Home / Browse projects / Gandhinagar, Gujarat / Forreste 5

Valid until 30 Apr 2029 Residential/Group Housing project

Forreste 5

By ARVIND LIMITED

RG-GJ-72103 · RERA PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA10718/300922 · Last updated on GujRERA portal: 26 Jun 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2029Possession promisedno revision filed
10 of 45Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 95%
22 of 98Units unsoldnot recorded sold or booked
Jump to the 45 documents Report an error

Forreste 5 is a Residential/Group Housing project by ARVIND LIMITED in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA10718/300922 on 30 Sep 2022. Possession is promised by 30 Apr 2029. 76 of the 98 units on this registration are recorded sold or booked, and 10 of 45 construction stages are filed complete.

At a glance

Project

  • NameForreste 5
  • TypeResidential/Group Housing
  • Location
    • at Village Karoli
    • Jethalaj
    • Near Khatraj Cross Road
    • Taluka : Kalol
    • District: Gandhinagar
    • Village : Jethalaj
    • Taluko: Kalol
    • Kalol
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA10718/300922
  • ReraGenie IDRG-GJ-72103

Builder

  • NameARVIND LIMITED
  • Entity typeCOMPANY
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2022PromisedApr 2029

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2029
  • Registered on30 Sep 2022
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed45 files

Current status

78%76 of 98 units booked
96.7%Of the estimated cost spent so far

Figures as on 26 Jun 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type A---25025
Type B---24024
Type C---101
Type D---37037
Type E---11011

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building5

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 45 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

Type A33%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing5%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type B45%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure92%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing30%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type C42%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats35%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing25%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type D44%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing25%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type E42%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth85%
Stilt Floor0%
Slabs of Super Structure82%
Internal walls, internal plaster, floorings, doors and windows within flats55%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing25%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes70%
Water supplyYes45%
Sewerage (chamber, lines, septic tank, STP)Yes75%
Storm water drainsYes50%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes65%
Water conservation, rain water harvestingYes75%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area439,124 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 24.25 cr
Cost incurredRs 23.44 cr
Spent of the estimate96.65%
BuildingWingEstimatedIncurred
Type ANARs 10.01 crRs 9.60 cr
Type DNARs 7.46 crRs 7.34 cr
Type ENARs 3.35 crRs 3.20 cr
Type BNARs 2.95 crRs 2.89 cr
Type CNARs 48.24 lakhRs 41.00 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKrunal Patel
ArchitectHiren A Patel
EngineerHiral Makadia (Goma Engineering & Consultancy)

Documents filed45

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA10718/300922 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)26 Jun 2026
Engineer's certificate annexure26 Jun 2026
Accountant's certificate (Form 3)26 Jun 2026
Architect's certificate (Form 1)11 Jun 2026
Site photograph, Type A11 Jun 2026
Site photograph, Type B11 Jun 2026
Site photograph, Type C11 Jun 2026
Site photograph, Type D11 Jun 2026
Site photograph, Type E11 Jun 2026
RERA registration certificate30 Sep 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

78%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep Forreste 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmForreste 5Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: ARVIND LIMITED

ARVIND LIMITED has 2 registrations on GujRERA, including Forreste and Forreste 5. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if Forreste 5 is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Forreste 5?

The registered promoter entity is ARVIND LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Forreste 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Forreste 5?

The professionals named in the filing: Architect: Krunal Patel; Architect: Hiren A Patel; Engineer: Hiral Makadia (Goma Engineering & Consultancy). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Forreste 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Forreste 5. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Forreste 5 to a free account