ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / FLORA CASA

Completed No litigation declared Residential / Group Housing project

FLORA CASA

By Synergy Infra

RG-MH-24023 · RERA P52600007672 · Last updated on MahaRERA portal: 26 Apr 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

FLORA CASA is a Residential / Group Housing project by Synergy Infra in Solapur, Maharashtra, registered with MahaRERA as P52600007672 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Apr 2024. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameFLORA CASA
  • TypeResidential / Group Housing
  • Location
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413003
  • Pincode413003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600007672
  • ReraGenie IDRG-MH-24023

Builder

  • NameSynergy Infra
  • Entity typePartnership
  • PartnersGaurishankar Shivsharan Rugge, Jyoti Ajaysingh Pawar, Uttam Pandurang Patil

Key dates

this monthRegisteredAug 2017First promiseOct 2023Revised toApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 Apr 2024
  • Revised completionRevised to 30 Apr 2024 (originally 30 Oct 2023)
  • Buildings2 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FLORA CASANA100000
FLORA CASA 1NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

FLORA CASA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
FLORA CASA 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered75
Open Space13
BuildingClosed/CoveredOpen SpaceTotal
FLORA CASA751085
FLORA CASA 1033

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,047 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SYNERGY INFRASolapur (M Corp.)Solapur

Approvals and building plan

Permissible FSI12004.11
Proposed, not sanctioned3,004 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHOTGI ROAD SOLAPUR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG S RUGGE
EngineerS S PATNE
EngineerDATTA CHANDRAKANT HONMUTE
Chartered AccountantM M NADAF AND ASSOCIATES
PartnerRole in project
Synergy Infra-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600017876Oct 2023 → Apr 2024

Reason as filed by the promoterDue to delay in buying TDR and loading it , already we are in finishing stage and tend to complete it till March and we have not done any bookings for B building .already we have received completion certificate for A Building.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Apr 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLG A.pdf25 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLG B.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Blg A.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Blg B.pdf25 Apr 2024
Certificates of CA (Form 3)File: FORM 3 compressed.pdf25 Apr 2024
Building plan approvalFile: 5) Rev Plan.pdf23 Apr 2024
Building plan approvalFile: 5) Rev Permission.pdf23 Apr 2024
Building Plan Approval (IOD)File: 5) Rev Plan.pdf23 Apr 2024
Building Plan Approval (IOD)File: 5) Rev Permission.pdf23 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY CERTIFICATE.pdf23 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Completion flora casa.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CASA MAR 23.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CASA SEPT 23.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVT CASA compressed.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CASA MAR 2023 BULD A.pdf16 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CASA MAR 2023 BULD B.pdf16 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CASA SEPT 2023 BULD A.pdf16 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CASA SEPT 2023 BULD B.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A CASA 22-23.pdf16 Oct 2023
Certificates of CA (Form 3)File: FORM 3 CASA MARCH 2023 compressed.pdf16 Oct 2023
Certificates of CA (Form 3)File: FORM 3 CASA SEPT 2023 compressed.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CASA MAR 2023.pdf16 Oct 2023
Details of encumbrances concerned to FinanceFile: declaration about concerned to legal CASA.pdf6 Mar 2023
Details of encumbrances concerned to LegalFile: declaration about concerned to legal CASA.pdf6 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 AR FLORA CASA BLG A.pdf6 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARC FLORA CASA BLD B.pdf6 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A (21-22) FLORA CASA.pdf6 Mar 2023
CERSAI detailsFile: declaration about Cersai CASA.pdf6 Mar 2023
Certificates of CA (Form 3)File: FORM 3 FLORA CASA AS ON DEC 22 Compressed.pdf6 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of other real estate CASA.pdf6 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FLORA CASA 21-22.pdf6 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank acc CASA.pdf6 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PARTLY OCCUPANCY CERTIFICATE 2.pdf4 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PARTLY OCCUPANCY CERTIFICATE 3.pdf4 Jan 2022
OtherFile: DEED OF DECLARATION - INDEX 1.pdf4 Jan 2022
OtherFile: deed of declaration - INDEX 2.PDF4 Jan 2022
OtherFile: DEED OF DECLARATION - INDEX 3.pdf4 Jan 2022
OtherFile: Deed of declaration - INDEX 4.pdf4 Jan 2022
Declaration about Commencement CertificateFile: fLORA Casa Declaration about Commencement.pdf28 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold unsold inventory Flora Casa Building A.pdf28 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: RERA UPDATE SOCIETY.pdf26 Aug 2021
Building plan approvalFile: BUILDING PREMISSION REVISED.pdf28 Jul 2021
Building Plan Approval (IOD)File: BUILDING PREMISSION REVISED.pdf28 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A Casa 20-21.pdf23 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf12 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5.pdf14 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf14 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A FLORA CASA.pdf29 Jan 2020
Certificates of CA (Form 5)File: FORM 5.PDF30 Sep 2019
Building plan approvalFile: Building Permission 01257.pdf10 Sep 2019
Building Plan Approval (IOD)File: Building Permission 01257.pdf10 Sep 2019
OtherFile: PARTLY OCCUPANCY CERTIFICATE.pdf25 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM NO 1.PDF24 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM NO 2.PDF24 Oct 2018
Certificates of CA (Form 5)File: FORM NO 5.PDF24 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA.pdf21 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Apr 2018
Building plan approvalFile: REVISED BUILDING PREMISSION.pdf17 Jan 2018
Building Plan Approval (IOD)File: REVISED BUILDING PREMISSION.pdf17 Jan 2018
Building plan approvalFile: BP.PDF4 Aug 2017
Building Plan Approval (IOD)File: BP.PDF4 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.PDF4 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.PDF4 Aug 2017
Certificates of CA (Form 3)File: CA FORM B.pdf4 Aug 2017
Declaration in FORM BFile: FORM B.PDF3 Aug 2017
Proforma of Allotment letterFile: DRAFT Agreement for Sale.pdf3 Aug 2017
Layout approvalFile: Layout - Flora Casa.pdf1 Aug 2017
Copy of the legal title reportFile: SEARCH REPORT - BY JAMBOTKAR MADAM.pdf1 Aug 2017
Details of encumbrancesFile: SEARCH REPORT - BY JAMBOTKAR MADAM.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: Layout - Flora Casa.pdf1 Aug 2017
PAN CardFile: PAN CARD.PDF31 Jul 2017

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 6 months
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep FLORA CASA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Solapur (M Corp.)550+ in Solapur

2 kmFLORA CASACompleted 13Lapsed / revoked 6Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: Synergy Infra

Synergy Infra has 1 registration on MahaRERA, including FLORA CASA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if FLORA CASA is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLORA CASA?

The registered promoter entity is Synergy Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLORA CASA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FLORA CASA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLORA CASA?

The professionals named in the filing: Architect: G S RUGGE; Engineer: S S PATNE; Engineer: DATTA CHANDRAKANT HONMUTE; Chartered Accountant: M M NADAF AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLORA CASA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLORA CASA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLORA CASA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.