52 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | All Together Associates Architect Rohan Katare |
| Engineer | vastukalp |
| Engineer | Pratik Pravin Bane |
| Chartered Accountant | Kadaya and Associates |
| Chartered Accountant | J B Patel and Associates |
| Partner | Role in project |
|---|---|
| Gajvakra Realty Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-12-2026 to complete the project and fulfil all regulatory requirements.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 10 Sep 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 10 Sep 2026 |
| Withdrawal Update Form 3File: FORM 3 - JUNE 2026.pdf | 10 Sep 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A FY 2025-26.pdf | 1 Sep 2026 |
| Layout approvalFile: NEW APPROVED PLAN.pdf | 23 Jun 2026 |
| Commencement certificateFile: CC.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 23 Jun 2026 |
| Form 1File: Form 1 - Gajvakra Heights as on Dec 2025.pdf | 27 Apr 2026 |
| Form 2File: Form 2 - Gajvakra Heights as on Dec 2025.pdf | 27 Apr 2026 |
| Form 3File: Form 3 - Gajvakra Heights as on Dec 2025.pdf | 27 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gajvakra Heights as on Dec 2025.pdf | 27 Apr 2026 |
| Form 1File: Form 1 - Gajvakra Heights as on June 2025.pdf | 22 Nov 2025 |
| Form 2File: Form 2 - Gajvakra Heights as on June 2025.pdf | 22 Nov 2025 |
| Form 3File: Form 3 - Gajvakra Heights as on June 2025.pdf | 22 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gajvakra Heights as on June 2025.pdf | 22 Nov 2025 |
| Form 1File: Form 1 - Gajvakra Heights as on Sep 2025.pdf | 22 Nov 2025 |
| Form 2File: Form 2 - Gajvakra Heights as on Sep 2025.pdf | 22 Nov 2025 |
| Form 3File: Form 3 - Gajvakra Heights as on Sep 2025.pdf | 22 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Gajvakra Heights as on Sep 2025.pdf | 22 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gajvakra Heights as on March 2025.pdf | 15 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gajvakra Heights as on March 2025.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gajvakra Heights as on March 2025.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 21 Feb 2025 |
| Declaration in FORM BFile: Affidavit cum Declaration _11zon.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate jan heghits_11zon.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gajvakra Heights as on Dec 2024.pdf | 14 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SER29 (1).pdf | 14 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: BANK FORMAT A GH.pdf | 14 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (14) (1).pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANX A.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate 22-23_11zon.pdf | 14 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (15) (1).pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificat 23-24_11zon.pdf | 14 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 heights.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gajvakra Heights as on Sep 2024.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gajvakra Heights as on Dec 2024.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gajvakra Heights as on Dec 2024.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gajvakra Heights as on Sep 2024.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CER HEIGHTS.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (10).pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate178.pdf | 10 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER’S CERTIFICATE (1).pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE HEIGHTS_compressed.pdf | 10 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gajvakra RealityHEIGHTS.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate153 heights.pdf | 30 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFI.pdf | 30 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE HEIGHTS_compressed (1).pdf | 30 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Survey No 21-1.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (7).pdf | 5 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE HEIGHTS.pdf | 25 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT HEIGHTS.pdf | 25 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gajvakra Heights (2)_compressed.pdf | 25 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HEIGHTS ARCHITECH CERTIFICATE.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFIVATE.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-22 HEIGHTS.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HEIGHTS ARCHITECH CERTIFICATE.pdf | 12 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 12 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (4).pdf | 12 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gajavakra heights Architech Certificate_compressed (1).pdf | 28 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate2 (1)_compressed.pdf | 28 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gajvakra Heights (1).pdf | 24 Aug 2022 |
| Copy of the legal title reportFile: LEGAL REPORT.pdf | 5 Apr 2022 |
| PAN CardFile: pancard (2).pdf | 7 Mar 2022 |
| Proforma of Allotment letterFile: Allotment Letter_Gajvakra.pdf | 7 Mar 2022 |
| Proforma of Allotment letterFile: SALE AGREEMENT DRAFT.pdf | 4 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200231281170_For_Asset_Based_Search_28_02_2022_12_36_35_486.pdf | 28 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf | 28 Feb 2022 |
| Declaration about Commencement CertificateFile: CC Declaration Gajvakra.pdf | 5 Feb 2022 |
| Details of encumbrancesFile: whomconcern letter170.pdf | 28 Jan 2022 |
| Declaration in FORM BFile: Promoter Form B Gajvakra_compressed.pdf | 28 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC CERTIFICATE_compressed (1).pdf | 4 Jan 2022 |
| Layout approvalFile: PLAN_rotated_compressed.pdf | 18 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gajvakra Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mauje Mudre Budruk ,Karjat5,900+ in Raigarh
Filed coordinates, straight-line distance. 154 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: Gajvakra Realty Private Limited
GAJVAKRA REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including GAJVAKRA RESIDENCY and Gajvakra Heights. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Gajvakra Heights is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gajvakra Heights?
The registered promoter entity is Gajvakra Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gajvakra Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gajvakra Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gajvakra Heights?
The professionals named in the filing: Architect: All Together Associates Architect Rohan Katare; Engineer: vastukalp; Engineer: Pratik Pravin Bane; Chartered Accountant: Kadaya and Associates; Chartered Accountant: J B Patel and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gajvakra Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.