Flamingo city of Valley Phase 1

By FLAMINGO CONSTRUCTIONS PRIVATE LIMITED

RG-MH-26657 · RERA P52100014608 · Last updated on MahaRERA portal: 27 Jun 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
2 of 11Construction stages donefurthest along: Excavation, 25%
1Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Flamingo city of Valley Phase 1 is a Others project by FLAMINGO CONSTRUCTIONS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100014608 on 15 Dec 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameFlamingo city of Valley Phase 1
  • TypeOthers
  • Location
    • Adharwadi
    • TAHMINI
    • Mulshi
    • Pune
    • 411042
  • Pincode411042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014608
  • ReraGenie IDRG-MH-26657

Builder

  • NameFLAMINGO CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSONA PRADIP WALVEKAR, NARENDRA HARBANS DHANOA, MEENA NARENDRA DHANOA

Key dates

this monthRegisteredDec 2017First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed123 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLOTNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 25%.

PLOT: 22% average across the applicable activities

ActivityProgress
Excavation25%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes10%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,165 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17634.89
Proposed, not sanctioned17,015 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B Road Pune

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA CON Architect
EngineerVijay Uttam Jamdar
Chartered AccountantRushikesh Anekar & associates
Chartered Accountantpriyesh jain
Chartered Accountantnilesh raut
PartnerRole in project
FLAMINGO CONSTRUCTIONS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016849Dec 2023 → Dec 2027

Reason as filed by the promoterWe would like to inform the Authority that the development on site is under process and is expected to be completed by 31/12/27. There are no allottees in our project as no plots are sold. So, consent of allottees is not applicable. Hence, we request you to extend proposed date of completion for the Project from 30/12/2023 to revised completion date of 31/12/2027

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504533Pegasus Assets Reconstruction Private Limited Pegasus Assets Reconstruction Private LimitedFLAMINGO CONSTRUCTIONS PRIVATE LIMITED19/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: 30_06_2021 Disclosure.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 30_09_2021 Disclosure.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31-12-2021 disclosure FC-min.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31-03-2022 disclosure FC-min.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 30-06-2022 disclosure FC-min.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 30-09-2022 disclosure FC-min.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31-12-2022 disclosure FC-min.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31_03_2023 Disclosure.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 30_06_2023 Disclosure.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31-03-2019 disclosure FC-min.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31-03-2020 disclosure.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: Sept 23 Disc.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31_12_2023 Disclosure.pdf27 Jun 2025
Disclosure of sold/ booked inventoryFile: 31_03_2024 Disclosure-min.pdf27 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Final RA.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: 30-06-24 disclosure of sold .pdf16 May 2025
Disclosure of sold/ booked inventoryFile: 30-09-24 disclosure of sold .pdf16 May 2025
Disclosure of sold/ booked inventoryFile: 31-12-24 disclosure of sold .pdf16 May 2025
Disclosure of sold/ booked inventoryFile: 31-03-25 disclosure of sold .pdf16 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate- 30 june 24.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 30 sep 24.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 31 dec 24.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate 31 mar 25.pdf3 May 2025
Certificates of CA (Form 3)File: CA certificate 30 June 24.pdf3 May 2025
Certificates of CA (Form 3)File: CA certificate 30 sep 24.pdf3 May 2025
Certificates of CA (Form 3)File: CA certificate 31 dec 24.pdf3 May 2025
Certificates of CA (Form 3)File: CA certificate 31 mar 25.pdf3 May 2025
Certificates of CA (Form 3)File: CA certificate 31 mar 25.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer's certificate 30 June 24.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer's certificate sep 24.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer's certificate 31dec 24.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer's certificate 31 mar 25.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR - March 24.pdf19 Oct 2024
Certificates of CA (Form 3)File: CA Certificate_March 24.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER cert.pdf19 Oct 2024
Certificates of CA (Form 3)File: Adobe Scan Oct 11, 2024 (2).pdf11 Oct 2024
Certificates of CA (Form 3)File: Adobe Scan Oct 11, 2024.pdf11 Oct 2024
Certificates of CA (Form 3)File: Adobe Scan Oct 11, 2024 (1).pdf11 Oct 2024
Certificates of CA (Form 3)File: Adobe Scan Oct 11, 2024 (3).pdf11 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10-Architech Certificate-Sept-23.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Architect Certificate-March 19.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12-Architech Certificate-March-24.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11-Architech Certificate-Dec-23.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9-Architech Certificate-June-23.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8-Architech Certificate-March-23.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7-Architech Certificate-Dec-22.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6-Architech Certificate-Sept-22.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5-Architech Certificate-June-22.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4-Architech Certificate-March-22.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Architect certificate -March 21.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Architect certificate -March 20.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- Sept23 Final.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- June23 Final.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- March22 Final.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- March21 Final.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- March20 Final.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- March19 Final.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificate- Dec23 Final.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11-Engineer Certificate-Dec-23.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10-Engineer Certificate-Sept-23.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9-Engineer Certificate-June-23.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8-Engineer Certificate-March-23.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7-Engineer Certificate-Dec-22.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6-Engineer Certificate-Sept-22.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5-Engineer Certificate-June-22.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4-Engineer Certificate-March-22.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3-Engineer Certificate-March-21.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2-Engineer Certificate-March-20.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1-Engineer Certificate-March-19.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report-Phase1- Final.pdf27 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Viraj - Flamingo 18-19.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Viraj - Flamingo 19-20.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Viraj - Flamingo 20-21.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Viraj - Flamingo 21-22.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Viraj - Flamingo 21-22.pdf22 Jan 2024
CERSAI detailsFile: CERSAI.pdf19 Jun 2023
Proforma of Allotment letterFile: Annexure A.pdf19 Jun 2023
Proforma of Agreement for saleFile: RERA DRAFT PLOT .pdf19 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf19 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation for allotment.pdf19 Jun 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Flamingo city of Valley Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adharwadi13,700+ in Pune

2 kmFlamingo city of Valley Completed 12Lapsed / revoked 12Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: FLAMINGO CONSTRUCTIONS PRIVATE LIMITED

FLAMINGO CONSTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including Flamingo city of Valley Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Flamingo city of Valley Phase 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Flamingo city of Valley Phase 1?

The registered promoter entity is FLAMINGO CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Flamingo city of Valley Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Flamingo city of Valley Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Flamingo city of Valley Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Flamingo city of Valley Phase 1?

The professionals named in the filing: Architect: A CON Architect; Engineer: Vijay Uttam Jamdar; Chartered Accountant: Rushikesh Anekar & associates; Chartered Accountant: priyesh jain; Chartered Accountant: nilesh raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Flamingo city of Valley Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Flamingo city of Valley Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Flamingo city of Valley Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.