ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Florence Heights A and B Wing

Completed No litigation declared Residential / Group Housing project

Florence Heights A and B Wing

By M/s Vinayak Developers

RG-MH-66176 · RERA P51800049192 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
10 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 97%
17 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Florence Heights A and B Wing is a Residential / Group Housing project by M/s Vinayak Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049192 on 3 Feb 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 18 months from the original filing. 149 of the 166 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameFlorence Heights A and B Wing
  • TypeResidential / Group Housing
  • Location
    • Malad West
    • Mumbai
    • Malvani
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049192
  • ReraGenie IDRG-MH-66176

Builder

  • NameM/s Vinayak Developers
  • Entity typePartnership
  • GSTIN27AADFV5350K1ZW
  • PartnersSonali Ritesh Lodhavia, Umesh Dattatray Naik, Ramji Premji Vira, Ritej Infrastructure LLP

Key dates

this monthRegisteredFeb 2023First promiseDec 2024Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Feb 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed110 files

Current status

90%149 of 166 units booked
71.6%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Florence Heights A WingNA181776985
Florence Heights B wingB Wing181775681

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 97%.

Florence Heights A Wing76%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises47%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Florence Heights B wing · wing B Wing76%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises47%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32
BuildingClosed/CoveredTotal
Florence Heights A Wing1616
Florence Heights B wing B Wing1616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,607 sq m
Land owned byThe promoter
Named landownersNone
Declared on18 Nov 2025

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI6504.75
Proposed, not sanctioned6,505 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBorivali West
Estimated costRs 31.77 cr
Cost incurredRs 22.75 cr
Work done71.62%
BuildingWingEstimatedIncurred
Florence Heights A WingNARs 14.45 crRs 10.87 cr
Florence Heights B wingB WingRs 14.05 crRs 10.58 cr
-NARs 3.27 crRs 1.30 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceMoulders
ArchitectSpace Moulders
EngineerRitesh B Lodhavia
Chartered AccountantMNNY and Associates
Chartered AccountantM N N Y & Associated LLP
Chartered AccountantHimani
Chartered AccountantM N N Y & ASSOCIATES LLP
PartnerRole in project
M/s Vinayak Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019241Dec 2024 → Dec 2025

Reason as filed by the promoterThe project is getting delayed due to slow work of the project

EA18112518354Dec 2024 → Jun 2026

Reason as filed by the promoterThe project is nearing completion, and the delay should be considered for the time required for obtaining the Occupation Certificate (OC). We are seeking a six-month extension to cover the OC approval period. Additionally, minor delays occurred due to temporary fund constraints arising from unsold inventory, as the amendment application for adding “B Wing” (submitted on 19/10/2024 & approved on 29.05.2025 ) took around eight months for approval, along with a technical glitch on the MahaRERA portal that erroneously added an extra building (which took around 2-3 months to follow up & rectify wit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full OC.pdf11 Jun 2026
Occupational CertificateFile: OC Verification mail.pdf11 Jun 2026
Withdrawal Update Form 1File: Form-1 Q4.pdf23 Apr 2026
Withdrawal Update Form 2File: Form - 2 Q4.pdf23 Apr 2026
Withdrawal Update Form 3File: Form-3 Q4_compressed.pdf23 Apr 2026
Withdrawal Update Form 1File: Final Form-1.pdf16 Jan 2026
Withdrawal Update Form 2File: Final Form -2.pdf16 Jan 2026
Withdrawal Update Form 3File: Final Form-3_compressed.pdf16 Jan 2026
Withdrawal Update Form 1File: Final Form-1.pdf17 Nov 2025
Withdrawal Update Form 2File: Form-2.pdf17 Nov 2025
Withdrawal Update Form 3File: Final Form-3_compressed.pdf17 Nov 2025
Form 2A (FY 2024-2025)File: FORM-2A.pdf17 Nov 2025
Form 5 (FY 2024-2025)File: Form 5_Final.pdf6 Nov 2025
Withdrawal Update Form 1File: Final Form-1.pdf11 Oct 2025
Withdrawal Update Form 2File: Form-2.pdf11 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1.pdf11 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form-3_compressed.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory JUNE 2023.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory SEPT 2023.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3_compressed.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Form 2.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Format D-Disclosure of Sold Booked Inventory.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_compressed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vinayak Developers .pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf31 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate BAnk Account Details.pdf13 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC -.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: Format D - Disclosure of Sold Inventory.pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf10 Jun 2024
Declaration in FORM BFile: Form B - Affidavit.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 compressed.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form-3_compressed.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VD Architect's certificate Form 1 _Date 31st December 2023.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_compressed.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_compressed.pdf4 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SIGNED FINAL.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_compressed.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf1 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf2 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE RBL.pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed_compressed.pdf2 May 2023
Proforma of Agreement for saleFile: Draft Agreement for sale.pdf31 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for sale_organized_compressed.pdf31 Jan 2023
Declaration in FORM BFile: Form B.pdf20 Jan 2023
Declaration in FORM BFile: FORM B.pdf20 Jan 2023
Layout approvalFile: Page 1_organized.pdf19 Jan 2023
Layout approvalFile: Page 2_organized.pdf19 Jan 2023
Layout approvalFile: Page 3_organized.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: Declaration of No Litigation.pdf19 Jan 2023
Details of encumbrances concerned to LegalFile: Declaration of No Litigation.pdf19 Jan 2023
Copy of Layout Approval (in case of layout)File: Page 1_organized.pdf19 Jan 2023
Copy of Layout Approval (in case of layout)File: Page 2_organized.pdf19 Jan 2023
Copy of Layout Approval (in case of layout)File: Page 3_organized.pdf19 Jan 2023
Other - LegalFile: Partnership deed of Vinayak Developers.pdf19 Jan 2023
Other - TechnicalFile: ( Wing - A) - Carpet Area CertifIcate.pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Ramji Vira.pdf17 Jan 2023

How this compares with Mumbai Suburban

90%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Florence Heights A and B Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai6,700+ in Mumbai Suburban

2 kmFlorence Heights A and BCompleted 8Lapsed / revoked 2Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: M/s Vinayak Developers

M/s Vinayak Developers has 1 registration on MahaRERA, including Florence Heights A and B Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Florence Heights A and B Wing is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Florence Heights A and B Wing?

The registered promoter entity is M/s Vinayak Developers, a partnership as per the filing. Its GSTIN 27AADFV5350K1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Florence Heights A and B Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Florence Heights A and B Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Florence Heights A and B Wing?

The professionals named in the filing: Architect: SpaceMoulders; Architect: Space Moulders; Engineer: Ritesh B Lodhavia; Chartered Accountant: MNNY and Associates; Chartered Accountant: M N N Y & Associated LLP; Chartered Accountant: Himani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Florence Heights A and B Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Florence Heights A and B Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Florence Heights A and B Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.